• Title/Summary/Keyword: Just In Sequence

Search Result 131, Processing Time 0.022 seconds

Smart Pallet Based Just-in-sequence Parts Delivery System (스마트 파렛트 기반 직서열 부품공급 시스템)

  • Lee, Young-Doo;Kim, Sang-Rak;Kong, Hyung-Yun;Koo, In-Soo
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.47 no.1
    • /
    • pp.35-41
    • /
    • 2010
  • In order to improve the productivity and the yield at assembling line of finished goods' manufacturers, it is necessary that the fabricated parts are supplied to the assembly line not only just in time (JIT) but also just in sequence (JIS). Parts that are not delivered just in time can cause assembly line to be delayed, and parts that are not delivered just in sequence can cause assembly line to be halted or defected products. For JIT and JIS implementation, in the paper we propose the smart pallet based just-in-sequence parts delivery system in which RFID and USN technologies are converged. Compared with the bar-code based just-in-sequence parts delivery system, the proposed system can reduce unnecessary time for confirming parts' type and sequence and unnecessary cost by bar-code labeling and sequence data' documenting. The proposed system also can overcome the drawbacks of the RFID based just-in-sequence parts delivery system such as transmission range limit and difficulties of confirming parts' type and sequence in real time. Finally, we show the implementation of the proposed system, and its practicality.

Automobile Assembly Sequence System Using Production Information (생산정보를 이용한 자동차 조립 서열시스템에 관한 연구)

  • Ock, Young-Seok;Kim, Byung Soo;Bae, Jun-Hee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.3
    • /
    • pp.8-15
    • /
    • 2014
  • For zero inventory and mixed assembly production, JIT (Just In Time) production system in Toyota and JIS (Just-In-Sequence) production system in Hyundai motor co. have been proposed in automobile production areas. Even though the production systems are popular in the areas, many subcontract companies producing part-modules for final production at a parent company suffers from excessive or shortage amount of inventory due to the time gap of production and delivery to the parent company. In this study, we propose an efficient real-time assembly sequence system applying a well-known Pareto method using Paint-In information in painting process and daily production planning information. Based on this system, a production line can estimate the shortage amount of UPH (Units Per Hour) at production line and recovers the amount before operating assembly production in the line. The proposed system provides efficiency on productivity compared with the previous system.

The Spatial Restructuring and Changes of Locational Pattern of Auto Parts Industry in Korea (자동차 부품산업의 공간적 재구조화와 입지 패턴 변화)

  • Kim, Tae-Whan
    • Journal of the Korean Geographical Society
    • /
    • v.42 no.3 s.120
    • /
    • pp.434-452
    • /
    • 2007
  • The globalization of the economy has strengthened competition in all industries. Facing an intensely competitive environment, the firm's choice of location is one of the most important strategies in enhancing its competitiveness. This paper aims to examine the locational changes and the spatial restructuring of suppliers firm with regard to modularization and customer diversification which result from the process of assembler's restructuring after the financial crisis. Some experimental findings which have been identified throughout this study can be summarized as follows: First, a number of suppliers has been located in the southern Seoul metropolitan area and northern Chungcheong area. And Hyundai's suppliers has been enlarged in the Seoul metropolitan area and Kia's in the Southeastern area. Second, suppliers who transact with several assemblers(network trade) tend to be more dispersed, but dedicated(exclusive) suppliers are more concentrated on assembly plants. Also it was confirmed that 'JIS(Just In Sequence)' system which is more detailed than 'JIT(Just In Time)'system has been used. Third, it was Prominent that suppliers are internalizing in order to reach economies of scale compare to assemblers are externalizing.

Scheduling of a Casting Sequence Under Just-In-Time (JIT) Production (적시 생산 방식에서의 주조공정 스케줄링)

  • Park, Yong-Kuk;Yang, Jung-Min
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.3
    • /
    • pp.40-48
    • /
    • 2009
  • In this article, scheduling of a casting sequence is studied in a casting foundry which must deliver products according to the Just-in-time(JIT) production policy of a customer. When a foundry manufactures a variety of casts with an identical alloy simultaneously, it frequently faces the task of production scheduling. An optimal casting schedule should be emphasized in order to maximize the production rate and raw material efficiency under the constraints of limited resources; melting furnaces and operation time for a casting machine. To solve this practical problem-fulfilling the objectives of casting the assigned mixed orders for the highest raw material efficiency in a way specified by the customer's JIT schedule, we implement simple integer programming. A simulation to solve a real production problem in a typical casting plant proves that the proposed method provides a feasible solution with a high accuracy for a complex, multi-variable and multi-constraint optimization problem. Employing this simple methodology, a casting foundry having an automated casting machine can produce a mixed order of casts with a maximum furnace utilization within the due date, and provide them according to their customer's JIT inventory policy.

PC-Based Hybrid Grid Computing for Huge Biological Data Processing

  • Cho, Wan-Sup;Kim, Tae-Kyung;Na, Jong-Hwa
    • Journal of the Korean Data and Information Science Society
    • /
    • v.17 no.2
    • /
    • pp.569-579
    • /
    • 2006
  • Recently, the amount of genome sequence is increasing rapidly due to advanced computational techniques and experimental tools in the biological area. Sequence comparisons are very useful operations to predict the functions of the genes or proteins. However, it takes too much time to compare long sequence data and there are many research results for fast sequence comparisons. In this paper, we propose a hybrid grid system to improve the performance of the sequence comparisons based on the LanLinux system. Compared with conventional approaches, hybrid grid is easy to construct, maintain, and manage because there is no need to install SWs for every node. As a real experiment, we constructed an orthologous database for 89 prokaryotes just in a week under hybrid grid; note that it requires 33 weeks on a single computer.

