• 제목/요약/키워드: Investment Feasibility

검색결과 318건 처리시간 0.028초

부산지역 외국인투자 활성화 방안에 관한 연구 (The Study about Foreign Investment revitalization in Busan)

  • 김경희;이학승
    • 통상정보연구
    • /
    • 제10권3호
    • /
    • pp.163-195
    • /
    • 2008
  • This paper want to do the feasibility analysis that it uses financial statements in order to attract foreign investment to enter in the Busan area. And this paper would be presented the plan about foreign investment revitalization. To that end, this paper would be deployed the following methods and scope. First, It defines to the concept of foreign investment, foreign investment region, and foreign-invested enterprises, I wish to loot at the economic effects of positive and negative effects through foreign investment. Second, this study's scope would be set up foreign investment area of Busan, and investigate the land development cost of invested enterprises, construction cost of enterprises burden, expected revenues, etc. Third, it classified three industry for the feasibility analysis of entered enterprises, so would be yield industry-specific analysis using financial statements to be pre-research. Forth, this paper is suggested a revitalization plan for efforts to attract foreign investment, for the future through economic effective analysis of foreign invested-enterprises.

  • PDF

대규모 공공투자사업의 경제적 타당성 평가와 환경영향평가 통압 방안 - 새만금 간척사업을 사례로 - (Integration of the Feasibility Assessment Procedure and EIA of the Big Public Investment Project : In the Case of the Saemangeum Reclamation Project)

  • 최미희
    • 환경영향평가
    • /
    • 제11권2호
    • /
    • pp.93-107
    • /
    • 2002
  • The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.

개인정보보호 관련 공공사업의 타당성 조사를 위한 비용효과분석 사례 연구 (A Case Study on the Cost-Effectiveness Analysis for the Feasibility Study of Public Project Related to Personal Information Protection)

  • 조일형;김진;유진호
    • 지식경영연구
    • /
    • 제20권3호
    • /
    • pp.91-106
    • /
    • 2019
  • In the era of the 4th Industrial Revolution, the importance of information protection is increasing day by day with the advent of the 'hyper-connection society', and related government financial investment is also increasing. The source of the government's fiscal investment projects is taxpayers' money. Therefore, the government needs to evaluate the effectiveness and feasibility of the project by comparing the public benefits created by the financial investment projects with the costs required for it. At present, preliminary feasibility study system which evaluates the feasibility of government financial investment projects in Korea has been implemented since 1994, but most of them have been actively carried out only in some fields such as large SOC projects. In this study, we discuss the feasibility evaluation of public projects for the purpose of information security. we introduce the case study of the personal information protection program of Korean public institutions and propose a cost-effectiveness analysis method that can be applied to the feasibility study of the information protection field. Finally, we presented the feasibility study and criteria applicable in the field of information security.

Delphi기법을 통한 교통수요예측 Risk Management 적용 방안 (Application of Risk Management to Forecasting Transportation Demand by Delphi Technique)

  • 정성봉
    • 대한안전경영과학회지
    • /
    • 제13권2호
    • /
    • pp.267-273
    • /
    • 2011
  • Since 'The Act on Private Investment of The Infrastructure' was established in 1994, private investment as well as government's investment in transport infrastructure has been active. However investment in transport infrastructure has more risks than others' due to uncertainty both in traffic volume and in construction cost. In the current appraisal procedure of deciding transportation infrastructure investment, instead of risk management, the sensitivity analysis considering only the changes of benefit, cost and social discount rate which are main factor affecting economic feasibility is carried out. Therefore the uncertainty of various factors affecting demand, cost and benefit are not considered in feasibility study. In this study the problems in current investment appraisal system were reviewed. Using Delphi technique the major factors which have high uncertainty in feasibility study were surveyed and then improvement plan was suggested in the respective of classic 4 step demand forecasting method. The range estimation technique was also mentioned to deal with the uncertainty of the future.

철도건설 투자우선순위에 관한 연구 (A Study on Criteria for investment Priority of Railway Project)

  • 박일하;박용걸;김시곤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.112-116
    • /
    • 2008
  • Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.

