• Title/Summary/Keyword: Jop Shop

Search Result 5, Processing Time 0.017 seconds

A heuristic technique for jop shop scheduling using operation due dates (공정납기를 이용한 jop shop 일정계획의 발견적 기법)

  • 배상윤;김여근;김영균
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.46-49
    • /
    • 1996
  • This paper presents a multi-pass heuristic for job shop scheduling with due dates. The proposed heuristic iteratively improves solutions based on operation due dates. To find a good solution efficiently, a method for searching the neighborhood of current schedule is developed. The heuristic is compared with two existing heuristics as well as several dispatching rules in terms of solution quality and computation time. The experimental results show that the proposed approach is promising.

  • PDF

Development of heuristic method for job shop scheduling with alternative machines (대안기계를 갖는 Jop Shop scheduling을 위한 발견적기법의 개발)

  • 최동순;정병희
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.10a
    • /
    • pp.303-306
    • /
    • 1996
  • This paper proposes a heuristic method for job shop scheduling with alternative machines. Our heuristic suggests four machine-selecting rules and two priority dispatching rules for modifying existent ones considering alternative machines, and then it extends existing nondelay/active job shop schedule generation. This heuristic provides good criteria(rules) in the selection of a proper machine among those performing a specific operation and for the dispatch of an operation to a selected machine and thus these rules permit the efficient job shop scheduling with alternative machines. The performances of our four machine-selecting rules in addition to the two priority dispatching rules, applied together with the existing 17 rules, are experimented and evaluated, respectively.

  • PDF

Determining Appropriate Production Conditions in Cellular Manufacturing Systems (셀생산(生産)의 효율적(效率的)인 운용(運用)을 위한 시뮤레이션 연구(硏究))

  • Song, Sang-Jae;Choi, Jung-Hee
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.19 no.2
    • /
    • pp.23-34
    • /
    • 1993
  • Although there are numerous studies that address the problem of optimal machine grouping and part family classification for cellular manufacturing, little research has been reported that studies the conditions where cellular manufacturing is appropriate. This paper, in order to evaluate and compare the job shop with the GT cellular shop, the performance of those shops were simulated by using SIMAN. We tested the effect of independent variables including changes of product demands, intercell flow level, group setup time, processing time variability, variety of material handling systems, and job properties (ratio of processing time and material handling time). And also performance measures (dependent variables), such as machine utilization, mean flow time, average waiting time, and throughput rate, are discussed. Job shop model and GT cellular shop written in SIMAN simulation language were used in this study. These systems have sixteen machines which are aggregated as five machine stations using the macro feature of SIMAN. The results of this research help to better understand the effect of production factors on the performance of cellular manufacturing systems and to identify some of the necessary conditions required to make these systems perform better than traditional job shops. Therefore, this research represents one more step towards the characterization of shops which may benefit from cellular manufacturing.

  • PDF