• Title/Summary/Keyword: Inventory Area

Search Result 412, Processing Time 0.031 seconds

Preliminary Study for an Application to Environmental Impact Assessment of Remote Sensing Data (원격탐사자료의 환경영향평가 활용을 위한 기초연구)

  • Mun, Hyun-Saing;Kim, Myung-Jin;Kang, In-Goo;Bang, Kyu-Chul
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.1
    • /
    • pp.59-64
    • /
    • 1995
  • Environmental Impact Assesment(EIA) is composed of various procedures, such as screening, scoping, inventory survey, prediction, assessment, mitigation measure, alternative assessment, and post management. Remote sensing introduced lately begins to be applied ecosystem and land use in inventory survey and assessment of EIA. This study explains on land use classification, buffering analysis of residential area, and overlaying analysis of odor predictive data with residential area for application to EIA with remote sensing data. Residential area extracted from land use classification of remote sensing provides effectively buffering analysis of residential area in selection of landfill site with GIS. It could assess also residential effect to an offensive odor by overlaying analysis. Application methods in EIA should be enlarged to assess effectively.

  • PDF

Decision of Available Soil Depth Based on Physical and Hydraulic Properties of Soils for Landscape Vegetation in Incheon International Airport

  • Jung, Yeong-Sang;Lee, Hyun-Il;Jung, Mun-Ho;Lee, Jeong-Ho;Kim, Jeong-Tae;Yang, Jae E
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.48 no.5
    • /
    • pp.522-527
    • /
    • 2015
  • Decision of available soil depth based on soil physical and hydraulic properties for the $3^{rd}$ Landscape Vegetation Project in the Incheon International Airport was attempted. The soil samples were collected from the 8 sites at different depths, 0-20 and 20-60cm, for the three project fields, A, B, and C area. Physical and chemical properties including particle size distribution, organic matter content and electrical conductivity were analyzed. Hydrological properties including bulk density and water holding capacity at different water potential, -6 kPa, -10 kPa, -33 kPa, and -1500 kPa were calculated by SPAW model of Saxton and Rawls (2006), and air entry value was calculated by Campbell model (1985). Based on physical and hydrological limitation, feasibility and design criteria of soil depth for vegetation and landfill were recommended. Since the soil salinity of the soil in area A area was $19.18dS\;m^{-1}$ in top soil and $22.27dS\;m^{-1}$ in deep soil, respectively, landscape vegetation without amendment would not be possible on this area. Available soil depth required for vegetation was 2.51 m that would secure root zone water holding capacity, capillary fringe, and porosity. Available soil depth required for landscape vegetation of the B area soil was 1.51 m including capillary fringe 0.14 m and available depth for 10% porosity 1.35 m. The soils in this area were feasible for landscape vegetation. The soil in area C was feasible for bottom fill purpose only due to low water holding capacity.

Manufacturing System Design on the Introduction of ERP System (ERP 시스템 도입과정에서 생산시스템 설계방안)

  • 양광모;박재현;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.1
    • /
    • pp.105-114
    • /
    • 2002
  • Nowadays, most companies seek after the greatest profit by means of offering the goods which consumers want timely and efficiently and minimizing the cost of inventory and distribution channel which amounts to the great portion of total cost. And according as EC(Electronic Commerce) market has increased rapidly, SCM(Supply Chain Management) for EC become one of the most important facts for companies, therefore this paper suggest SCM scheme which EC, especially B to C, is added to the existing commerce system. This paper uses internet for information integration of distribution channel which is away from one another and applies TOC(Theory of Constraint)'s DBR(Drum-Buffer-Rope) Scheduling for synchronization through the whole supply chain. It is possible to synchronize the whole supply chain by means of making the speed of manufacturing and distribution to be controlled by consumer's order which is received in distribution center, and inventory and loss of sales opportunities are minimized by constant. Buffer Management. If inventories in distribution center is short, then it needs to search CCR(Capacity Constraint Resource) in supply chain and to control the speed of manufacturing and distribution according to the ability of CCR. This paper applies PT(Partial Transshipment) strategy for Delivery from distribution center to store or cyber consumer. the strategy this paper suggests chooses neighbour area from area which each distribution center takes charge, and then makes product ordered by cyber consumer which lives in the chosen area to be delivered according to inventory of distribution center.

