• Title/Summary/Keyword: Job scheduling

Search Result 426, Processing Time 0.026 seconds

frequency Domain processor nor ADSL G.LITE Modem (ADSL G.LITE모뎀을 위한 주파수 영역 프로세서의 설계)

  • 고우석;기준석;고태호;윤대희
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.26 no.12C
    • /
    • pp.233-239
    • /
    • 2001
  • Among the operations in frequency domain for ADSL G.LITE Modem to perform, FFT and FEQ are most computation-intensive part, of which many researches have been focused on the efficient implementation. Previous papers suggested hardwares suitable for ADSL G.DMT system, which is not feasible for simple G.LITE system. The analysis of frequency domain operations and computational efficiency according to the allocation of hardware resources is performed in this paper. The suggested processor has the structure of one real multiplier and two real adders connected in parallel, which can perform the operations efficiently through the pipeline- and/or parallel-type job scheduling. The suggested processor uses less hardware resources than Kiss\`s ALU structure or FFT/IFFT processor suggested by Wang, so the suggested one is more suitable for G.LITE system than previous works.

  • PDF

Application Contents Deploy System based on workflow process a unit based for collaboration in Grid Environment (그리드 환경에서 협업을 위한 워크플로우 프로세스 단위 기반의 애플리케이션 컨텐츠 배포 시스템)

  • Moon, Seok-Jae;Heo, Hyuk;Choi, Young-Keun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.1
    • /
    • pp.172-182
    • /
    • 2008
  • Application Contents of based on a workflow process unit in grid system is a practical work to solve the problem. To construct cooperation environment is very important because the contents are deployed and executed. And the most of cooperation is executed by workflow. Globus toolkit is the middleware for cooperation process in grid environment. However the middleware only provides basic services for constructing grid, not workflow that can provides cooperation, job scheduling, application contents management. Also Globus toolkit is suitable for huge gird community but small size pc based grid community. Therefore, this paper proposes the efficient application contents deployment system for small sizes cooperation. This system supports efficient cooperation environment with Application contents deployment and resource management provided in grid community. Also it presents information and association relation among application contents with association dictionary among application contents based on workflow process unit, and utilizes this as information for application contents deployment.

Two-Level Hierarchical Production Planning for a Semiconductor Probing Facility (반도체 프로브 공정에서의 2단계 계층적 생산 계획 방법 연구)

  • Bang, June-Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.159-167
    • /
    • 2015
  • We consider a wafer lot transfer/release planning problem from semiconductor wafer fabrication facilities to probing facilities with the objective of minimizing the deviation of workload and total tardiness of customers' orders. Due to the complexity of the considered problem, we propose a two-level hierarchical production planning method for the lot transfer problem between two parallel facilities to obtain an executable production plan and schedule. In the higher level, the solution for the reduced mathematical model with Lagrangian relaxation method can be regarded as a coarse good lot transfer/release plan with daily time bucket, and discrete-event simulation is performed to obtain detailed lot processing schedules at the machines with a priority-rule-based scheduling method and the lot transfer/release plan is evaluated in the lower level. To evaluate the performance of the suggested planning method, we provide computational tests on the problems obtained from a set of real data and additional test scenarios in which the several levels of variations are added in the customers' demands. Results of computational tests showed that the proposed lot transfer/planning architecture generates executable plans within acceptable computational time in the real factories and the total tardiness of orders can be reduced more effectively by using more sophisticated lot transfer methods, such as considering the due date and ready times of lots associated the same order with the mathematical formulation. The proposed method may be implemented for the problem of job assignment in back-end process such as the assignment of chips to be tested from assembly facilities to final test facilities. Also, the proposed method can be improved by considering the sequence dependent setup in the probing facilities.

A Survey on Nurses' Utilization of Computerization in Nursing Practice (간호사의 간호업무 전산화 활용에 대한 조사연구)

  • Rhee, In-Soon
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.5 no.2
    • /
    • pp.209-224
    • /
    • 1999
  • I have practiced this reserch for the purpose of proposition of basic data for amendment and addition of computer system after I surveyed the degree of abilities and satisfaction on the computerization in nursing\ practice. Subjects were collected from September 1 to September 30, 1998. Study subjects are 151 clinical nurses who are working at university hospital in Chonbuk area. Study instrument consists of 116 questionnaire which was developed by Kim H. K(1998). The data were analized number, mean ,t-test, ANOVA by using SPSS. The study results are as follows: 1. Most of the nurses who answered the questions were educated computerizing(96%). The abilities of computer program utilities were the most in inputting data(74%). The program nurses wanted computerizing education was wordprocess, dealing internet and statistics. 2. As for applying parts of computer system in nursing, the most nurses were Dr's order check (96%), treatment activity(91.4%), medication(89.4%), lab. test(87 .4%), transfering department(85.4%), transfering room(79.5%), diet(71.8%), discharge (70.2%), Barcord Sticker(70.2%) , reservation(62.2%) in order that were all conected order system mutually to other part. It showed that computer system was not applied for treating the original nursing work such as nursing record (13%), duty scheduling(6.0%) , nursing process(4.6%) , Q.I(1.3%), nursing research(1.3%), education(1.3%), 3. As for the benefit when computer system is applied for, the most respondence was promptness of work and convenience(90.6%) , exactness of work (82.8%), offering information exactily and efficiently(36.3%), offering good quality of nursing (6.0%) in order. 4. The degree of contentment on computerizing in nursing practice showed average 3.24%. The best marking item is that they are eager to participate in the computer education. Next, the automatic output of label and giving the number automatically is to prevent loss and mentioned items of patient registration from being changed(3.95) and to prevent mistakes possibly happening because of doctor's difficult order(3.85). 5. The problems which may happen to in nurses' utilization of computerization for the nursing practice showed average 3.18. The most problem is that the practice may stop because of the problem of computer itself(3.67), and the next, the indication of act can be imperfect(3.66) , manual training may overlap because of incomplete computerization (3.60), practical education for the computerizing is lack(3.41), and the computer literate nurses are lack(3.40) . 6. Study subject's contentment by age was significant difference(F=3.10,P=0.0119). Study subject's contentment by job posision was significant difference(F=6.001P=0.0034) I will propose the following according to the above results. The domain of original nursing practice is urgernt. Manual and indication of act should be made before long in computer obstacle. Nursing department should support the nurses so that they could receive the education needed for the nurses themselves.

