• Title/Summary/Keyword: KAB model

Search Result 114, Processing Time 0.024 seconds

The Case of CM Type Supervision Apartment House Construction Work - Focused on the Case of Baekseok-Cheonan 2BL Construction Work - (공동주택건설공사의 CM형 책임감리 사례 - 천안백석 2BL 아파트건설공사 사례를 중심으로 -)

  • Lee, Kab-Weon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.41-48
    • /
    • 2004
  • The objective of the CM model projects is to achieve gradually the development of Domestic Construction, Industry with function, effects, problems and improvement which are the results after assessing tills finished project on the basis of CM Plan. The result is very useful of being activated CM and giving good orders continuously. Therefore this study describes work scope, organization, performance and management process for Baekseok-Cheonan 2BL project and picks out practical problems about CM and then suggests CM technical development directions and institutional improvements.

  • PDF

Position and Force Control for Two Robots with Application to Load Distribution (두 로보트의 위치 및 힘 제어의 부하분배에 관한 응용)

  • Kim, Kab-Il;Jeon, Hun-Jong;Kim, Dong-Jun
    • Proceedings of the KIEE Conference
    • /
    • 1992.07a
    • /
    • pp.414-416
    • /
    • 1992
  • Stability analysis and load distribution problem of two coordinating robots using full dynamic model is studied in this paper. Dynamic models of two robots are combined with the position force control strategy and the Liapunov 2nd method is used for the proof of the stability. This analysis shows that the position and force control of two coordinating robot is always stable. Also, load distribution problem is mentioned with respect to the end-effector forces minimizing joint torques.

  • PDF

A Study on the construction quality infra and it's core confidency priority for enhancing construction certification system (건설공사 품질인증시스템 향상을 위한 품질인프라 및 핵심역량 도출에 관한 연구)

  • Lee, Kab-Soon;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.189-208
    • /
    • 2017
  • This study is for figuring out major components of construction quality infrastructure and suggesting improvement plan by benchmarking global best practice model and analyzing gap between the model and sample practice. Based on improvement plan, researcher could derive major characters and components of construction quality infrastructure, and also about the priority among core competency components of construction quality experts. The result showed that the 'human resource' was ranked the best priority followed by 'method' 'environment', 'equipment' among major characters and components of construction quality infrastructure. Also, for core competency components of construction quality experts, 'number of years in work places' was the best priority, and the 'professional knowledge on engineering' was another priority ranked. Far from general perception on competency components, 'academic education' ranked the last. It may allude that the current education system in this country is not effective in developing competency of quality engineers. In summary, this study shows professionalism of quality engineer is the most important thing in all the components.

Kinetics and Isotherm Analysis of Valuable Metal Ion Adsorption by Zeolite Synthesized from Coal Fly Ash (석탄비산재로부터 합성한 제올라이트를 이용한 유가금속이온의 흡착속도 및 등온 해석)

  • Ahn, Kab-Hwan;Lee, Chang-Han;Lee, Min-Gyu
    • Journal of Environmental Science International
    • /
    • v.27 no.2
    • /
    • pp.83-90
    • /
    • 2018
  • In this study, zeolite (Z-C2) was synthesized using a fusion/hydrothermal method on coal fly ash (FA) discharged from a thermal power plant in the Ulsan area and then analyzed via scanning electron microscopy (SEM) and X-ray diffraction (XRD). The Z-C2 was characterized in terms of mineralogical composition and morphological analysis. The XRD results showed that its peaks had the characteristics of Na-A zeolite in the range of $2{\theta}$ of 7.18~34.18. The SEM images confirmed that the Na-A zeolite crystals had a chamfered-edge crystal structure almost identical to that of the commercial zeolite. The adsorption kinetics of Cu, Co, Mn and Zn ions by Z-C2 were described better by the pseudo-second-order kinetic model more than by the pseudo-first-order kinetic model. The Langmuir model fitted the adsorption isotherm data better than the Freundlich model did. The maximum adsorption capacities of Cu, Co, Mn and Zn ions obtained from the Langmuir model were in the following order : Cu (94.7 mg/g) > Co (77.7 mg/g) > Mn (57.6 mg/g) > Zn (51.1 mg/g). These adsorption capacities are regarded as excellent compared to those of commercial zeolite.

