Researches on the introduction of ERP system kept on examining the critical successful factors (CSFs) that focus on factors to achieve effectively successful projects, and trying to measuring the actual effectiveness of the introduction of ERP system. However, most of the preceding researches on the effectiveness of the introduction of ERP system that was searching devoted effects has been ceased, and actually even researches on the economical results have just done the basic cognitive evaluation of result indicators by many questionnaires instead of objective measuring values, because of the difficulty of measuring the evaluation of the result. Moreover, researches on positive effects of the introduction of ERP on enterprise results and researches that failed to give advantageous effects showed different results each other. And a part of researches reported that only a part of result indicators were partially affected. In this research, we investigated Korean large enterprises or middle-sized enterprises in manufacture industry that introduces SAP R/3 and Oracle package to compare their quantitative financial results after the introduction of ERP system, in order to measure the effects of the ERP system. First, we evaluated the difference of the quantitative financial results before and after the introduction of the ERP system. Second, we evaluated the opportunities shown by the effects after the introduction of the ERP system. Third, we removed the sample of the exchange crisis (IMF) and executed the additional analysis to reflect the average increasing and decreasing rate in the industry, so that pure evaluation can be achieved. Inherent limits of precedent researches are removed and practical effects of the pure introduction of the ERP system are evaluated, so the research of this research is significant. The result of this research is as follows. Because of the introduction of ERP, the rate of turnover of inventory property has increased and sales of preparation inventory property have decreased so that more effective inventory property management has been achieved. Moreover, preparation sales of labor costs and preparation sales of the number of employees have decreased to show the effect of the reduction of labor costs. However, it could no be concluded that we could increase the profit due to the introduction of ERP system. Due to the introduction of ERP, although we concluded that the return on assets (ROA) and the additional value of one-person employee statistically showed obvious differences and increased, the return on equity failed to show obvious differences after the process of introduction of ERP.
This report was studied about to be any problems on government po]icy and business for introduction of advanced transit system in several Cities. And we should be proposed the adequate activation plans against those matters for efficiently introduction of advanced transit system.
The existing Law of fisheries Management of China was firstly established on October 30th, 1986 and revised in October, 2000. The new Law of Fisheries Management provided a basis for introduction of the TAC (total allowable catch) system into China. Introduction of the TAC system is a natural result of the practise of EEZ (exclusive economic zone). In addition, the inability of the traditional fishery management system and the promising results obtained by conductions of TAC system in some countries with advanced fishery also make the introduction of TAC system a necessity, However, the contradictions between the unrealistic introduction of the fisheries management systems, the small-scale operation, higher expense of the conduction and supervision of the systems, and the insufficiencies of human power, financial fund, and scientific technique of the underdeveloped country resulted in the ineffectiveness of the new systems. So this study is to discuss the background and the possibility of TAC system implementation in china. The results of this study showed that many factors restrict the implementation of TAC system into China at present. It will take a long time to practise the new system. meanwhile, reforming and improving the functions of the existing systems to provide a better environment will play an important role in the introduction of the TAC system into china.
ERP in the past, primarily centering on large enterprises and the introduction of competition in the global e-business, but along with the proliferation of small and medium-sized enterprises are now in earnest, or to take advantage of the introduction of the ERP plan. However, the introduction of the ERP cost and the effort required to develop, because many never previously introduced ERP expect that the introduction of cost and performance comparisons with the measurement is necessary. Until now, however, the introduction of a framework of analysis followed the introduction of ERP primarily to measure performance of a major improvement. This research, in addition to improving the performance of these tasks have been overlooked until now for the system's user satisfaction BSC (Balanced Scorecard) models and techniques using AHP-specific understanding of the Company (Group executives, middle managers groups, and user groups) Importance of priorities you want to analyze. In summary, the key findings of this study follows. First, ERP user satisfaction measurement for the balanced scorecard indicators in terms of the redevelopment. Second, the information system user satisfaction to the user layer (Layer 3), grouped by the measure. Thirdly, the user satisfaction of the important topics for attention as quantified by measuring the hierarchy. This model is for satisfaction levels as quantitative of future users of the new system, information systems and the introduction of a new model of development based on the evaluation data will be able to take advantage of.
Journal of Korea Society of Industrial Information Systems
/
v.11
no.3
/
pp.59-68
/
2006
Recently, introduction of Open Source Software into informatization of the government and public sector has been actively examined, however, Open Source Software is being rarely adopted due to the lack of verified and reliable data with regard to the criteria, process, performance and stability for introduction of Open Source Software. In this paper, the process, method and plan for performance verification for introduction of Open Source Software into mission critical systems of the government and public sector are suggested in order to solve the aforesaid problem Specially, a test system to judge whether or not to adopt Open Source Software in school affairs system of the NEIS(National Education Information System) of the Korean government was set up, and the method and process of performance verification by stage in addition to feasibility study were applied to the test system for verification. Based on the result of performance evaluation in the test system, the application of Linux to school affairs system of the NEIS is being successfully practiced. It is expected that this study will be a guideline to technical review process and performance verification method as necessary to introduce Open Source Software into the mission critical systems of government and public agencies.
