• Title/Summary/Keyword: Investment projects

Search Result 628, Processing Time 0.025 seconds

A Study on Design of Production System for reducing Production Time in the Small and Medium Business (중소기업에서 생산시간 감소를 위한 생산시스템 설계에 관한 연구)

  • 조석호;양광모;서장훈;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.203-206
    • /
    • 2003
  • Each method for economic evaluation has its own characteristics. Therefore adoption of each of them in evaluation production investment project results in many problems. Hence combination & modification of them are required to perform more accurate evaluation about investment project. This paper discuss evaluation method of investment projects expansion and replacement investment on each line or individual in the production. Generally investment evaluation method has add to a few method by Subsidiary means with use a especial method. And then in this paper, a Taguchi Techniques is presented, which may be effective to the facilities appraisal or improvement. We propose a decision model to incorporates the values assigned by a group of experts on different factors in production. Using this model, SN ratio of taguchi method for each of subjective factors as well as values of weights are used in this comprehensive method for reducing production rate in production management.

  • PDF

A Study on Robust Design for reducing Production Time (생산시간 감소를 위한 강건 설계에 관한 연구)

  • 양광모;서장훈;송관배
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.4
    • /
    • pp.147-156
    • /
    • 2003
  • Each method for economic evaluation has its own characteristics. Therefore adoption of each of them in evaluation production investment project results in many problems. Hence combination & modification of them are required to perform more accurate evaluation about investment project. This paper discuss evaluation method of investment projects expansion and replacement investment on each line or individual in the production. Generally investment evaluation method has add to a few method by Subsidiary means with use a especial method. And then in this paper, a Taguchi Techniques is presented, which may be effective to the facilities appraisal or improvement. We propose a decision model to incorporates the values assigned by a group of experts on different factors in production. Using this model, SN ratio of taguchi method for each of subjective factors as well as values of weights are used in this comprehensive method for reducing production rate in production management.

A Study on Change in Perception of Community Service and Demand Prediction based on Big Data

  • Chun-Ok, Jang
    • International Journal of Advanced Culture Technology
    • /
    • v.10 no.4
    • /
    • pp.230-237
    • /
    • 2022
  • The Community Social Service Investment project started as a state subsidy project in 2007 and has grown very rapidly in quantitative terms in a short period of time. It is a bottom-up project that discovers the welfare needs of people and plans and provides services suitable for them. The purpose of this study is to analyze using big data to determine the social response to local community service investment projects. For this, data was collected and analyzed by crawling with a specific keyword of community service investment project on Google and Naver sites. As for the analysis contents, monthly search volume, related keywords, monthly search volume, search rate by age, and gender search rate were conducted. As a result, 10 items were found as related keywords in Google, and 3 items were found in Naver. The overall results of Google and Naver sites were slightly different, but they increased and decreased at almost the same time. Therefore, it can be seen that the community service investment project continues to attract users' interest.

The Effects of Financial Characteristics on the Relationship between R&D Investment and Firm Value (기업의 재무적 특성변수가 R&D 투자와 기업가치간의 관계에 미치는 영향)

  • Shin, Min-Shik;Kim, Soo-Eun
    • Journal of Technology Innovation
    • /
    • v.20 no.1
    • /
    • pp.45-73
    • /
    • 2012
  • In this paper, we analyse empirically the effects of financial characteristics on the relationship between R&D investment and market value of firms listed on Korea Exchange. The main results of this study can be summarized as follows. Firm size increase the market valuation of R&D investment because it provides economies of scale, easier access to capital market, and R&D cost spreading. Market share also positively effects the relationship between R&D investment and firm value. Alternatively, free cash flow has a negative effect on the relationship between R&D investment and firm value because firms with high free cash flow could be tempted to use the free cash flow to undertake negative NPV projects. The dependence on external finance is a handicap negatively assessed by the market when firms undertake R&D projects due to the higher information asymmetry associated with this kind of project. Labor intensity has a negative effect on the relationship between R&D investment and firm value because the abnormal profits arising from R&D investment are diluted among employees. Capital intensity also has a negative effect on the relationship between R&D investment and firm value due to the greater financial constraints faced by capital intensive firms. In conclusion, several financial characteristics(firm size and market share) positively effect the relationship between R&D investment and firm value, while others(free cash flow, dependence on external finance, labor intensity, and capital intensity) exert a negative effect. Therefore, we conclude that the effectiveness of R&D investment depends on these financial characteristics.

