• Title/Summary/Keyword: Jecheon Fire

Search Result 23, Processing Time 0.032 seconds

A Study on the Fire Simulation for Vertical Fire Diffusion Analysis of Jecheon Sports Center (제천스포츠센터의 수직 화재확산 해석을 위한 화재시뮬레이션 분석에 관한 연구)

  • Choi, Yun-Ju;Kim, Yun-Seong;Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.79-80
    • /
    • 2022
  • In December 2017, a fire at the Jecheon Sports Center caused 29 deaths and 40 injuries, and about 2 billion won in property damage. It is a facility used by unspecified people as a publicly used establishment with a piloti structure. The damage was expanded due to the ignition of combustible exterior materials, Lack of fire protection in horizontal and vertical penetrations. Although legislation has improved since the fire, it is not retroactively applied, increasing the risk of fire in existing buildings. Accordingly, it is necessary to examine the case of the Jecheon Sports Center fire and draw out the problems. In this study, the fire simulation results and the Jecheon Sports Center fire are comparatively analyzed and used as basic data for fire reduction measures in publicly used establishment. As a result of the fire simulation drive, in the case of the second floor, the room temperature exceeded the human life safety standard of 60 ℃ after about 700 seconds had passed. In the case of three floor, it is predicted that the indoor temperature will exceed about 350 ℃. and temporary complexation will occur in the indoor combustibles.

  • PDF

Experience of a Disaster Medical Assistant Team activation in the fire disaster at Jecheon sports complex building: limitation and importance of rescue (제천 스포츠복합건물 화재 재난에서의 권역재난의료지원팀 활동 경험 고찰: 한계점과 구조의 중요성)

  • Jung, Seung Gyo;Kim, Yoon Seop;Kim, Oh Hyun;Lee, Kang Hyun;Kim, Kwan-Lae;Jung, Woo Jin
    • Journal of The Korean Society of Emergency Medicine
    • /
    • v.29 no.6
    • /
    • pp.585-594
    • /
    • 2018
  • Objective: This study was designed to report on the progress of the fire at Jecheon sports complex and to assess the adequacy of Disaster Medical Assistant Team (DMAT)'s activities in response to the fire disaster. Methods: We conducted a retrospective review based on camera recordings and medical records that were recorded at the disaster site for assessment of activities. We cooperated with firefighters, police officers, local hospital medical staffs and public health personnel in Jecheon in order to classify patients in the disaster field and to understand the patients' progress. Results: At 15:53, the first request for emergency rescue came to the 119 general emergency call center, and a request for DMAT activation came at 16:28. DMAT arrived at the site at 17:04 and remained active until the following day at 00:43. The total number of casualties was 60, including 27 minimal (Green) patients, 29 expectant (Black) patients, three delayed (Yellow) patients, and one immediate (Red) patient. There were 32 patients who received on-site care by DMAT. Two patients were transferred from a local hospital to Wonju Severance Christian Hospital for hyperbaric oxygen therapy. Conclusion: Twenty-nine victims were found in the sports complex building, and there were 31 mildly to moderately injured patients in this fire disaster. The main cause of death was thought to be smoke suffocation. Although DMAT was activated relatively quickly, it was not able to provide effective activity due to the late rescue and difficulty with fire suppression.

Analysis of Causes of Casualties in Jecheon Sports Center Fire - Focus on Structural Factors of Building and Equipment - (제천 스포츠센터 화재의 다수 사상자 발생원인 분석 - 건물과 설비의 구조적인 요인을 중심으로 -)

  • Lee, Eui-Pyeong
    • Fire Science and Engineering
    • /
    • v.32 no.4
    • /
    • pp.86-94
    • /
    • 2018
  • A sports center fire in Jecheon caused 29 deaths and 40 injuries. This study focused only on the structural factors of the building and equipment to investigate the causes of casualties based on the fire investigation results at the sports center. The structural factors of the building and equipment were a piloti-type parking lot, lack of a fire compartment between the piloti-type parking lot and lobby, lack of an installed sprinkler system, lack of an installed fire door in the main stairs on the $1^{st}$ floor, lack of an installed fire water tank on the rooftop, an installed pocket fire door in the main entrance on the $2^{nd}$ floor, poor fire compartments in an EPS space and a pipe pit and on each floor, a leak in the joint of a drain pipe, plywood installed in the hoistway of the freight elevator and interior wall, illegal remodeling of a closed rooftop structure, which cannot discharge smoke and heat, installed styrofoam insulation in the inside of the parking lot ceiling, an installed tempered glass window, which cannot be opened in the ladies bathroom on the $2^{nd}$ floor, and a finished dryvit exterior wall.

