Analyzing effects of the BESS for wind farm in Jeju Island (제주지역 풍력발전단지의 BESS 적용효과 분석)

  • Lee, Doheon;Kim, Eel-Hwan;Kim, Ho-Min;Kim, Seung Hyun
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.4
    • /
    • pp.67-74
    • /
    • 2014
  • The fluctuation of the output power of wind farms will be able to cause the impact on the Jeju power system such as power quality and stability. To settle the matter, many researchers have proposed the use of the BESS(Battery Energy Storage System) in the wind farm. In this paper, The BESS is applied to each wind farms for mitigating the fluctuation of wind power output. The BESS is controlled for smoothing the output of wind farms. Two kinds of simulation will be carried out. First, the simulation results by using PSCAD/EMTDC simulation program are compared to the measured data from the real power grid in Jeju Island. The other is to analyze the output of wind farms when the BESS is applied to the simulation works. The simulation results will demonstrate the effectiveness of using BESS to stabilize for power grid in Jeju Island.

The Introduction of #2 HVDC SYSTEM (육지-제주간 2차 HVDC SYSTEM 개요)

  • Jang, Suk-Han;Yoo, Sung-Hwan;Shin, Myoung-Sik;Lee, Gyu-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.107-109
    • /
    • 2008
  • Cheju-Haenam HVDC transmission system start it's commercial operation since 1998. JEJU island is supplied with it's about 45% of total electric power from main land with HVDC link. In JEJU island, the demand of electric power is growing every year. With a current power supply, electric power reserve rate will be below the recommended one. For a stable power supply to JEJU island, KEPCO start a construction of #2 HVDC transmission system. This report is for introduction and understanding of #2 HVDC system which will be installed between JEJU island and main land. This report includes a specification of converter station and DC cable. KEPCO expect that this system will solve the power supply problem and maximum wind power plant capacity problem as well.

  • PDF

Analysis of losses within SMES system for compensating output fluctuation of wind power farm

  • Park, S.I.;Kim, J.H.;Le, T.D.;Lee, D.H.;Kim, D.J.;Yoon, Y.S.;Yoon, K.Y.;Kim, H.M.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.16 no.4
    • /
    • pp.57-61
    • /
    • 2014
  • Output fluctuation which is generated in wind power farm can hinder stability of total power system. The electric energy storage (EES) reduces unstable output, and superconducting magnetic energy storage (SMES) of various EESs has the proper performance for output compensation of wind power farm since it charges and discharges large scale power quickly with high efficiency. However, because of the change of current within SMES, the electromagnetic losses occur in the process of output compensation. In this paper, the thermal effect of the losses that occur in SMES system while compensating in wind power farm is analyzed. The output analysis of wind power farm is processed by numerical analysis, and the losses of SMES system is analyzed by 3D finite element analysis (FEA) simulation tool.

The Effect of HVDC#3 on Jeju Power System (제주 HVDC#3 영향 분석)

  • Park, Jung-Soo;Jung, Hong-Ju;Han, Young-Seong;Kim, Rae-Young;Chung, Chung-Choo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.12
    • /
    • pp.2196-2201
    • /
    • 2011
  • According to the 5th national plan for electric power demand and supply, the 3rd HVDC link will be installed between KEPCO and Jeju Island system and go into operation in June, 2016. However, if it adopt LCC HVDC, Jeju power system could be in voltage instable condition. In order to solve the problem, we propose the application of VSC HVDC to the 3rd HVDC project. In the past, VSC HVDC has many disadvantages such as, inefficiency in conversion, size limit, and expensiveness, compared to LCC HVDC. Recently, the new technologies and the demand for renewable energy interconnection are leading a large growth in VSC HVDC market. In this paper, we will introduce the technical and market trends of VSC HVDC and power system stability analysis results for Jeju power system having LCC and VSC HVDCs.

Frequency and Voltage Control Strategies of the Jeju Island Power System Based on MMC-HVDC Systems

  • Quach, Ngoc-Thinh;Chae, Sang Heon;Song, Seung-Ho;Kim, Eel-Hwan
    • Journal of Power Electronics
    • /
    • v.18 no.1
    • /
    • pp.204-211
    • /
    • 2018
  • At present, one of two LCC-HVDC systems is responsible for controlling the grid frequency of the Jeju Island Power System (JIPS). The grid voltage is regulated by using STATCOMs. However, these two objectives can be achieved in one device that is called by a modular multilevel converter-high voltage direct current (MMC-HVDC) system. Therefore, this paper proposes frequency and voltage control strategies for the JIPS based on a MMC-HVDC system. In this case, the ancillary frequency and voltage controllers are implemented into the MMC-HVDC system. The modelling of the JIPS is done based on the parameters and measured data from the real JIPS. The simulation results obtained from the PSCAD/EMTDC simulation program are confirmed by comparing them to measured data from the real JIPS. Then, the effect of the MMC-HVDC system on the JIPS will be tested in many cases of operation when the JIPS operates with and without STATCOMs. The objective is to demonstrate the effectiveness of the proposed control strategy.

