• Title/Summary/Keyword: Job Execution Time

Search Result 65, Processing Time 0.024 seconds

Workflow Scheduling Using Heuristic Scheduling in Hadoop

  • Thingom, Chintureena;Kumar R, Ganesh;Yeon, Guydeuk
    • Journal of information and communication convergence engineering
    • /
    • v.16 no.4
    • /
    • pp.264-270
    • /
    • 2018
  • In our research study, we aim at optimizing multiple load in cloud, effective resource allocation and lesser response time for the job assigned. Using Hadoop on datacenter is the best and most efficient analytical service for any corporates. To provide effective and reliable performance analytical computing interface to the client, various cloud service providers host Hadoop clusters. The previous works done by many scholars were aimed at execution of workflows on Hadoop platform which also minimizes the cost of virtual machines and other computing resources. Earlier stochastic hill climbing technique was applied for single parameter and now we are working to optimize multiple parameters in the cloud data centers with proposed heuristic hill climbing. As many users try to priorities their job simultaneously in the cluster, resource optimized workflow scheduling technique should be very reliable to complete the task assigned before the deadlines and also to optimize the usage of the resources in cloud.

Application of Value Engineering to Early Design Phases in Construction Projects (건설사업 설계초기단계 VE 적용방안)

  • Lee Seung-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.156-166
    • /
    • 2005
  • The purpose of this study is to present proper VE application methods to euly design phases. Since VE methodology is more effective on early stage of design phase, the study focused on application of VE methodology in early stage of design process. With the examination of past studies, obstacles of VE application in domestic construction industry are defined. To solve these problems, this paper presents (1) subdivision of VE execution time, (2) an appropriate VE targeting method for construction industry, (3) a resonable and practical function analysis process, and (4) modified design-VE job plan.

Provisioning Scheme of Large Volume File for Efficient Job Execution in Grid Environment (그리드 환경에서 효율적인 작업 처리를 위한 대용량 파일 프로비저닝 방안)

  • Kim, Eun-Sung;Yeom, Beon-Y.
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.15 no.8
    • /
    • pp.525-533
    • /
    • 2009
  • Staging technique is used to provide files for a job in the Grid. If a staged file has large volume, the start time of the job is delayed and the throughput of job in the Grid may decrease. Therefore, removal of staging overhead helps the Grid operate more efficiently. In this paper, we present two methods for efficient file provisioning to clear the overhead. First, we propose RA-RFT, which extends RFT of Globus Toolkit and enables it to utilize RLS with replica information. RA-RFT can reduce file transfer time by doing partial transfer for each replica in parallel. Second, we suggest Remote Link that uses remote I/O instead of file transfer. Remote link is able to save storage of computational nodes and enables fast file provisioning via prefetching. Through various experiments, we argue that our two methods have an advantage over existing staging techniques.

Development of the Order Picking Algorithm for Warehouse Management System in SCM Environment

  • 조종남;남호기;박상민;오성환
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.129-142
    • /
    • 2003
  • The SCM is that Supply Chain Network is Promptly and Voluntarily Optimized in Unstable Market Change Environment. The Cash flow Efficiency of Hole Supply Chain Network is Improved by Changing the Information and Changing the Foundation of Business Processes. The Role of WMS has been Changing Importantly with the Introduction of SCM. WMS Needed to Change to the Information Center in Order to Change Information in Real Time and the WMS of Information Storing in Order to Support an Idea Decision. This Development was Defined about the Importance of WMS in SCM Environment. The Criterion of Valuation is Normally Measured Time between Taking a Order Receive and Bringing the Items to Customer. The Decreasing Move Time of Order Picker in Warehouse is Directly Influence to the Job Execution. So, this Research is Defined about the Optimized Route of Order Picker and Suggests Algorithm. To do this, Past Algorithm is Studied. It's Easy to Introduce and this Study is Looking for Method about the Noticing of Order Picker. The Algorithm will Improve to be Adapt to Standard Process System.

  • PDF

Physical Factors Affecting Success Rate During Endotracheal Intubation

  • Han, Song-Yi;Yun, Seong-Woo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.10
    • /
    • pp.167-174
    • /
    • 2019
  • In this paper, We propose the purpose the examine the physical factors that influence the success rate during the endotracheal intubation and to provide the basic data for effective intubation success. The subject of this study was 42 students in emergency rescue department who had completed the BLS Health Care-provider and a specialized airway maintenance course dealing with endotracheal intubation and it is a similar experimental study after the non-equivalence single group. For data analysis, SPSS 23.0 Version was used. The study methods were measuring the grip fotce of subjects, the angle of arm during intubation tube, distance from manikin, palm length, etc. The results showed that there was a correlation between the time of successful endotracheal intubation and the physical characteristics. In particular, when performing endotracheal intubation, it was related to the angle of the arm and the execution time of the performer, and the narrower the angle of the arm, the shorter the execution time. The results of this study suggest that successful endotracheal intubation could be implemented if the operator tried to reduce the angle of the arm when performing endotracheal intubation, and through further research on various job groups, identify the possibility of clinical use will be necessary.

