• Title/Summary/Keyword: Interruption Time

Search Result 289, Processing Time 0.028 seconds

A Study on the Priority Decision for Interconnection of PV System on Power Distribution System considering Customer Interruption Costs (정전비용 고려한 PV시스템의 배전계통 연계 우선순위 결정에 관한 연구)

  • Son, Chang-Nam;Han, Woon-Dong;Moon, Jong-Fil
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.3
    • /
    • pp.163-168
    • /
    • 2014
  • In this paper, when photovoltaic systems are connected to distribution system, most effective capacity and location of PV system are studied considering customer interruption costs of power distribution system. The reliability model of PV system considering the duration of sunshine, the model of time-varying load and Roy Billinton test system (bus2 model) are used. To simulate the effects of PV system, various cases are selected; (1) base case which is no connection of PV system to power distribution system when faults are occurred, (2) 3MW case which is 3[MW] connection of PV system (3) 4[MW] case, and (4) 20[MW] case which is 20[MW] connection of PV system to the bus of power distribution system. The capacity limit of connected PV system is settled to 14[MW] for all cases except case 4. The reliability and customer interruption costs for residential, general, industrial, and educational customer is evaluated.

An Improvement Scheme of Direct Load Control Program for Electric Power Demand Management (합리적 전력수요관리를 위한 직접부하제어 사업의 개선 방안)

  • Kim, Kyu-Ho;Choi, Seung-Kil;Song, Kyung-Bin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.8
    • /
    • pp.81-86
    • /
    • 2007
  • This paper proposes the scheme to improve the current direct load control(DLC) program by inspecting the problems of the DLC program. In order to increase the number of the customers participating DLC program, a reduction of the base incentive and an increase of the direct load control incentive are suggested based on the interruption cost of electric power considering the characteristics of load types and the introduction of demand side bidding is recommended. Secondly, the standards of power system operations is required to control DLC program efficiently for the penalty, interruption times, the number of interrupting loads, notice time for the load interruption and the periods of the DLC program contract.

Surge Characteristics Analysis of Three-phase Virtual Chopping at Vacuum Circuit Breaker (진공차단기 3상 동시 차단시의 서지 특성 분석)

  • Kim, Jong-Gyeum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.9
    • /
    • pp.1159-1164
    • /
    • 2018
  • Vacuum circuit breakers(VCB) are widely used for current interruption of high-voltage inductive loads such as induction motors. This VCB can be chopped off before the current zero due to its high arc-extinguishing capability. One of the outstanding features of VCB is that it can cut off high frequency re-ignition current more than other circuit breakers. If the transient recovery voltage generated in the arc extinguishing is higher than the dielectric strength of the circuit breaker, a re-ignition phenomenon occurs. The surge voltage of the re-ignition is very high in magnitude and the steepness of the waveform is so severe that it can act as a high electrical stress on the winding. If the high frequency current of one phase affects the other two phases when the re-ignition occurs, it may cause a high surge voltage due to the virtual current chopping. If the magnitude of the voltage allowed in the motor winding is high or the waveform level is too severe, it may lead to insulation breakdown. Therefore, it is necessary to reduce the voltage to within a certain range. In this study, we briefly explain the various phenomena at the time of interruption, analyzed the magnitude of the dielectric strength and the transient recovery voltage at the simultaneous three-phase interruption that can give the greatest influence to the inductive load, proposed a method to reduce the impact.

Study on a Scheme of Investment Considering Customer Interruption Cost in Power Distribution System (정전비용을 고려한 배전계통 설비의 투자 계획 수립 방안연구)

  • Chu, Cheol-Min;Kim, Jae-Chul;Lee, Tae-Hee;Moon, Jong-Fil
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2006.05a
    • /
    • pp.365-369
    • /
    • 2006
  • It is concentrated on a methodology to establish a scheme of investment on power distribution systems of components. This paper provides a methodology to estimate the scheme as using a customer interruption cost regarding reliability indices in power distribution systems. The proposed method basically uses the failure rate depending on time for explaining the deterioration of a component. Therefore, the theory of the sensitivity is used for deciding the precedence of the investment to consider an effect of each component's failure rate on the system reliability. After Estimating the sensitivity on component investment cost making incremental reliability level is produced by component's investment cost accumulated according to the precedence of the sensitivity. After that, the failure rate corresponding with reliability level on the curve of investment cost is used as producing the curve of customer interruption cost. Two curves have the crossing point that is proposed to acceptable reliability level for customer and utility. In this paper, the acceptable reliability level for customer with the utility is assessed to analyze customer interruption cost and sensitivity of reliability indices. In conclusion the result of investment based on this method is shown to the reliability level with two cost.

  • PDF

A Study on the Reliability Index and Customer Density of Distribution System (배전계통의 신뢰도 지수와 수용가 밀도에 관한 연구)

  • Bae, In-Su;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.9
    • /
    • pp.1646-1650
    • /
    • 2011
  • SAIDI(System Average Interruption Duration Index) is the index that signifies the power quality of customers. SAIDI is also used to know how well utilities operate their systems. The annual interruption time in the areas that consists of widely distributed customers, is generally longer than that in the areas that consists of heavily concentrated customers. The Reliability index of huge system is not necessarily better or worse than that of small system, because SAIDI is irrelevant to the total amount of power sold or the total number of customers. This paper proposes a customer density very relevant to SAIDI. The proposed customer density is used to modify the existing SAIDI to more clearly express the service level of power supply. A modified WSAIDI(weighted SAIDI) can be a useful indicator helping utilities improve the reliability of their systems and customers evaluate the service level of receiving power.