Analysis of effect on power system considering the maximum penetration limit of wind power (풍력발전 한계운전용량에 대한 계통영향 분석)

  • Myung, Ho-San;Kim, Bong-Eon;Kim, Hyeong-Taek;Kim, Se-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.3
    • /
    • pp.19-25
    • /
    • 2012
  • About supply and demand to see that you need to match, the limitations of wind power capacity is low demand and the commitment of the general generator will exist between the minimum generation. if the turbine's output can be controlled, The limitation of wind power capacity will be adopted based on instant power generation. Namely, The minimum limits of wind power generation based load operation by calculating the amount that is higher than if the output should be restricted to highest operation. in this paper, we committed to the demand for low enough that the combination of the general generator of wind power capacity to accommodate the operation of determining whether the limit is intended to. For this, power system analysis program PSS/E was used, Jeju system by implementing the model simulations were performed.

On UFR Settings Considering Wind Power Fluctuation In Jeju Island (제주도 풍력발전기 출력변동성을 고려한 적정 UFR 차단방식 연구)

  • Park, Min-Su;Chun, Yeong-Han;Byun, Sung-Hyun;Yang, Jeong-Jae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.4
    • /
    • pp.445-450
    • /
    • 2014
  • Jeju power system is connected to the mainland power system through HVDC, and receives about half of required electricity through the HVDC lines. Jeju power system already experienced black out when a generator tripped at the moment of the HVDC line faults. But, UFR operated as was expected when HVDC line fault occurred at that time. As the penetration level of wind turbines increases, it is required to set UFR again considering intermittent wind turbin outputs. In this paper, we address a new way of UFR setting through computer simulation.

Characteristic analysis of LCC and VSC HVDC system in Jeju power system using RTDS (RTDS를 이용한 제주도 전력계통에서의 전압형과 전류형 직류송전 시스템 특성분석)

  • Ju, Chang-Hyeon;Kim, Jin-Geun;Dinh, Minh-Chau;Park, Min-Won;Yu, In-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.828-829
    • /
    • 2011
  • This paper performs a comparison analysis of two types of HVDC system in Jeju power system. A traditional HVDC transmission system had been composed of line commutated converter based on thyristors and the development of semiconductors enables to apply voltage source converter using IGBTs. The detailed parameters of Jeju power system were considered to make a similar condition with real system in real time digital simulator. Two types of HVDC transmission system were modeled and simulated to compare their characteristics in Jeju power system. The simulation results demonstrate that the VSC-HVDC system has more stable performance due to the fast response speed than LCC-HVDC when the transmission capacity was fluctuated.

  • PDF

Time domain Simulation of a Secondary Voltage Regulation Model to the Jeju Power System (제주 전력계통 2차 전압제어 모델 구축 및 시모의)

  • Yang, Byeong-Mo;Song, In-Jun;Kim, Yong-Hak;Kwark, No-Hong;Kang, Ji-Won;Jang, Tae-In;Song, Hwa-Chang
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.469-470
    • /
    • 2007
  • There are many power system simulation software tools for time-domain performance in power system. This paper reports the results of time-domain simulation for the Jeju Power system with a secondary voltage regulation (SVR) model, developed with both TSAT and PSCAD/EMTDC and evaluates them, which are commercial software tools used for digital simulation of power system. TSAT has not been yet verified because of deficient modelling of components in the time domain performance of KEPCO power system. But PSCAD/EMTDC has been enough verified in our system. So, we need to compare and evaluate TSAT with PSCAD/EMTDC in small power system like Jeju. This paper showed that the results simulated by both TSAT and PSCAD/EMTDC is very similar to each other, so TSAT is able to apply for our KEPCO large power system.

  • PDF

A Comparative Study on Lightning Characteristics and Lightning Damage to Wind Turbines of Jeju and Gangwon Region (제주와 강원 지역의 낙뢰특성 및 풍력발전기의 낙뢰피해 비교 연구)

  • Yang, Dal-Seung;Kim, Kyoung-Bo;Ko, Kyung-Nam
    • Journal of Power System Engineering
    • /
    • v.18 no.5
    • /
    • pp.137-143
    • /
    • 2014
  • An investigation on lightning characteristics and damage to wind turbines was performed on Jeju and Gangwon regions. The lightning data from January 2010 to September 2013 detected by IMPACT ESP were collected and analyzed in detail. Hangyeong and Seongsan wind farms of Jeju province and Taebaek, Changjuk, Taegisan and Gangwon wind farms of Gangwon province were selected for this study. Lightning rates and lightning damage events at the six wind farms were compared with each other. Lightning maps for the two regions were drawn using lightning frequency data. As a result, lightning frequency of Gangwon region was higher than that of Jeju region, while lightning strength of Gangwon was weaker than that of Jeju. Lightning rates were assessed to be good for all of the six wind farms. No lightning damage to wind turbines occurred at the two wind farms of Jeju, while some lightning damage to wind turbines took place at the four wind farms of Gangwon.