A Study on Scalability of Profiling Method Based on Hardware Performance Counter for Optimal Execution of Supercomputer (슈퍼컴퓨터 최적 실행 지원을 위한 하드웨어 성능 카운터 기반 프로파일링 기법의 확장성 연구)

  • Choi, Jieun;Park, Guenchul;Rho, Seungwoo;Park, Chan-Yeol
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.9 no.10
    • /
    • pp.221-230
    • /
    • 2020
  • Supercomputer that shares limited resources to multiple users needs a way to optimize the execution of application. For this, it is useful for system administrators to get prior information and hint about the applications to be executed. In most high-performance computing system operations, system administrators strive to increase system productivity by receiving information about execution duration and resource requirements from users when executing tasks. They are also using profiling techniques that generates the necessary information using statistics such as system usage to increase system utilization. In a previous study, we have proposed a scheduling optimization technique by developing a hardware performance counter-based profiling technique that enables characterization of applications without further understanding of the source code. In this paper, we constructed a profiling testbed cluster to support optimal execution of the supercomputer and experimented with the scalability of the profiling method to analyze application characteristics in the built cluster environment. Also, we experimented that the profiling method can be utilized in actual scheduling optimization with scalability even if the application class is reduced or the number of nodes for profiling is minimized. Even though the number of nodes used for profiling was reduced to 1/4, the execution time of the application increased by 1.08% compared to profiling using all nodes, and the scheduling optimization performance improved by up to 37% compared to sequential execution. In addition, profiling by reducing the size of the problem resulted in a quarter of the cost of collecting profiling data and a performance improvement of up to 35%.

A development methodology for heterarchical control of flexible manufacturing systems

  • 한영근
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.04a
    • /
    • pp.776-782
    • /
    • 1995
  • This paper presents a methodology for development of a heterarchical control system in Flexible Manufacturing Systems (FMS) environment. A Petri net based model is applied for development of control software. A real-time scheduling methodology for the heterarchical system is also developed and it is used as a software entity in the overall architecture. The partition of generic and specific modules in control software development is emphasized. The control system performs its control tasks in two stages: (1) generation of generic control code and distribution of them to each controller entity prior to system execution; (2) generation of specific control code according to job arrival and its process plan. The control software and the scheduling algorithm are evaluated by a simulation program.

  • PDF

Interactive Motivational Concept: A Study of Motivation among Corporate of Bhopal Region in India

  • Venkatesh, Bharti;Sharma, Amit Kumar
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.2 no.2
    • /
    • pp.35-38
    • /
    • 2015
  • Managers, supervisors, executives and others whose office is to get work done by staff in organizations would desire a motivated workforce. Despite the advances in technology, any system has tot have motivated people to achieve its goals and at some time or other, no one in charge of a unit has failed to wonder, 'How best do I get individuals and groups motivated'? What is motivation, how can employees be motivated to direct their energies towards execution of the job and how is this achieved on a sustained on-going basis? Is a highly motivated employee necessarily an ace performer? These are the issues which the author would address in the present paper. The authors has conducted an empirical study by administering motivational test and collected data from 100 corporate of Bhopal region.

A Design of Integrated Scientific Workflow Execution Environment for A Computational Scientific Application (계산 과학 응용을 위한 과학 워크플로우 통합 수행 환경 설계)

  • Kim, Seo-Young;Yoon, Kyoung-A;Kim, Yoon-Hee
    • Journal of Internet Computing and Services
    • /
    • v.13 no.1
    • /
    • pp.37-44
    • /
    • 2012
  • Numerous scientists who are engaged in compute-intensive researches require more computing facilities than before, while the computing resource and techniques are increasingly becoming more advanced. For this reason, many works for e-Science environment have been actively invested and established around the world, but still the scientists look for an intuitive experimental environment, which is guaranteed the improved environmental facilities without additional configurations or installations. In this paper, we present an integrated scientific workflow execution environment for Scientific applications supporting workflow design with high performance computing infrastructure and accessibility for web browser. This portal supports automated consecutive execution of computation jobs in order of the form defined by workflow design tool and execution service concerning characteristics of each job to batch over distributed grid resources. Workflow editor of the portal presents a high-level frontend and easy-to-use interface with monitoring service, which shows the status of workflow execution in real time so that user can check the intermediate data during experiments. Therefore, the scientists can take advantages of the environment to improve the productivity of study based on HTC.

Determining the Time of Least Water Use for the Major Water Usage Types in District Metered Areas (상수관망 블록의 대표적인 용수사용 유형에 대한 최소 용수사용 시간의 결정)

  • Park, Suwan;Jung, So-Yeon;Sahleh, Vahideh
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.3
    • /
    • pp.415-425
    • /
    • 2015
  • Aging water pipe networks hinder efficient management of important water service indices such as revenue water and leakage ratio due to pipe breakage and malfunctioning of pipe appurtenance. In order to control leakage in water pipe networks, various methods such as the minimum night flow analysis and sound waves method have been used. However, the accuracy and efficiency of detecting water leak by these methods need to be improved due to the increase of water consumption at night. In this study the Principal Component Analysis (PCA) technique was applied to the night water flow data of 426 days collected from a water distribution system in the interval of one hour. Based on the PCA technique, computational algorithms were developed to narrow the time windows for efficient execution of leak detection job. The algorithms were programmed on computer using the MATLAB. The presented techniques are expected to contribute to the efficient management of water pipe networks by providing more effective time windows for the detection of the anomaly of pipe network such as leak or abnormal demand.