• 제목/요약/키워드: Investment in cost reduction

검색결과 131건 처리시간 0.024초

CDM 사업부문별 투자비용 결정요인 분석: 폐기물 부문을 대상으로 (An Analysis on the Invest Determinants of CDM Project: Evidence from Waste Handling and Disposal Sector)

  • 김지훈;임성수
    • 한국유기농업학회지
    • /
    • 제28권4호
    • /
    • pp.535-553
    • /
    • 2020
  • In this study, the characteristics of the waste sector CDM project were analyzed through cluster analysis of the waste sector CDM project and the analysis of the CDM investment cost in waste sector using CDM project data registered with UNFCCC since 2008 when EU ETS phase 2 began. As of September 2020, 772 cases of CDM projects in waste disposal and disposal are registered. Biogas technology is the largest, followed by livestock manure processing and biomass production technology. The results of the cluster analysis are summarized as follows: First, on average, projects utilizing AWMS technology are small in size and relatively low in investment costs. This is judged to be relatively low investment costs due to previously attracted foreign investment capital. Second, the average investment cost of CDM projects considered along with waste (No.13), the energy industry (No.1) and agriculture (No.15) was higher than those involving only waste. The analysis of the factors determining the investment cost of the waste sector CDM project showed that, as with cluster analysis, the AWMS technology, which is a livestock manure treatment technology, was lower in the investment cost than those that use other technologies. As a result of multiple regression analysis, the investment cost of the CDM project was analyzed lower in the order of biomass, AWMS, LFG and biogas. Also, the higher the investment cost for CDM projects linked to waste, energy and agriculture, and the better the investment environment, the higher the investment cost. Although no statistical feasibility was obtained, the larger the annual emission reduction, the lower the CDM investment cost.

가스 공급기지에서 FMEA/HAZOP에 의한 안전관리 비용-편익분석 (Cost and Benefit Analysis for Safety Management Cost by FMEA/HAZOP at Governor Station)

  • 장서일;이헌창;조지훈;오신규;김태옥
    • 대한안전경영과학회지
    • /
    • 제3권4호
    • /
    • pp.1-9
    • /
    • 2001
  • Cost-benefit analysis was investigated to propose the analysis method of the effect of investment and the optimum investment level of safety management cost for preventing gas accident in the B governor station. From five classifications of safety management costs consisting of cost items with similar characters and potential accident costs calculated by risk assessments(FMEA/HAZOP), we found that the order of the benefit(the reduction cost of the potential accident cost) was the instrument increase and repair cost > the safety checking and inspection cost > the labor and training cost > the safety equipment and corresponding cost > the research and development cost. As the benefit was increased with increasing the investment cost, the effect of investment was increased with decreasing the Investment cost. As a result, the optimum safety management cost was estimated and the investment level was analyzed by the model of optimum investment level.

  • PDF

환경관련투자의 효율성 분석: 우리나라 제조업을 중심으로 (An Efficiency Analysis of Korea's CGEI and IPEP in the Manufacturing Industries)

  • 민승기
    • 환경정책연구
    • /
    • 제10권2호
    • /
    • pp.61-92
    • /
    • 2011
  • 제조업을 중심으로 분석한 환경관련투자 효율성의 주요 연구 결과는 다음과 같다. 내부수익률과 편익의 현재가치를 가변비용절감부문, 투자비용절감부문, 임대수입부문으로 분해함으로써 기존 연구의 범위를 확장했다. 그리고 단기총비용과 임대수입의 역할을 탐구하여 편익의 현재가치는 편익의 크기만을 나타내는 반면, 내부수익률은 효율성의 존재여부를 나타냄을 발견했다. 그리고 내부수익률과 시장이자율을 비교하는 투자효율성 방법론으로 환경관련투자와 관련된 투자효율성과 편익을 분석함으로써 사후 비용편익분석을 수행했다. 그 결과 환경투자, 공해방지투자 모두 비효율적인데, 공해방지투자가 환경투자보다 더 비효율적임을 발견했다.

  • PDF

Carbon Reduction Investments under Direct Shipment Strategy

  • Min, Daiki
    • Management Science and Financial Engineering
    • /
    • 제21권1호
    • /
    • pp.25-29
    • /
    • 2015
  • Recently much research efforts have focused on how to manage carbon emissions in logistics operations. This paper formulates a model to determine an optimal shipment size with aims to minimize the total cost consisting not only of inventory and transportation costs but also cost for carbon emissions. Unlike the literature assuming carbon emission factors as a given condition, we consider the emission factors as decision variables. It is allowed to make an investment in improving carbon emission factors. The optimal investment decision is shown to be of a threshold type with respect to unit investment costs. Moreover, the findings in this work provide insights on the various elements of the investment decision and their impacts.

탄소배출권거래제도에서의 공급망 조정 모형 (Supply Chain Coordination Under the Cap-and-trade Emissions Regulation)

  • 민대기
    • 대한산업공학회지
    • /
    • 제41권3호
    • /
    • pp.243-252
    • /
    • 2015
  • This paper considers a supply chain consisting of a manufacturer under the cap-and-trade emissions regulation and a permit supplier. We study joint production quantity and investment in reducing permit production cost decisions for centralized and decentralized supply chains. We formulate two supply chain contracts with aims to coordinate the decentralized supply chain; wholesale price contract and cost-sharing contract. Under the cost-sharing contract, the manufacturer shares a part of the investment in reducing permit production cost and then is allowed to purchase emission permit at a lower price. We analytically find that the proposed cost-sharing contract with reasonable parameters can coordinate the supply chain whereas the wholesale price contract is not desirable to achieve the system-wide profit. Numerical example is followed to support the analysis.