An Optimal Ordering policy on Both Way Substitutable Two-Commodity Inventory Control System

  • Tanaka, Masatoshi;Yoshikawa, Shin-ichi;Tabata, Yoshio
    • Industrial Engineering and Management Systems
    • /
    • v.4 no.2
    • /
    • pp.145-157
    • /
    • 2005
  • There are a lot of raw materials, work-in-processes and finished goods in manufacturing industry. Here, the less stock of materials and work-in-processes manufacturing industry has, the worse the rate of the production is. Inversely, the more manufacturing industry has, the more expensive the cost to support them is. Thus, it is important for us to balance them efficiently. In general, inventory problems are to decide appropriate times to produce goods and to determine appropriate quantities of goods. Therefore, inventory problems require as more useful information as possible. For example, there are demand, lead time, ordering point and so on. In this paper, we deal with an optimal ordering policy on both way substitutable two-commodity inventory control system. That is, there is a problem of how to allocate the produced two kinds of goods in a factory to m areas so as to minimize the total expected inventory cost. The demand of each area is probabilistic, and we adopt the exponential distribution as a probability density function of demand. Moreover, we provide numerical examples of the problem.

Inventory policy comparison on supply chain network by simulation technique

  • Park, Nam-Kyu;Choi, Woo-Young
    • Journal of Navigation and Port Research
    • /
    • v.34 no.2
    • /
    • pp.131-136
    • /
    • 2010
  • The aim of the paper is to solve the problem of customer reduction due to the difficulty of parts sourcing which impacts production delay and delivery delay in SC networks. Furthermore, this paper is to suggest the new inventory policy of MTS in order to solve the problem of current inventory policy. In order to compare two policies, a LCD maker is selected as a case study and the real data for 2007 years is used for simulation input. The maker uses MTO policy for parts sourcing which has the problem of lead time even if it has some advantage of inventory cost. Based on current process. The simulation program of AS-IS model and TO-BE model using ARENA 10 version is developed for evaluation. In a result, the order number of two policies shows that MTO is 52 and MTS is 53. However the quantity of order shows big difference such that MTO is 168,460 and MTS is 225,106. Particularly, the lead time of new inventory policy shows much shorter that that of MTO such that MTO 100 is days and MTS is 16 days. In spite of short lead time by MTS policy, new policy has to take burden of inventory cost per year. Total inventory cost per year by MTS policy is US$ 11,254 and each part inventory cost is that POL is US$ 1,807, LDI is US$ 2,166 and Panel is US$ 7,281. The implication of the research is that the company has to consider the cost and the service simultaneously in deciding the inventory policy. In the paper, even if the optimal point of deciding is put into tactical area, the ground of decision is suggested in order to improve the problem in SC networks.

Easy and Quick Survey Method to Estimate Quantitative Characteristics in the Thin Forests

  • Mirzaei, Mehrdad;Bonyad, Amir Eslam;Bijarpas, Mahboobeh Mohebi;Golmohamadi, Fatemeh
    • Journal of Forest and Environmental Science
    • /
    • v.31 no.2
    • /
    • pp.73-77
    • /
    • 2015
  • Acquiring accurate quantitative and qualitative information is necessary for the technical and scientific management of forest stands. In this study, stratification and systematic random sampling methods were used to estimation of quantitative characteristics in study area. The estimator ($((E%)^2xT)$) was used to compare the systematic random and stratified sampling methods. 100 percent inventory was carried out in an area of 400 hectares; characteristics as: tree density, crown cover (canopy), and basal area were measured. Tree density of stands was compared through systemic random and stratified sampling methods. Findings of the study reveal that stratified sampling method gives a better representation of estimates than systematic random sampling.