Suggestion and Verification of Assessment model on Construction Cost of Steel Box Girder Bridge in Project Performance Phases (사업 수행 단계별 강박스거더교 공사비 산정 모델 제시 및 검증)

  • Jeon, Eun-Kyoung;Kyung, Kab-Soo;Park, Jin-Eun;Kang, Sin-Hwa
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.1
    • /
    • pp.55-65
    • /
    • 2010
  • To effectively secure and execute the national budget, it is very important to estimate the reasonable construction cost of each process in the construction of public facilities and works. The construction cost is generally estimated at the time when the design of the targeted structures has been completed. Without detailed sectional drawings and with only simple information on bridge structures in the planning stage or in the early design stage. it would be very difficult to predict the approximate construction cost. In this study, a more efficient and appropriate approximate construction cost estimation model in the planning stage and in the early design stage is presented and verified as reliable by analyzing the construction cost data of 61 existing steel box girder bridges from previous studies. The results of this study show that when the construction cost that was predicted using the construction cost estimation model in the design stage was compared with the cost from the conventional standards, the suggested model in this study produced results with a very high confidence level.

UML 2.0 Statechart based Modeling and Analysis of Finite State Model for Cryptographic Module Validation (암호모듈 검증을 위한 UML 2.0 상태도 기반의 유한상태모델 명세 및 분석)

  • Lee, Gang-soo;Jeong, Jae-Goo;Kou, Kab-seung
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.19 no.4
    • /
    • pp.91-103
    • /
    • 2009
  • A cryptographic module (CM) is an implementation of various cryptographic algorithms and functions by means of hardware or software, When a CM is validated or certified under the CM validation program(CMVP), a finite state model(FSM) of the CM should be developed and provided, However, guides or methods of modeling and analysis of a FSM is not well-known, because the guide is occasionally regarded as a proprietary know-how by developers as well as verifiers of the CM. In this paper, we propose a set of guides on modeling and analysis of a FSM, which is needed for validation of a CM under CMVP, and a transition test path generation algorithm, as well as implement a simple modeling tool (CM-Statecharter). A FSM of a CM is modeled by using the Statechart of UML 2.0, Statechart, overcoming weakness of a FSM, is a formal and easy specification model for finite state modeling of a CM.

Report on the Korean Standard Pattern Identifications for Stroke-III (한의 중풍변증표준안-III에 대한 보고)

  • Lee, Ju-Ah;Lee, Jung-Sup;Kang, Byung-Kab;Ko, Mi-Mi;Mun, Tae-Ung;Cho, Ki-Ho;Bang, Ok-Sun
    • The Journal of Internal Korean Medicine
    • /
    • v.32 no.2
    • /
    • pp.232-242
    • /
    • 2011
  • Objectives : The purpose of this study was to develop the Korean standard pattern identifications for stroke-III (KSPIS-III). KSPIS-III includes 4 major pattern identifications (PIs) and clinical indicators for each. Methods : To extract the indicators for 4 major PIs, we analyzed 1548 clinical data from 15 traditional Korean medicine hospitals. Patients got acute stroke within 30 days from onset. Two physicians independently checked 65 indicators and performed pattern diagnosis. If the PI were diagnosed the same, PI would be confirmed. First we built an assumption model that set up the relationship among pattern identifications. Second, we extracted the indicators for fire-heat pattern and qi deficiency pattern by comparison between excessive and deficiency group, heat and non-heat group. By comparing yin deficiency pattern and 3 other patterns respectively, we extracted the indicators for yin deficiency pattern. Dampness-phlegm pattern indicators were extracted by the same method. Results : After cross tabulation with 65 indicators on the basis of our assumption model, we finally extracted 19 indicators for fire-heat pattern, 11 for qi deficiency pattern, 7 for yin deficiency pattern, and 7 for dampness-phlegm pattern. Conclusions : KSPIS-III was more improved than KSPIS-II because it was based on more clinical data. Further study to establish the PI diagnostic model would be required for practical use in the clinical field.