Process Reliability Improvement and Setup Cost Reduction in Imperfect Production System

  • Lee, Chang-Hwan
    • 한국경영과학회지
    • /
    • 제22권4호
    • /
    • pp.93-113
    • /
    • 1997
  • In studying an EOQ-like inventory model for a manufacturing process, a number of findings were made. The system can "go out of control" resulting in a relatively minor problem state or "break-down". When the production system is in the minor problem statei produces a number of defective items. It is assumed that each defective piece requires rework cost and related operations. Once the machine breakdown takes place, the production system produces severely defective items that are completely unusable. Each completely unusuable item is immediately discarded and incurs handling cost, scrapped raw material cost and related operations. Two investment options in improving the production process are introduced : (1) reducing the probability of machine breakdown, breakdowns, and (2) simultaneously reducing the probability of machine breakdowns and setup costs. By assuming specific forms of investment cost function, the optimal investment policies are obtained explicitly. Finally, to better understand the model in this paper, the sensitivity of these solutions to changes in parameter values and numerical examples are provided.amples are provided.

  • PDF

작업관련성 손상·질병 발생과 손실비용에 따른 예방정책 우선순위 연구 (An Analysis of Policy Priority for Work-Related Injury & illness and Investment Losses of Workplace Safety)

  • 박경돈;이관형
    • 대한안전경영과학회지
    • /
    • 제15권4호
    • /
    • pp.7-16
    • /
    • 2013
  • As workplace incidents has been being declining in Korea, there is criticism of the effectiveness of occupational safety policy implementation. It is unknown that which policy target group needs to be targeted to yield effective injuries prevention. The purpose of this paper is to analyze and reveal the policy intervention group with a high priority in terms of industrial incident prevention and the related investment cost. A Policy Priority Model(PPM) is composed of 6 indicators regarding influences of both the incident reduction and the cost reduction. Z-score analyses are used to confirm the high policy priority area or policy target group. Overall, workplace with worker below 50 persons, construction site with the sales of more than a hundred million won, workplace with relatively small percentage of female employees and relatively higher percentage of older worker should be prioritized to reduce workplace injuries. This paper provides an analytic way that can be used to decide the policy priority workplace in order not only to reduce work-related injuries&illnesses and the related investment cost but to further lessen the related societal costs.

다종제품의 동적 로트크기결정 모형에서의 생산준비비용 절감효과에 관한 연구 (Setup Cost Reduction in a Multi-Product Dynamic Lot-Sizing Model)

  • 이운식;주철민
    • 산업공학
    • /
    • 제13권2호
    • /
    • pp.217-224
    • /
    • 2000
  • This paper analyzes the effects of setup cost reduction in a dynamic lot-sizing model for a single-facility multi-product problem. In the model, demands for each product are known, no backlogging is allowed, and a single resource is employed. Also, setup cost is defined as a function of capital expenditure to invest in setup cost reduction. Furthermore, in each production period the facility (or plant) produces many products, each representing a fixed part of the involved production activity (or input resource quantity). In this paper, the structure of the optimal solution is characterized and an efficient algorithm is proposed for simultaneously determining the optimal lot size with reduced setup cost and the optimal investment in setup cost reduction. Also, the proposed algorithm is illustrated by a numerical example with a linear and an exponential setup reduction functions.

  • PDF

지열 시스템의 난방 경제성 및 $CO_2$ 절감 실증 연구 (An Experimental Study on the Ground Source Heat Pump System for Heating Economic Efficiency and Reduction Amount of $CO_2$)

  • 남임우;백기동
    • 한국지열·수열에너지학회논문집
    • /
    • 제3권2호
    • /
    • pp.25-30
    • /
    • 2007
  • The final energy consumption in the building sector in Korea represents almost 20% of the total energy consumption. Besides, Space heating and hot water generation in Korea are based on fossil fuels, with a serious environmental impact. This study describes thermal performance of heating demonstration system using close-loop ground source heat pump installed at Korean minjok leadership academy. The results of the experimental study, it retrieve the investment cost for 3years 8months and reduction amount of $CO_2$are 293,900 $kgCO_2$.

  • PDF

통합 주문 및 가동준비단축 모형 (An Integrated Ordering and Setup Cost Reduction Model)

  • 이창환
    • 한국경영과학회지
    • /
    • 제25권3호
    • /
    • pp.49-64
    • /
    • 2000
  • A vendor supplies a product to a sole/major buyer on a lot-for-lot basis under deterministic inventory control conditions. The basic premise is that the setup cost reduction technologies are available to both the buyer and the vendor, and that the vendor's inventory and setup reduction investment costs differ from the buyer's. Therefore, an individually designed ordering and setup cost reduction policy will likely cause mismatches between the vendor's and the buyer's optimal cycle times. For this situation, we show that a joint optimal setup cost reduction and ordering policy, together with an appropriate side payment(quantity discount or premium price) schedule, can be designed in a spirit in a spirit of coordination to eliminate mismatches in individual optimal cycle times.

  • PDF