• Title/Summary/Keyword: Investment Loss

Search Result 211, Processing Time 0.025 seconds

휴리스틱 탐색전략을 이용한 배전계통 계획의 급전선 최적 경로 선정 (Optimal Feeder Routing for Distribution System Planning Using a Heuristic Strategy)

  • 최남진;김병섭;신중린
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권11호
    • /
    • pp.566-574
    • /
    • 2000
  • This paper propose a heuristic algorithm based on the Branch-Exchange (BE) method to solve Optimal feeder Routing(OFR) problem for the distribution system planning. The cost function of the OFR problem is consisted of the investment cost representing the feeder installation and the system operation cost representing the system power loss. We propose a properly designed heuristic strategy, which can handle the horizon-year expansion planning problem of power distribution network. We also used the loop selection method which can define the maximum loss reduction in the network to reduce calculation time, and proposed a new index of power loss which is designed to estimate the power loss reduction in the BE. The proposed index, can be considered with both sides, the low voltage side and voltage side branch connected with tie one. The performances of the proposed algorithms and loss index were shown with 32, 69 example bus system.

  • PDF

한국증권시장에서의 투자주체에 따른 Momentum, Reversal 효과

  • 이태규;한성권
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2008년도 추계학술대회 및 정기총회
    • /
    • pp.520-524
    • /
    • 2008
  • This research verifies the phenomenon of which the Momentum and Reversal effect of stock price would depend on the subject of investment in the point of view of the Behavior Finance hypothesis. For the experiment, this paper uses the KOSPI200 daily data and Net Investment Flow from Jan. 1999 to Dec. 2006. And we analyze the marginal profit and loss with foreigners, individual investors, and institutions. We verify the response of the subjects of investment based on the CAR for 3 days after more than 3 percent rising or drop. We also verify the response with respect to the ascending and descending trend based on the profit trend and subjects' behaviors a week before the drop.

  • PDF

조선 설비투자분석 및 관리절차의 적용에 관한 사례연구 (A Case Study on the Application of Shipyard Capital Investment Appraisal and Management Procedure)

  • 박주철;윤성태
    • 산업공학
    • /
    • 제12권2호
    • /
    • pp.285-293
    • /
    • 1999
  • This paper analyzes the facility investment appraisal process of a real world shipyard and proposes several improving points. For this purpose the investment appraisal sheets are investigated in terms of the theory of the discounted cash flow (DCF) method. Through this investigation, the differences between the theory and its application are clarified and it is tried to resolve the gab by applying the DCF method appropriately including explicit use of actual cash flows in revenue and expense expressions. It is also proposed that some portion of the capital loss caused by defending facility sales may not be the sunk cost and that the portion can conceptually be calculated by the difference between economic value and sales price.

  • PDF

배전자동화시스템 적용을 위한 경제성 평가 (Economic Evaluation far the Application of the Distribution Automation System)

  • 홍순학;하복남;김호용;정경희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.36-38
    • /
    • 1993
  • This study considers the economic aspect of the distribution automation system, which is the decision-making criteria of the electric utilities for the investment. The feeder automation candidate region is divided into two types of the urban and the rural. The total investment cost of the feeder automation for each type is estimated. The annual cost, is also estimated, by finding the fixed charge rate. To compare the annual cost and the economic effect cost, for the investment decision-making, the costs are quantitatively estimated on the following effects : the manpower replacement, the outage cost saving, the main transformer utilization improvement, the feeder utilization improvement, and the line loss reduction.

  • PDF

건설재해손실 영향요인 및 우선순위 분석 - 비보험비용 항목을 중심으로 - (An Analysis of Influential Factors and their Prioritization in Association with the Loss from Construction Disasters with a Focus on Uninsured Categories)

  • 양용구;김병석
    • 대한안전경영과학회지
    • /
    • 제16권3호
    • /
    • pp.23-34
    • /
    • 2014
  • With a view to analyzing the influential factors and their prioritization in association with the loss from construction disasters, this study has presented relative weighted value and importance for each category of loss by making a systematic classification of costs for non-insured categories (indirect costs) and conducting AHP analysis based on results of a survey of specialists. Through the study, first, I have divided the larger classification of loss factors into human loss factor, financial loss factor, special cost factor, and managerial loss factor, and, second, have presented prioritization of loss categories by allotting scores based on weighted values after calculating weighted value through pairwise comparison of loss levels. Based on these results of the study, we should be able to qualitatively calculate the loss costs that construction disasters inflict on business, promote rational decision-making and efficiency in spending related to a disaster, and compare it against safety investment designed to reduce disaster loss from the perspective of business strategy.