  • PDF

Analytical Methodology Obtaining an Optimal Welding Sequence for Least Distortion of Welded Structure (용접구조물의 변형 최소화를 위한 최적 용접순서의 해석적 방법)

  • Ha, Yunsok
    • Journal of Welding and Joining
    • /
    • v.31 no.3
    • /
    • pp.54-59
    • /
    • 2013
  • Several methodologies analyzing welding distortions of large shell structures like ship blocks have been developed and utilized in shipyards for a long times ago. In general, one of objects of thermal distortion analysis is to find welding sequence making least-deformation without any suppliance, and it can be solved easily and rapidly by EP strain-boundary method. But after assembly construction, there are usually more than 10 weldments in each process, and the number of sequence will follow the Factorial calculation. In this research, a method has been suggested to decide the best welding sequence by minimum analysis. Using this method, welding deformation could be reduced just analyzing some cases as many as the number of weldments. Experiments and Analysis of all cases were also done, and their best results are good agreements with predictation by suggested methodology.

PDA System for Maximizing the Efficiency of Smart Pallet Based Rarts Delivery System (스마트 파렛트 기반 부품공급시스템의 운영 효율성 증대를 위한 PDA 시스템)

  • Lee, Young-Du;Koo, In-Soo
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.10 no.4
    • /
    • pp.115-120
    • /
    • 2010
  • Products companies, which manufactures finished goods with modular parts, will expect that the proper parts should be delivered to assembly line not only just in time (JIT) but also just in sequence (JIS) and also expect that faulty goods will not be produced due to the delivery of wrong parts. In order to satisfy the above requirements, recently Smart Pallet based Parts Delivery system (SPPD) was proposed. SPPD system can overcome the drawback of bar code based part delivery system in which much time for checking proper and in sequence parts is wasted due to labors' working in hand as well as the drawback of RFID based part delivery system in which recognition distance of RFID is very limited. In the paper, a PDA system is proposed and further implemented to maximize the efficiency of SPPD's operation as well as to manage the limited power of smart pallets efficiently.

The Advanced Protection Coordination Scheme using Phase Angle of Zero-Sequence Current in Ungrounded System (비접지 계통에서 영상전류 위상을 이용한 개선된 보호협조 방안)

  • Choi, Young-Jun;Lim, Hee-Taek;Choi, Myeon-Song;Lee, Seung-Jae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.1
    • /
    • pp.19-25
    • /
    • 2010
  • Most faults are single-phase-to-ground fault in ungrounded system. The fault currents of single-phase-to-ground are much smaller than detection thresholds of measurement devices, so detecting single-phase-to-ground faults is difficult and important in ungrounded system. The protection coordination method using SGR(Selective Ground Relay) and OVGR(Overvoltage Ground Relay) is generally used in ungrounded system. But this method only detects fault line and it has the possibility of malfunction. This paper proposed to advanced protection coordination method in ungrounded system. The method just using zero-sequence current can detect fault line, fault phase, fault section at terminal device. The general protection method is used to back up protection. In the case study, the proposed method has been testified in demo system by Matlab/Simulink simulations.

A Fault Indicator Generation Algorithm using Phase Angle of Zero-Sequence Current in Ungrounded System (비접지 계통에서 영상전류 위상을 이용한 고장표시 생성 알고리즘)

  • Lim, Hee-Taek;Lim, Il-Hyung;Choi, Myeon-Song;Lee, Seung-Jae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.7
    • /
    • pp.1141-1149
    • /
    • 2008
  • Most faults are single-phase-to-ground fault in ungrounded system. The fault currents of single-phase-to-ground are much smaller than detection thresholds of measurement devices, so detecting single-phase-to-ground faults is difficult and important in ungrounded system. This paper proposed to a FI(Fault Indicator) generation algorithm in ungrounded system. The algorithm just using line-to-line voltage and zero-sequence current detects fault line, fault phase, fault section and FI(Fault Indicator) at terminal device, This paper also proposed to application plan for this algorithm. In the case study, the proposed algorithm has been testified in demo system by Matlab/Simulink simulations.

Sequence analysis of the schizosaccharomycs pombe homologue of the CDC3 gene in saccharomyces cerevisiae

  • Kim, Hyong-Bai
    • Journal of Microbiology
    • /
    • v.33 no.4
    • /
    • pp.350-354
    • /
    • 1995
  • Saccharomyces cervisiae has a highly ordered ring of filaments that lies just inside the cytoplasmic membrane in the region of the mother-bud neck. Mutants defective in any one of the our cell division cycle genes (CDC3, CDC10, CDC11, CDC12) fail to form these filaments and exhibit a pleiotropic phenotype that includes failure to complete cytokinesis and abnormal bud growth. However, the role of the filament is not clear. In order to find out the role of filament, the similar gene in S pombe (called cdc103$\^$+) to the CDC3 was cloned and sequenced. Here I report the sequence analysis of the cdc103$\^$+/ ) to the CDC3 was cloned and sequenced. Here I report the sequence analysis of the cdc103$\^$+/. Comparison of the predicted amino acid sequences of cdc103$\^$+/ and CDC3 revealed that they share significant similarity (43% identity and 56% identity or similarity) to each other.

  • PDF