• 제목/요약/키워드: Job scheduling

검색결과 431건 처리시간 0.024초

공정 그룹별 Start lag을 고려한 스케쥴링 (Scheduling with regard to start lag in process group)

  • 전태준;박성호
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1996년도 추계학술대회발표논문집; 고려대학교, 서울; 26 Oct. 1996
    • /
    • pp.299-302
    • /
    • 1996
  • The purpose of this study is developing scheduling logic and program for machining scheduling of automobile part production line with unbalanced processing time. Three rules are developed to minimize slack and effect on other job. Fourth rule is suggested which considered weighted sum of three factors. schedule is generated totally 1, 000 times and then optimal weight parameter is selected. The program is developed to schedule situation to compare with the performance measure, total finish time of machine and total tardiness of part. As a result, the rule which considered weighted sum of three factors is effective for both measure.

  • PDF

인공 뉴럴 네트워크에 의한 FMS 일정관리 (FMS scheduling through artificial neural network)

  • 양정문;문기주;김정자
    • 산업경영시스템학회지
    • /
    • 제18권34호
    • /
    • pp.99-106
    • /
    • 1995
  • Recently, neural network is recognized as a new approach to solve jobshop scheduling problems in manufacturing system. Scheduling problem is known to be a difficult combinational explosive problem with domain-dependence variations in general. In addition, the needs to achieve a good performance in flexible manufacturing system increase the dimensions of decision complexity. Therefore, mathematical approach to solve realistic problems could be failed to find optimal or optimal-trending. In this paper a technique with neural network for jobs grouping by job-attributes and Gaussian machine network for generating to near-optimal sequence is presented.

  • PDF

병렬기계에서의 스케쥴링에 관한 연구 (Uniform Parallel Machine Scheduling)

  • 김대철
    • 산업경영시스템학회지
    • /
    • 제29권2호
    • /
    • pp.7-12
    • /
    • 2006
  • This study considers the problem of scheduling jobs on uniform parallel machines with a common due date. The objective is to minimize the total absolute deviation of job completion times about the common due date. This problem is motivated by the fact that a certain phase of printed circuit board manufacturing is bottleneck and the processing speeds of parallel machines in this phase are uniformly different for all jobs. Optimal properties are proved and a simple polynomial time optimal algorithm is developed.

주어진 구간내의 기계에서만 생산 가능한 병렬기계문제에 대한 2-근사 알고리듬 (2-Approximation Algorithm for Parallel Machine Scheduling with Consecutive Eligibility)

  • 황학진;김규태
    • 대한산업공학회지
    • /
    • 제29권3호
    • /
    • pp.190-196
    • /
    • 2003
  • We consider the problem of scheduling n jobs on m machines with the objective of minimizing makespan. Each job cannot be eligible to all the machines but to its consecutively eligible set of machines. For this problem, a 2-approximation algorithm, MFFH, is developed. In addition, an example is presented to show the tightness of the algorithm.

"V-shape"를 이용한 흐름작업 일정계획 (Flow Shop Scheduling Problems By using Y-Shape Property)

  • 노인규;이정환
    • 산업경영시스템학회지
    • /
    • 제14권23호
    • /
    • pp.65-70
    • /
    • 1991
  • This paper is concerned with a flow-shop scheduling problem for all jobs having the common due date using V-Shape penalty cost function for earliness and lateness. The objective of the paper is to develop an efficient heuristic scheduling algorithm for minimizing total penalty cost function and for determining the optimal common due date. In addition, the between-job-delay for two machines are considered for developing the algorithm. A numerical example is given for illustrating the proposed algorithm.

  • PDF

적시생산시스템에서 납기와 생산효율성을 고려한 Scheduling (A Study on Scheduling Considering Delivery and Production Efficiency in the JIT Systems)

  • 김정
    • 산업융합연구
    • /
    • 제5권2호
    • /
    • pp.21-32
    • /
    • 2007
  • This paper deals with the sequencing problem in the operation of the manufacturing systems with the constraint of buffer capacity. Some of studies for this theme have been progressed for several years. And then most of them considered only one objective, such as maximum lateness, machine utilization, makespan, mean flowtime and so on. This study deal with two objectives of the delivery for customers and the idle time of machines for producers. For the decision of sequence, the utility function is used. The developed heuristic algorithm presents a good solution. Through a numerical example, the procedures of the job sequencing is explained.