  • PDF

Identifying Factors Affecting Labor Productivity for Residential Fire Protection System Installation (공동주택 소방설비공사의 노무생산성 영향요인 분석)

  • Oh, Jae-Hoon;Kim, Dae Young;Kim, Jae Sik;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.377-384
    • /
    • 2017
  • It is generally acknowledged that subcontractors mostly allocate their resources to project relying on their previous experiences, instead of data-based judgement. Installing residential fire protection systems, typically performed by subcontractors, is labor-intensive job and its schedule is frequently changed as the contractor master schedule is often revised. Nevertheless, it is still important for subcontractors to make much effort to improve labor productivity through a thorough planning for scheduling and resource allocation. The purpose of this study is to identify significant factors that affect labor productivity for residential fire protection system installation. For this purpose, 50 potential factors that may affect productivity were identified based on literature reviews and expert interviews. These factors were further explored using correlation analysis and ANOVA test. The results showed that the labor productivity is significant impacted by various project characteristics.

Development of Intelligent ATP System Using Genetic Algorithm (유전 알고리듬을 적용한 지능형 ATP 시스템 개발)

  • Kim, Tai-Young
    • Journal of Intelligence and Information Systems
    • /
    • v.16 no.4
    • /
    • pp.131-145
    • /
    • 2010
  • The framework for making a coordinated decision for large-scale facilities has become an important issue in supply chain(SC) management research. The competitive business environment requires companies to continuously search for the ways to achieve high efficiency and lower operational costs. In the areas of production/distribution planning, many researchers and practitioners have developedand evaluated the deterministic models to coordinate important and interrelated logistic decisions such as capacity management, inventory allocation, and vehicle routing. They initially have investigated the various process of SC separately and later become more interested in such problems encompassing the whole SC system. The accurate quotation of ATP(Available-To-Promise) plays a very important role in enhancing customer satisfaction and fill rate maximization. The complexity for intelligent manufacturing system, which includes all the linkages among procurement, production, and distribution, makes the accurate quotation of ATP be a quite difficult job. In addition to, many researchers assumed ATP model with integer time. However, in industry practices, integer times are very rare and the model developed using integer times is therefore approximating the real system. Various alternative models for an ATP system with time lags have been developed and evaluated. In most cases, these models have assumed that the time lags are integer multiples of a unit time grid. However, integer time lags are very rare in practices, and therefore models developed using integer time lags only approximate real systems. The differences occurring by this approximation frequently result in significant accuracy degradations. To introduce the ATP model with time lags, we first introduce the dynamic production function. Hackman and Leachman's dynamic production function in initiated research directly related to the topic of this paper. They propose a modeling framework for a system with non-integer time lags and show how to apply the framework to a variety of systems including continues time series, manufacturing resource planning and critical path method. Their formulation requires no additional variables or constraints and is capable of representing real world systems more accurately. Previously, to cope with non-integer time lags, they usually model a concerned system either by rounding lags to the nearest integers or by subdividing the time grid to make the lags become integer multiples of the grid. But each approach has a critical weakness: the first approach underestimates, potentially leading to infeasibilities or overestimates lead times, potentially resulting in excessive work-inprocesses. The second approach drastically inflates the problem size. We consider an optimized ATP system with non-integer time lag in supply chain management. We focus on a worldwide headquarter, distribution centers, and manufacturing facilities are globally networked. We develop a mixed integer programming(MIP) model for ATP process, which has the definition of required data flow. The illustrative ATP module shows the proposed system is largely affected inSCM. The system we are concerned is composed of a multiple production facility with multiple products, multiple distribution centers and multiple customers. For the system, we consider an ATP scheduling and capacity allocationproblem. In this study, we proposed the model for the ATP system in SCM using the dynamic production function considering the non-integer time lags. The model is developed under the framework suitable for the non-integer lags and, therefore, is more accurate than the models we usually encounter. We developed intelligent ATP System for this model using genetic algorithm. We focus on a capacitated production planning and capacity allocation problem, develop a mixed integer programming model, and propose an efficient heuristic procedure using an evolutionary system to solve it efficiently. This method makes it possible for the population to reach the approximate solution easily. Moreover, we designed and utilized a representation scheme that allows the proposed models to represent real variables. The proposed regeneration procedures, which evaluate each infeasible chromosome, makes the solutions converge to the optimum quickly.