This study examined the procedures and legal issues for introduction and current Salary-structures and methods for system introductions centered around Seoul Metro which is railway related public company along with the background on introducing Salary-peak system and national/international situations according to the changes in paradigms. Base on these, the study deduced presented plans for improving corporate competitiveness by the introduction of Salary-peak system such as target for applications and ages for Salary-peak and the rate of fall, plans for adjusting duties to present optimum plans according to the introduction of Seoul Metro Salary-peak System.
Proceedings of the Korean Society for Quality Management Conference
/
2004.04a
/
pp.255-260
/
2004
IEC 60300 series, the international standards on dependability management system are newly developed and introduced rapidly worldwide. In order to meet this situation, it is necessary to apply them to the Korean industries effectively. This requires for us to prepare in advance for the introduction of the certification system of IEC 60300. It includes the establishment of the infrastructure such as documentation of Korean Standards, introduction of test equipments and test manuals, recognition of the certification body and training of specialists etc. This paper addresses the first step for the Introduction of IEC 60300. It includes the necessity of introduction of the system, general requirements and procedures for the certification of the industries, sampling methods design and establishment of the dependability assurance system of the materials.
A point based speed enforcement system(SES) has been widely used in roadways to reduce the operating speeds and potential traffic accidents. Recently, the needs for introudcing new SES using point-to-point speed measurement was presented, however, no practical guidelines or justification of the system was available. This study investigated the effectiveness of the current SES and introduction of the new SES through user interview survey method. Survey results showed that 33% of respondents were unsatisfactory to the current way of SES operation, which was 11% higher than satisfactory respondents, and about 70% of the respondents supported the introduction of point-to-point based SES operation. A majority of respondents preferred the straight roadway segment, bridge and tunnel, and curved roadway segment for a start application site with the segment length of 1-5 km long. Using these survey results, an introduction scheme was discussed in terms of legal bases, installation criteria, and operational guidelines.
Journal of information and communication convergence engineering
/
v.9
no.1
/
pp.110-116
/
2011
The production environment of fast and accurate news video has been continuously changing together with technology advance. Especially, the editing of the news video advanced focusing on the non-linear system by the introduction of digital technology and the recording of news video advanced to 'tapeless' base. In this new news video production environment, the recorded news videos are transmitted, edited and archived through the NPS (Network Production System), which dramatically improves the efficiency of the news video production. However, there are some issues which need to be resolved in the introduction of NPS. The purpose of this research is to identify the necessity of NPS introduction in the changing news video production environment, explore the issues which should be resolved and suggest the proper way to introduce the NPS to broadcasting companies.
When the international fisheries order changes following the UN Law of the Sea, the new regional fisheries order is forming among East North Asian states and era of Economic Zones is really coming. In those changes of foreign and domestic fisheries environment, to maintain sustainable growth of the industry in 21st century the North East Asian states plot adjustments to fisheries management, such as introduction of the TAC system and others. The TAC seems to be an appropriate systematic response especially because traditional functions of fisheries management have already demonstrated their limits in regards to fisheries sustainable development. Introduction of the TAC to the North East Asian fisheries not only resolves the inability of traditional fisheries management to develop the industry consequently, but also strengthens the EEZ and existing marine management systems. However, the TAC was born by thewestern industrial mentality, still contains persistent mistakes and is difficult to change. Therefore, its introduction to and implication in North East Asian region might cause numerous problems. From this point of view, introduction of the TAC system will disregard peculiarities of North East Asian fisheries, so main efforts should be concentrated on improving the functions of existing system via consecutive step-by-step approach. In addition, the TAC should be grafted into the existing fisheries system through cooperative management system, creating stable systematic ground and considering scientific and fisheries motives. Especially, TAC system, unlike the traditional fisheries' management system, is scientific, being systematically developed one, and needs to be gradually installed, considering its systematic character. Therefore, the TAC should better be introduced by systematic and scientific approaches, paying more attention to strengthening the existing fisheries system, but not immediately and in the form it is right now. Concluding, introduction of the TAC can not be made considering the outward factors deriving from the UN Law of the Sea without corrections.'h overcome limitations and ineffectiveness of traditional fisheries, most efforts should be concentrated on basic revision of 21st centuries' fisheries and strengthening the functions of traditional fisheries aimed to develop the leading business of marine industries.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.