직류조류계산을 이용한 혼잡비용과 손실비용 평가 (Evaluation of Congestion Cost and Loss Cost using DC Load Flow)

  • 배인수;송우창
    • 조명전기설비학회논문지
    • /
    • 제26권12호
    • /
    • pp.93-98
    • /
    • 2012
  • Economics of available alternatives in the transmission planning are evaluated by the investment cost, loss cost and congestion cost. Congestion/loss cost is calculated in many years and many load levels by unit commitment of generators, optimal dispatch, load flow, judgement about transmission congestion and re-dispatch to reduce the congestion. The greatest difficulties to introduce variable optimization techniques on the transmission planning is the convergence of load flow. In this paper, economics in the transmission planning are evaluated using DC load flow, and case study is conducted on the Korea power system by proposed congestion/loss calculation methods.

시장참여자별 혼잡 및 손실 비용 산정 (Congestion and Loss Cost for the Market Participants)

  • 손현일;배인수;김진오
    • 전기학회논문지
    • /
    • 제60권11호
    • /
    • pp.2021-2027
    • /
    • 2011
  • Recently the power system consists of the more complicated structure, due to increase of power demands. In this circumstance, the congestion and loss capacity in transmission line is also increased. Accordingly, the investment planning of transmission system is required to reduce the congestion and loss of the transmission line. This paper proposes a method to compute the congestion and loss costs which are the key elements in economic assessment of the power system planning. And the benefit of market participants in CBP (Cost Based Pool) is computed. To demonstrate the efficient of the suggested methods, these methods are applied to peak load system of 2016 in the 4th Basic plan of Long-Them Electricity Supply and Demand.

건설공사의 사고예방비용에 대한 투자효과 분석 (The Benefit Cost Analysis of the Accident Prevention Cost in Construction Work)

  • 박종근
    • 한국안전학회지
    • /
    • 제20권1호
    • /
    • pp.113-118
    • /
    • 2005
  • This study delivers the actual condition of investment for industrial accident prevention based on survey of 500 construction sites from 'reports far industry safety and health' published by Korea Occupational Safety & Health Agency (KOSHA). The various research techniques were used such as technical statistic analysis for construction industry, cost comparison of industrial accident prevention and accident loss. A formula was deduced to calculate accident loss and accident frequency by accident prevention cost through regression analysis.

건설공사의 사고예방비용에 대한 효과분석(I) (The Benefit Cost Analysis of the Accident Prevention Cost in Construction Work(I))

  • 임헌진;김창은;김진수
    • 대한안전경영과학회지
    • /
    • 제7권5호
    • /
    • pp.9-18
    • /
    • 2005
  • This study delivers the actual condition of investment for industrial accident prevention based on survey of 526 construction sites. The various research techniques were used such as technical statistic analysis for construction industry, construction and civil engineering works, cost comparison of industrial accident prevention and accident loss. A formula was deduced to calculate accident loss and accident frequency by accident prevention cost through regression analysis.

건설공사의 사고예방비용에 대한 효과분석(II) (The Benefit Cost Analysis of the Accident Prevention Cost in Construction Work(II))

  • 임헌진;김창은;김진수
    • 대한안전경영과학회지
    • /
    • 제7권5호
    • /
    • pp.19-30
    • /
    • 2005
  • This study delivers the actual condition of investment for industrial accident prevention based on survey of 526 construction sites. The various research techniques were used such as technical statistic analysis for construction industry, construction and civil engineering works, cost comparison of industrial accident prevention and accident loss. A formula was deduced to calculate accident loss and accident frequency by accident prevention cost through regression analysis.