  • PDF

DEVELOPMENT OF LIFE CYCLE COST ANALYSIS SYSTEM FOR THE BUILD-TRANSFER-LEASE PROJECTS

  • Chun-kyong Lee;Bong-ho Cho;Tae-keun Park
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.119-129
    • /
    • 2007
  • In January 2005, the BTL private investment project was introduced in the Korean construction market as part of the plan to provide high-quality public service and expand the required facilities in a timely manner. Nonetheless, problems such as the low earning rate at the beginning of the business, burden of service compared to the cost of the proposed business, and limitations of the local small and medium-sized companies in relation to their participation in the project arose. The LCC analysis system for the BTL projects was developed as part of efforts toward efficiently investigating the investment eligibility. Specifically, methods for LCC analysis were selected for each stage of the BTL project in relation to the requests of experts for military residential facilities and public educational facilities. Variables were then extracted to derive an accurate analysis value, LCC for the 5 cost items (initial investment cost, operating expenses, maintenance expenses, energy cost, and disposal cost), analyzed, and system enabling comparative analysis for single and multiple initiatives by year and item, developed. Thus, we have to clearly require the accumulation of data to examine the appropriateness of the results of LCC analysis based on data and results.

  • PDF

RISK ANALYSIS OF FOREIGN DIRECT INVESTMENTS IN INNOVATIVE PROJECTS: CASE OF UZBEKISTAN

  • Lutfullaevich, Yoziev Golibjon
    • Asia Pacific Journal of Business Review
    • /
    • v.5 no.1
    • /
    • pp.11-19
    • /
    • 2020
  • This study is a review on Risk analysis of foreign direct investments in innovative projects of Uzbekistan. The study will examine SWOT and PESTL analysis as an effective situation analysis tool which plays an important role in the fields of management, marketing, and in any fields of requiring strategic planning. SWOT is an analysis method used to evaluate the 'strengths', 'weaknesses', 'opportunities', 'threats' and PESTL is an analysis tool used for measuring the 'political', 'economical', 'social', 'technological' and 'low' risks involved in a various sphere of economy. In this study, firstly the essence of SWOT and PESTL analysis is explained, secondly the components of SWOT and PESTL analysis is examined. The paper includes risk analysis for further investigation to innovation sector of Uzbekistan economy.

Multi-Dimensional Management Model on the Basis of Process to Evaluate Information Systems (정보시스템 평가를 위한 과정 기반 다차원 관리 모형 설계)

  • Lee, Sangwon;Kim, Sunghyun;Park, Sungbum;Ahn, Hyunsup
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2014.07a
    • /
    • pp.91-92
    • /
    • 2014
  • Public organizations and enterprises have repeated to invest in development or operation of their information systems. However, these investment projects have been not taken care of in the field of administration and evaluation. Since these information systems projects have unique characteristics such as technology sensitiveness, network effectiveness, embeddedness, and externality, it is not easy to manage and monitor them. Returns of investment for information systems should nonetheless need efficient monitoring and effective analysis for them. In this research, we propose a multi-dimensional management model on the basis of process in order to evaluate information systems.

  • PDF

Strategy Development for Expanding High-speed Railway into both Korean Domestic Market and Foreign Market (고속철도사업 활성화 및 건설업체의 해외사업참여 확대방향 연구)