The research of Economical Re-oder point Estimating Method for building construction on the Downtown Area (도심지 건설공사 건설 자재의 효율적 재주문시점 산정 방안에 관한 연구)

  • Yun, Jung-Suk;Kim, Geun-Hwan;Jo, Young-Sik;Kim, Chang-Duk
    • KIEAE Journal
    • /
    • v.13 no.1
    • /
    • pp.159-165
    • /
    • 2013
  • Recently buildings are being constructed on the downtown area. In most building construction sites on the downtown area, the need for adequate material inventories are critical in order to avoid project delays and cost increases due to inappropriate deliveries of key materials. However immoderate material inventories cause increasing inventory cost. Therefore, we need a proper management material inventories. This research re-establishes the existing safety stock and analyzes relationship between safety stock and service level. It suggests an economical re-order point based on safety stock considering service level, various demand and delivery time.

STUDYING THE CHRONICLE OF TIMBERLAND USING HISTORICAL ORTHOPHOTO AND SATELLITE DATA

  • Cho, Hyoung-Sig;Jayakumar, S.;Heo, Joon
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.576-579
    • /
    • 2007
  • Timber inventory is a good starting point for developing strategies to effectively manage the timberland. In the sale of timberland, pricing is mostly based on this inventory. For a small timberland, inventory by conventional ground survey could be possible. In the case of large and nationwide business transactions, swift and inexpensive inventory is worth to be considered as the conventional methods require more experienced man power, money and time. In the present study, it was aimed to identify the chronicle of timberland such as changes that has occurred owing to silvicultural activities and by other means using the historical aerial photography and satellite data. Historical aerial photos from National Aerial Photography Program (NAPP), National High Altitude Photography (NHAP), Survey Photography and Landsat satellite data were used. Orthophotos were constructed using the DOQQ and DEM from USGS. Simple photo interpretation technique was employed to classify the orthophoto and satellite data. The plantation area was classified into softwood, mixed and hardwood. The timber age and the corresponding acreage details and the changes were also estimated. The result of this study could be more useful to the timberland buyers to better understand the chronicle of timberland of their interest prior to transactions.

  • PDF

A Economic Order Quantity(EOQ) Determination Method considering Stock Yard Size (야적장 크기를 고려한 철근의 경제적 주문량(EOQ) 산정)

  • Lee, Jae-Myung;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.549-552
    • /
    • 2007
  • Inventory management is an important factor for cost saving in a construction project. stock yard of general public residence site is secured. but site of the downtown area is not. inventory management of site was performed an intuition and an experience. According to inventory management of site is necessary systematic and efficient. This study examine general idea stock and inventory management. and suggests a EOQ determination method considering stock yard size. and particularity of site.

  • PDF

A Study of Unaccounted-for Gas Volume : Seoul, Kyunggi Area (미설명 도시가스의 분석 : 경인지역 중심으로)

  • 김수덕;서정규
    • Journal of Energy Engineering
    • /
    • v.12 no.4
    • /
    • pp.328-338
    • /
    • 2003
  • A study is perfomed on the difference between the volume of gas purchased from Korea Gas Corporation (KGC) and that of measured gas deliveries including total sales, pipeline inventory, and other usage by gas companies at Seoul and Kyunggi area. Actual data md information from 1996 to 2001 on gas purchase from KGC, sales, loss and own company use and pipeline status of each gas company are used to identify net inventory change in pipeline, unaccounted inventory estimates based on billing cycle and their net changes. A framework to be used for the analysis of such differences and an empirical test result are being provided. As a conclusion, the hypothesis that each gas company purchased more than the volume of gas accounted-for by all the possible factors is shown to be rejected.