Analysis of the Causes of Casualties of Jecheon Sports Center Fire - Focus on an Initial Response and Management - (제천 스포츠센터 화재의 다수 사상자 발생원인 분석 -초기대응과 관리적인 측면을 중심으로-)

  • Lee, Eui-Pyeong
    • Fire Science and Engineering
    • /
    • v.32 no.5
    • /
    • pp.57-66
    • /
    • 2018
  • A sports center fire in Jecheon that caused 29 deaths and 40 injuries was analyzed based on initial response and management in order to investigate the causes of the casualties. The aspects of initial response included delay of reporting 119, not being guided to the exit for the body scrubber on the $2^{nd}$ floor for escape, opening the fire doors of the exits on the $1^{st}$ floor and $3^{rd}$ floor, not closing the fire door of the main stairs on the $3^{rd}$ floor, and not doing an emergency broadcast. The management aspects included closing the alarm valve of the sprinkler system on the $1^{st}$ floor, starting-stop of the fire pump controller, neglecting leakage of water and electricity between the false ceiling and ceiling in the parking lot, hiding the exit light in the ladies bathroom lounge on the $2^{nd}$ floor and piling up things in the exit, neglecting the button of an automatic door on the $2^{nd}$ floor, conventional fire safety management, insufficient inspection of fire equipment, and not working fire shutters and smoke exhaust windows.

Application of the Maryblyt Model for the Infection of Fire Blight on Apple Trees at Chungju, Jecheon, and Eumsung during 2015-2020

  • Ahn, Mun-Il;Yun, Sung Chul
    • The Plant Pathology Journal
    • /
    • v.37 no.6
    • /
    • pp.543-554
    • /
    • 2021
  • To preventively control fire blight in apple trees and determine policies regarding field monitoring, the Maryblyt ver. 7.1 model (MARYBLYT) was evaluated in the cities of Chungju, Jecheon, and Eumseong in Korea from 2015 to 2020. The number of blossom infection alerts was the highest in 2020 and the lowest in 2017 and 2018. And the common feature of MARYBLYT blossom infection risks during the flowering period was that the time of BIR-High or BIR-Infection alerts was the same regardless of location. The flowering periods of the trees required to operate the model varied according to the year and geographic location. The model predicts the risk of "Infection" during the flowering periods, and recommends the appropriate times to control blossom infection. In 2020, when flower blight was severe, the difference between the expected date of blossom blight symptoms presented by MARYBLYT and the date of actual symptom detection was only 1-3 days, implying that MARYBLYT is highly accurate. As the model was originally developed based on data obtained from the eastern region of the United States, which has a climate similar to that of Korea, this model can be used in Korea. To improve field utilization, however, the entire flowering period of multiple apple varieties needs to be considered when the model is applied. MARYBLYT is believed to be a useful tool for determining when to control and monitor apple cultivation areas that suffer from serious fire blight problems.

Trial Construction for the Prevention of Fire Spread in Piloti Building (필로티건축물의 화재확산방지를 위한 시범시공)

  • Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.87-88
    • /
    • 2019
  • In case of Korea, The Large-scale fire is consistently being such as 2015 Uijeongbu Fire, 2017 Jecheon Fire, 2018 Sejong Hospital Fire. Such a fire has a problem that the fire is spreading upper due to external flame spread. As a countermeasure the fire safety, the study about axial temperature prediction of external flame spread is consistently doing. But in korea, Vertical spandrel is specified as 40cm, and improvement is urgently needed. In this study, a repair material was selected to prevent the fire from spreading to a building where a flammable exterior material was installed and then pilot construction was carried out. Also, fire safety measures for buildings constructed with flammable exterior materials were examined.