The Study of In Clustering Effects in InGaN/GaN Multiple Quantum Well Structure (InGaN/GaN 다중 양자우물 구조에서의 In 응집 현상의 연구)

  • 조형균;이정용;김치선;양계모
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2001.07a
    • /
    • pp.636-639
    • /
    • 2001
  • InGaN/GaN multiple quantum wells (MQWs) grown with various growth interruptions between the InGaN well and GaN barrier by metal-organic chemical vapor deposition were investigated using photoluminescence, high-resolution transmission electron microscopy, and energy filtered transmission electron microscopy (EFTEM). The luminescence intensity of the MQWs with growth interruptions is abruptly reduced compared to that of the MQW without growth interruption. Also, as the interruption time increases the peak emission shows a continuous blue shift. Evidence of indium clustering is directly observed both by using an indium ratio map of the MQWs and from indium composition measurements along an InGaN well using EFTEM. The higher intensity and lower energy emission of light from the MQW grown without interruption showing indium clustering is believed to be caused by the recombination of excitons localized in indium clustering regions and the increased indium composition in these recombination centers.

  • PDF

Direct Load Control Algorithm Based Locational and Electric Load Characteristics (지역적 특성과 부하특성을 고려한 직접부하제어 알고리즘)

  • Shin, Ho-Sung;Song, Kyung-Bin;Moon, Jong-Fil;Kim, Jae-Chul;Nam, Bong-Woo
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.264-265
    • /
    • 2006
  • This paper presents direct load control algorithm based locational and electric load characteristics. Direct load control is defined that demand-side management program activities that can interrupt consumer load at the time of annual peak load by direct control of the utility system operator by interruption power supply to individual appliances or equipment on consumer premises. Korean power system is divided into 14-areas considering branches operating in KEPCO, and electric loads are classified into 19 load groups considering interruption costs in this paper. The purpose of proposed method is to decrease social losses by controlling electric loads mainly whose interruption costs are low. It is expected that the proposed algorithm can be used as the countermeasure for the emergency state of the electric power dispatch in a operation point of view.

  • PDF

Analysis of a finite buffer with service interruption in a network interface unit (서비스 가로채기가 있는 네트워크 접속장치내의 유한버퍼의 분석)

  • 김영한
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.33A no.2
    • /
    • pp.1-7
    • /
    • 1996
  • In this paper, we analyzed the packet blocking probability of a finite buffer in a network interface unit. In general, a network interface unit which provides a means of interface between the network and computer has a microprocessor and a protocol processor for the network access protocols. It also has a receive buffer for the arriving packets from the network which is served by the microprocessor with service interruption by the protocol processor. In this paper, we modeled the receive buffer as a discrete time server with service interruption, and obtained the packet blocking probability using the mini-slot approximation.

  • PDF

Reliability-Centered Maintenance Model for Maintenance of Electric Power Distribution System Equipment (배전계통 기기 유지보수를 위한 RCM 모델)

  • Moon, Jong-Fil;Shon, Jin-Geun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.4
    • /
    • pp.410-415
    • /
    • 2009
  • With the implementation of electric power industry reform, the utilities are looking for effective ways to improve the economic efficiency. One area in particular, the equipment maintenance, is being scrutinized for reducing costs while keeping a reasonable level of the reliability in the overall system. Here the conventional RCM requires the tradeoff between the upfront maintenance costs and the potential costs of losing loads. In this paper we describe the issues related to applying so-called the "Reliability-centered Maintenance" (RCM) method in managing electric power distribution equipment. The RCM method is especially useful as it explicitly incorporates the cost-tradeoff of interest, i.e. the upfront maintenance costs and the potential interruption costs, in determining which equipment to be maintained and how often. In comparison, the "Time-based Maintenance" (TBM) method, the traditional method widely used, only takes the lifetime of equipment into consideration. In this paper, the modified Markov model for maintenance is developed. First, the existing Markov model for maintenance is explained and analyzed about transformer and circuit breaker, so on. Second, developed model is introduced and described. This model has two different points compared with existing model: TVFR and nonlinear customer interruption cost (CIC). That is, normal stage at the middle of bathtub curve has not CFR but the gradual increasing failure rate and the unit cost of CIC is increasing as the interruption time is increasing. The results of case studies represent the optimal maintenance interval to maintain the equipment with minimum costs. A numerical example is presented for illustration purposes.

Increased Antioxidants of Agastache rugosa by the Night Interruption Time (야파(night interruption)처리에 의한 배초향의 항산화 물질 증가)

  • Kim, Sungjin;Noh, Seungwon;Park, Jongseok
    • Journal of Bio-Environment Control
    • /
    • v.31 no.4
    • /
    • pp.319-324
    • /
    • 2022
  • The objective of this study was to determine the proper night interruption of photoperiods and dark periods for accumulating bioactive compounds of Agastache rugosa without decreasing plant growth. Five-week-old seedlings were transplanted in a DFT system with white LEDs. A. rugosa was treated with night interruption time treatments of 18:1:2:3, 18:2:2:2, 18:3:2:1 (light:dark:light:dark), and 20:4 (control) for 4 weeks. There were no significant differences except for leaf length, leaf width, and the number of flowers. The content of antioxidants in the shoot of A. rugosa was high in tilianin and acacetin, and the content of rosmarinic acid (RA) was significantly higher in the underground part. The RA content per dry weight of A. rugosa was 47.92 and 51.46% higher than that of the control in 18:1:2:3 and 18:2:2:2, and tilianin and acactin per dry weight were significantly higher in 18:3:2:1. There was no significant difference in growth due to the same day light integral, but 18:2:2:2 showed high total polyphenol contents. Therefore, it is thought that the effect of increasing secondary metabolites of A. rugosa without degradation of growth can be expected through night interruption treatment in plant factory cultivation systems using artificial light.