  • PDF

투자사업의 수익성 평가 및 분석에 관한 소고 -주물시설에 대한 IRR를 중심으로- (Some Considerations of the Evaluation and Its Analysis on tile Profitability of the Investment Project. -On the Calculation and Analysis of IRR in Casting Facilities-)

  • 이상억
    • 산업경영시스템학회지
    • /
    • 제2권2호
    • /
    • pp.53-62
    • /
    • 1979
  • A widely accepted indicator of a project's economic potential is the internal rate of return (IRR). The primary objective of feasibility analysis for any project is to measure the economic potential for the project, normally defined as the expected return on capital investment. The analysis should be designed to determine whether a project is technically and economically sound, and under what conditions. Therefore, there are factors other than economic potential that must be taken into account in the reasonable composition of an investment program. These kinds of factors can be given proper consideration in project selection after the economic feasibility of alternative projects has been determined. The primary reason for having to choose among different projects is that capital resources are scare : the investment budget is limited. The case project, casting facilities investment project, treated in this paper were selected for their value in illustrating the methods of feasibility analysis. This case project an actual potential project and is analyzed on the basis of the best available data for the specific conditions for that project.

  • PDF

AHP기법을 활용한 기업정보화 투자타당성 분석 사례 연구 (A Case Study on Feasibility Analysis of Business Information Systems Investment using AHP)

  • 오상영;하대용
    • Journal of Information Technology Applications and Management
    • /
    • 제13권4호
    • /
    • pp.303-319
    • /
    • 2006
  • Business Information Systems are strategic applications to achieve companies' goals and innovation. This idea make companies invest their time and budget in the Information Systems. However, it is difficult to forecast effects of the investment in Information Systems and it causes hesitation of making decision. Thus, I researched a case so that I could forecast the effect of the information systems using AHP(analytic hierarchical process). In this study, I approached this matter with three views such as intelligence(review of prior literature), design(methodology development), and application. This study is significant in terms of practicality rather than theoretical dimension. Particularly, I suggested a way of quantifying in monetary value the quality aspects through inverting qualitative facts to quantitative facts and calculated the investment feasibility with it.

  • PDF

교통시설 상호연관성 분석방법론 개발 (Development of the Analysis Methodology for Interrelationship between Transportation Facilities)

  • 남궁백규;정성봉;장유진
    • 한국도로학회논문집
    • /
    • 제15권3호
    • /
    • pp.169-176
    • /
    • 2013
  • PURPOSES : Lots of criticism such as over/duplication investment, inconsistency of the policies among local governments and national plans etc. has been aroused due to the policy of supply-driven construction for transportation facilities. Recently, according to the environmental-friendly transportation policy, the investment of railroad has been expanded gradually, however the duplication with existing road facility makes it difficult to construct railroad. Thus it is necessary to evaluate the interrelationship between new project and existing facilities in the planning stage. However the method and the criteria for analyzing the duplication and over-investment of projects are not established in the manual, thus the feasibility of these projects are carried out from the economic point of view. METHODS: First, It reviewed about interrelationship criteria(domestic, overseas) and proposed implications and this study directions. Next, It developed the methods of evaluating independency, competitiveness and complementarity. RESULTS : In this study, the methods of evaluating independency, competitiveness and complementarity etc. are suggested to analyze the interrelationship between transportation facilities. The case study was carried out to examine the applicability of the methods. CONCLUSIONS: The methods raise rationality of decision-making compared to existing one. In the future, these methods are introduced into the manual of pre-feasibility study and feasibility study, more efficient decision-making and investment are expected.

청소년수련과 건설사업 타당성분석 (A Feasibility Study on Construction of the Youth Complex Center)

  • 노병옥;송진우;최상현;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문 발표회
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities arc to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is and effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260㎡ come into analysis to the best gross area. The finally, it is to study on economical efficiency. Income Statement estimated was came out ₩1,7billion. in addition, it offer various benefit by public facilities.

  • PDF

청소년수련관 건설사업 타당성분석 (A Feasibility Study on Construction of the Youth Complex Center)

  • 노병옥;송진우;최상현;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is an effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260$m^2$ cone into analysis to the best gross area The finally, it is to study on economical efficiency. Income Statement estimated was came out \1.7billion. in addition, it offer various benefit by public facilities.

  • PDF