  • PDF

사물인터넷 환경에서 센서데이터의 처리를 위한 적응형 우선순위 큐 기반의 작업 스케줄링 (Adaptive Priority Queue-driven Task Scheduling for Sensor Data Processing in IoT Environments)

  • 이미진;이종식;한영신
    • 한국멀티미디어학회논문지
    • /
    • 제20권9호
    • /
    • pp.1559-1566
    • /
    • 2017
  • Recently in the IoT(Internet of Things) environment, a data collection in real-time through device's sensor has increased with an emergence of various devices. Collected data from IoT environment shows a large scale, non-uniform generation cycle and atypical. For this reason, the distributed processing technique is required to analyze the IoT sensor data. However if you do not consider the optimal scheduling for data and the processor of IoT in a distributed processing environment complexity increase the amount in assigning a task, the user is difficult to guarantee the QoS(Quality of Service) for the sensor data. In this paper, we propose APQTA(Adaptive Priority Queue-driven Task Allocation method for sensor data processing) to efficiently process the sensor data generated by the IoT environment. APQTA is to separate the data into job and by applying the priority allocation scheduling based on the deadline to ensure that guarantee the QoS at the same time increasing the efficiency of the data processing.

Performance Evaluation of Gang Scheduling Policies with Migration in a Grid System

  • Ro, Cheul-Woo;Cao, Yang
    • International Journal of Contents
    • /
    • 제6권4호
    • /
    • pp.30-34
    • /
    • 2010
  • Effective job scheduling scheme is a crucial part of complex heterogeneous distributed systems. Gang scheduling is a scheduling algorithm for grid systems that schedules related grid jobs to run simultaneously on servers in different local sites. In this paper, we address grid jobs (gangs) schedule modeling using Stochastic reward nets (SRNs), which is concerned for static and dynamic scheduling policies. SRN is an extension of Stochastic Petri Net (SPN) and provides compact modeling facilities for system analysis. Threshold queue is adopted to smooth the variations of performance measures. System throughput and response time are compared and analyzed by giving reward measures in SRNs.

주기정비를 고려한 단일기계 일정계획을 위한 휴리스틱 알고리즘 설계 (Heuristic Algorithm for the Single-machine Scheduling with Periodic Maintenance)

  • 이상헌;이인구
    • 대한산업공학회지
    • /
    • 제34권3호
    • /
    • pp.318-327
    • /
    • 2008
  • This paper considers a single-machine scheduling problem with availability constraints. In many realistic situations, machines may not be always available due to various reasons such as maintenance, breakdown and repair. However, most literature on scheduling assume that the machines are available at all times. This paper deals with a single-machine scheduling problem with periodic maintenance. If the maintenance decision is made jointly with the job scheduling, the system will be more effective. The objective is to minimize the total completion time of jobs. This problem is proved to be NP-hard in the strong sense. The proposed breaking heuristic(BH) algorithm rule is established by some theorems and conditions. Our computational results show that the BH algorithm is much more efficient than existing heuristic.

그리드 시스템을 위한 포인트 기반 스케줄링 알고리즘 (A Point-based Scheduling Algorithm for GRID Environment)

  • 오영은;김진석
    • 한국정보과학회논문지:시스템및이론
    • /
    • 제32권11_12호
    • /
    • pp.639-645
    • /
    • 2005
  • 과학 기술이 발전함에 따라 대량의 정보를 분석하고 처리하기 위해 대두된 그리드 시스템은 이질적인 시스템 위에 구축된 환경이므로 사용자 작업을 효율적으로 할당하기 위한 스케줄링 알고리즘이 필요하다. 현재까지 여러 스케줄링 알고리즘이 연구되어 왔지만, 대부분 자원 사이의 네트웍 대역폭을 고려하지 않는 문제점을 가지고 있다. 본 논문에서는 이러한 문제점을 해결하기 위하여 글로벌 그리드 시스템에서의 스케줄링 알고리즘을 제안하였다. 또한 글로벌 그리드 시스템에서 사용되는 여러 알고리즘의 점수를 각각 계산하여 가장 점수가 낯은 알고리즘을 선택하는 포인트 기반 스케줄링 알고리즘을 제안하였으며, 시뮬레이션을 통하여 다른 스케줄링 알고리즘보다 성능이 뛰어남을 보였다.