  • PDF

A Comparative Analysis on the building Fire Protection Standards of Korea and Japan (한·일 건축물 방화구획 기준 비교분석)

  • Shin, Yeoung-Deok;Han, Ji-Woo;Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.4-5
    • /
    • 2019
  • Smoke and fire spread throughout the building as a result of problems in the fire prevention section of Uijeongbu Apartment Fire in 2015 and Jecheon Sports Center Fire in 2017 in Korea, causing a number of casualties. It is believed that the fire compartment standards need to be reviewed as the fire in recent buildings continues to show problems. In this study, a comparative analysis was conducted on the fire prevention zone standard with Japan to improve the fire compartmente standard in Korea.

  • PDF

A Study on Fire Spread Prevention of Building using Combusitible Exterior (가연성 외장재를 사용한 건축물의 화재확대방지에 관한 연구)

  • Park, SungHa;Kwon, YoungJin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.149-150
    • /
    • 2018
  • Recently, a large fire has occurred through a dry bit, which is a flammable exterior material, in Daebong Green Apartment Fire in Uijeongbu in 2015 and Jecheon Sports Center Fire in 2017. In this study, KS F ISO 5660-1 Cone calorimeter experiment was used to examine the fire risk of dry bit. Also, the performance of the repair and reinforcement materials to prevent fire expansion was examined. As a result, the dry bit is likely to be ignited by internal and external flower gardens, and its combustion rate and calorific value are very high. In addition, the performance of heat resistance such as ALC panel and ceramic board as a repair and reinforcement material has been proved. However, the insulation is expected to require further consideration.

  • PDF

Calculation of Fire-resisting Time and Extraction of Simple Transplants in the Event of a Building Fire (건축물 화재시 필요내화 시간 산정 및 간이식 도출)

  • Kim, Yun-Seong;Han, Ji-Woo;kim, Hye-Won;Jin, Seung-Hyeon;Lee, Byeong-Heun;Kwon, Yeong-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.59-60
    • /
    • 2020
  • Large fires continue to spread throughout the building, including the fire in Uijeongbu in 2015, the fire in Jecheon in 2017, and the fire in Miryang in 2018. According to the above fire case investigation, major problems were the fire resistance performance of compartment members such as fire doors, the fire spread due to damage to exterior wall openings, and smoke spread through vertical openings. However, in South Korea, only specification design is implemented for buildings that are not subject to performance design. In addition, the analysis of the fire resistance performance standards of building members in the specification design showed that fire doors were not specified in detail for 60 minutes of insulation performance and 60 minutes of fire resistance performance of E/V doors, limiting the prevention of fire spread. Therefore, the purpose of this research is to prepare measures to prevent the spread of fire by presenting simple transplants for calculating the required fire time according to the architectural design conditions for the performance design of the components of the fire room according to the purpose of use of the front of the building.

  • PDF

A Survey on Prehospital Emergency Medical Service for the Improvement of Acute Coronary Syndrome Assessments - Focus on the Jecheon.Danyans Area - (급성관상동맥증후군 환자의 병원 전 119구급의료서비스 실태 및 개선방안 -충북 제천.단양을 중심으로-)

  • Roh, Sang-Gyun
    • Fire Science and Engineering
    • /
    • v.22 no.3
    • /
    • pp.293-299
    • /
    • 2008
  • From January, 2004 to July, 2007, 97 patients were diagnosed with Acute coronary syndrome(ACS) in Emergency Medical Center in Jecheon City in Korea. Among 97 patients, the prehospital assessment rates were as follows ; blood pressure check(27.80%, pulse rate check(33.0%), respiration check(23.7%). In hospital emergency care, oxygen supply was 52.6%, absolute bed rest was 12.4%, electrocardiogram(EKG) check was 4.1%, and nitroglycerin and intravenous fluid therapy was 0%. Therefore, ACS patients have not received sufficient prehospital cares till now. In order to improve the proficiency of the first aid emergency medical technicians(EMTs), it is necessary to provide the continuing On-the-job training(OJT) programs for prehospital emergency care.