• 제목/요약/키워드: KEPCO System

검색결과 1,667건 처리시간 0.025초

배전 종합 자동화 시스템의 현장 실증시험 연구 (A study on field trial systems for distribution automation in KEPCO)

  • 이원빈;신창우;양완식
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1987년도 한국자동제어학술회의논문집; 한국과학기술대학, 충남; 16-17 Oct. 1987
    • /
    • pp.619-624
    • /
    • 1987
  • A study on distribution automation system suitable to distribution system of KEPCO has started since 1984, and the field trial system for ADS will be operated for testing. This paper will describe project and planning for field trial of KEPCO.

  • PDF

바이오가스를 이용한 가스화기 운전 방안 (The Gasifier Operation Method using Bio Gas)

  • 이중원;주용진;정재화;박세익;김의식
    • 한국수소및신에너지학회논문집
    • /
    • 제24권3호
    • /
    • pp.249-254
    • /
    • 2013
  • The integrated gasification combined cycle (IGCC) system is well known for its high efficiency compared with other coal fueled power generation system. The aim of this study is to confirm the feasibility of using bio gas in coal feeding system and syngas recirculation system. The effects of using bio gas in the gasifier on the syngas composition were investigated through simulations using the Aspen Plus process simulator. It was found that these changes had an influence on the syngas composition of the final stream and bio gas can be used in a gasifier system.

Switching Impulse Flashover Tests and Analysis for 765kV Jumper V-strings with Damaged Insulators

  • Choi, In-Hyuk;Shin, Koo-Yong;Lee, Dong-Il;Lim, Jae-Sup;Kim, Young-Hong;Lee, Hyung-Kwon
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권2호
    • /
    • pp.359-363
    • /
    • 2013
  • The 765kV transmission line will be maintained by live-line works for efficient operation. In order to maintain the 765kV transmission lines safely by live-line works, lineman has to know switching impulse flashover characteristics of the jumper V-strings with damaged insulators in advance. In order to know the flashover characteristics this paper carried out experimental flashover mockup tests for jumper V-string with damaged insulators in the outdoors. And it suggests flashover characteristics of the 765kV jumper V-strings also. The results will be used in estimating the safety of live working for 765kV transmission lines.

배전계획 시스템(DISPLAN) 및 배전계통 운영계획 시스템(DLPLAN)의 개발 (The Development of Distribution Planning System and Distribution Line Planning System)

  • 채우규;박창호;정종만;정영호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.73-75
    • /
    • 2004
  • This paper presents the ability and the application of software packages for distribution planning which are DISPLAN(Distribution Planning System) and DLPLAN(Distribution Line Planning System) developed in KEPCO. After calculating size and position of maximum load by administration section for distribution, it forecasts the demand of distribution load considering growth location, increment, new load plan, etc of load by annual. Also it calculates distribution loss, voltage drop using modeled distribution line by you, and support for establishment and enlargement plan of substation and distribution line, decision of most optimal path. And it presents the abstract of used algorithm to develop this system.

  • PDF

Lessons Learned from Energy Storage System Demonstrations for Primary Frequency Control

  • Yu, Kwang-myung;Choi, In-kyu;Woo, Joo-hee
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제4권2호
    • /
    • pp.107-114
    • /
    • 2018
  • In recent years, ESS (Energy Storage System) has been widely used in various parts of a power system. Especially, due to its fast response time and high ramp rate, ESS is known to play an important role in regulating grid frequency and providing rotational inertia. As the number of installed and commercially operating ESSs increases, the reliability becomes an important issue. This paper introduces control schemes and presents its test method for grid-connected ESS for primary frequency regulation. The test method allows to verify the control operation in the individual operation mode and state. A validation of the method through actual ESS test in a electrical substation is presented in the case study section.

확률론적 공급신뢰도 평가를 위한 전압레벨별 데이터베이스 구축방안 (Construction of Database for Reliability Evaluation of the Large Power System)

  • 문승필;신태우;장병훈;전동훈;곽희섭;한경남;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.74-75
    • /
    • 2006
  • The reliability evaluation methods for the bulk power system habe been studied by several electric utilities. The evaluation methods based on the probability theory and the computer packages are being developed or already practicalized. But without correct probabilistic data, accurate result couldn't be expected. In this point, the construction of database is needed. Some of probabilistic data for evaluation of bulk power system are shown in this paper.

  • PDF

토지용도에 따른 부하예측을 이용한 중장기 배전계획 수립 (Long Term Distribution Planning Process using the Forecasting Method of the Land Use)

  • 김준오;박창호;선상진;이재봉;권성철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1447-1449
    • /
    • 1999
  • The KEPCO is developing the load forecasting system using land-use simulation method and distribution planning system. A distribution planning needs the data of present loads, forecasted loads and substations. distribution lines information. By the distribution planning system, the distribution line designer determines the substations and feeder lines plan. This paper presents the method of formulation process for the long term load forecasting and optimal distribution planning, and describes the case study of long term distribution planning of Suwon-city according to the newly applied method.

  • PDF

한전(韓電)EMS의 상태추정기법(狀態推定技法)과 MMI 형식(形式) (State Estimation Method and MMI Format of KEPCO EMS)

  • 이경재;유승철;김영한;이효상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1988년도 전기.전자공학 학술대회 논문집
    • /
    • pp.866-869
    • /
    • 1988
  • In the operation of a power system, the security of the system has acquired significant importance to supply electric power of better quality. The State Estimator, a part of security functions, provides a complete real time solution estimate of the steady-state conditions of the power system for use by the Real Time Network Analysis functions. This paper briefly introduces the Fast Decoupled Weighted Least Square State Estimator which is adopted in the KEPCO EMS with features of Man-Machine Interface.

  • PDF

IED 적합성 인증시험 장치 구축 (Construction of IED Conformance Testing System)

  • 이남호;김지희;장병태;안용호;황갑철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.489-490
    • /
    • 2007
  • In order to construct a digital substation based on IEC61850, All of the utility company should used IEDs to be verified and also vendors should get a certification from the international conformance testing organizationsuch as KEMA. So KEPRI in charge of POWER IT project related to SAS was required to IED conformance testing system, which can perform the test previously. The system, KEPCO developed, consists of HMI, IED (Intelligent Electronic Device), network equipment, V/I generator etc

  • PDF

가공 배전선로 활선 정비 로봇 시스템의 기술 타당성 검토 (Technical Feasibility Study on Live-line Maintenance Robot System for Overhead Distribution Lines)

  • 박준영;이윤건;장영식
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제8권2호
    • /
    • pp.49-53
    • /
    • 2022
  • The distribution live-line work method is an operation method of working in a state in which electricity flows through overhead distribution lines to minimize inconvenience to electric customers due to power failure. In June 2016, to strengthen the safety of electrical workers, Korea Electric Power Corporation announced that it would in principle abolish the rubber glove method, in which workers wore protective equipment such as rubber gloves and performed their maintenance work. In addition, KEPCO announced that it would develop a short-range live working method using smart sticks and an advanced live-line maintenance robot system where workers work without touching wires directly. This paper is a preliminary study for the development of the live-line maintenance robot system, and deals with the results of analyzing the technical feasibility of whether the live works performed by workers can be replaced by robots or not.