  • Park, Heedae;Park, Hyung Keun;Jang, Hyeon Seok;Han, Seung Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.119-126
    • /
    • 2011
  • High-speed railway raises global interests with the growing concerns on the green development and the green energy. However, since most of the infrastructure investment of Korea was focused on the highway projects for last forty years, the investment on the railway has been limited around 40~50% of that of the highway projects. In addition, due to the world economy crisis and unsatisfactory support of existing policy for the private investment project, the private investment is given a small deal of weight on the social overhead capital investment. Meanwhile, despite the world high-speed railway market is growing rapidly and the Korean contractors have won the international construction contracts over 70 billion USD, past records of railway projects are very rare. Therefore, it is required to develop strategies for encouraging private investment in the domestic market to achieve efficient high-speed railway development and for advancing into foreign high-speed railway market. This study carried out data collection and market analysis for both domestic and foreign market respectively. Through a structured questionnaire survey and expert interviews, contractors' perceptions on the high-speed railway market and needs for the government support are collected. Summary of strategies drawn from this study are as follows: 1) carrying out BTL high-speed railway projects and revising related policies; 2) upwarding incentive level for the private pre-investment projects considering the contractors' credit rating; 3) carrying out Honam-Jeju submarine railway project; 4) establishing a efficient consortium model for foreign market; 5) improving the capacity of the Korea Railway Association that support Korean contractors' foreign advancement; and 6) expand the budget for Global Infra-fund.

Characteristics Analysis on Budget Distribution of Master Plan for Comprehensive Development Projects of Rural Villages (농촌마을종합개발사업의 기본계획 사업비 특성분석)

  • Kim, Dae-Sik;Lee, Seung-Han
    • Journal of Korean Society of Rural Planning
    • /
    • v.17 no.1
    • /
    • pp.13-27
    • /
    • 2011
  • This study analyzed the budget investment plans for the unit-project items(UPI) of 176 project districts for the rural village comprehensive development projects (RVCDP). This study classified the master plan reports of 176 project districts into 88 unit project items in aspect of project management, in order to analyze characteristics of distribution of budget in each project item. Most of all unit project items have similar types of uniform distribution with plus skewness in frequency pattern analysis except the total budget of the project district. This study analyzed the characteristics of budget distribution per province, year, and geographical types of region. Furthermore this paper also analyzed ratio of budget in unit project items to find out distribution pattern of each budget between project items over time. The hierarchical system for UPI of RVCDP consisted of three steps, which are 4 items of the first step on Strength of Rural-urban Exchange & Regional Capability (RURC), Green-income Infrastructure & Facility (GIF), Culture- health-welfare Facility, and Eco-environment & Landscape facility (ELF), 13 items for the second one, and 52 items for the third project items. From the results of the budget investment analysis for 5 years from 2004 to 2008, the budget investment ratios of RURC and ELF have steady state for every year, while GIF in decreasing and ELF in increasing over time. The ratios of UPI on infrastructure were decreased, whereas those on culture, health, and welfare were increased. Portion of tow project items among 52 items, which are community centers for village residents and rural experimental study facility, has 30% of total budget investment. Futhermore, the budget ratios of seven project items showed 50% of total budget. Average value of project budgets for five years was optimized as a type of exponential function in the case of decent array for ranking order.

Review on the Pertinent Discount Rate for the Public Investment Project (공공투자사업(公共投資事業)의 적정(適正) 할인율(割引率) 검토(檢討)에 관(關)한 연구(硏究))

  • Park, Jae Keun;Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.30 no.1
    • /
    • pp.89-101
    • /
    • 2003
  • For the pre-feasibility study and project evaluation, the discount rate or cutoff rate should be given by the government authority. To get the Benefit/Cost Ratio, NPV(Net Present Value) and IRR(Internal Rate of Return) of the public investment projects, the pertinent and realistic discount rate should be determined to be suitable to the present time period. The cut-off rates in Korea were equivalent to 15% in 1970's, 10% in 1980's and 8% in 1990's. The prevailing rate of discount as 8% is considered not to be suitable for the 2000's public project appraisal considering the present interest rates on deposit and national bonds. To determine the socio-economic feasibility of the public projects, the IRR should be bigger than the present cutoff rate. When we still use the high old rate of discount, the analytical results of project appraisal will show always economically unfeasible. Therefore the new rate of discount suitable for present time should be determined by the government. The public projects to be implemented in 2000 year onward are recommended to be adapted 5% of cutoff rate for the project appraisal and evaluation according to the results of reviewing the tendency of discount rates and market rates of interest in Korea.

  • PDF