The discrimination model for the pattern identification diagnosis of the stroke (중풍의 변증 진단을 위한 판별모형)

  • Kang, Byeong-Kab;Kang, Kyung-Won;Park, Sae-Wook;Kim, Bo-Young;Kim, Jeong-Chul;Go, Mi-Mi;Seol, In-Chan;Jo, Hyun-Kyung;Lee, In;Choi, Sun-Mi
    • Korean Journal of Oriental Medicine
    • /
    • v.13 no.2 s.20
    • /
    • pp.59-63
    • /
    • 2007
  • The purpose of this study was to diagnosis that what patterns identification using the statistical method. Discriminant analysis using the medical specialist and resident pattern identification agree case in stroke patients within 1 month of onset. The agreement rate of dificiency of Gi(75%), heat-transformation(74%), dampphlegm syndrome(69%), deficiency of Eum(51%) and syndrome of blood stagnation(43%) are respectively 0.75, 0.74, 0.69, 0.51 and 0.43 in medical specialist and using linear discriminant function pattern identification are same. The study of inspection, pulse feeling and palpitation will be continued to evaluate concordance rate. Discrimination model will be make to get higher Accuracy and prediction, it means becomes the help in pattern identification diagnosis objectivity and scientific.

  • PDF

Brain-Machine Interface Using P300 Brain Wave (P300 뇌파를 이용한 뇌-기계 인터페이스 기술에 대한 연구)

  • Cha, Kab-Mun;Shin, Hyun-Chool
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.47 no.5
    • /
    • pp.18-23
    • /
    • 2010
  • In this paper, we propose a computationally efficient method detecting the P300 wave for brain-machine interface. Electrophysiological researches have shown that the P300 wave's potential is decreased when human intention matches visual stimulation. Motivated by this fact, we can infer human intention for brain-machine interface by detecting the P300 wave's potential decrease. The P300 wave is recorded from EEG(electroencephalogram) electrodes attached on human brain skull after giving alphabetical stimulation. To detect the potential decrease in P300, firstly we statistically model the P300 wave's negative potential. Then we infer human intention based on maximum likelihood estimation. The proposed method was evaluated on the data recorded from three healthy human subjects. The method achieved an averaging accuracy of 98% from subject k, 90% from subject j and 79.8% from subject h.

Design and Optimization of Intelligent Service Robot Suspension System Using Dynamic Model (동역학 모델을 활용한 서비스용 지능형 로봇의 현가 시스템 설계 및 최적화)

  • Choi, Seong-Hoon;Park, Tae-Won;Lee, Soo-Ho;Jung, Sung-Pil;Jun, Kab-Jin;Yun, Ji-Won
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.34 no.8
    • /
    • pp.1023-1028
    • /
    • 2010
  • Recently, an intelligent service robot is being developed for use in guiding and providing information to visitors about the building at public institutions. The intelligent robot has a sensor at the bottom to recognize its location. Four wheels, which are arranged in the form of a lozenge, support the robot. This robot cannot be operated on uneven ground because its driving parts are attached to its main body that contains the important internal components. Continuous impact with the ground can change the precise positions of the components and weaken the connection between each structural part. In this paper, the design of the suspension system for such a robot is described. The dynamic model of the robot is created, and the driving characteristics of the robot with the designed suspension system are simulated. Additionally, the suspension system is optimized to reduce the impact for the robot components.