• Title/Summary/Keyword: Interruptible Load

Search Result 7, Processing Time 0.022 seconds

Direct Load Control Scheme for Congestion Problems in Power System Emergency (비상시 선로혼잡 해결을 위한 직접부하제어)

  • Shin, Ho-Sung;Kim, Byoung-Su;Song, Kyung-Bin;Kim, Jae-Chul;Lee, Hak-Ju;Kwon, Seong-Chul
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.307-310
    • /
    • 2005
  • Most of the electric power in the power system of South Korea is flowing from the south area to the north area, Seoul, in the capital of South Korea. Almost of the needs of the electric power in the capital area are about 43% of the total loads and generation plants are mainly located in the south area of South Korea. As mentioned the earlier characteristic, transmission congestion is one of the important research issues. Because of the limits of the power flows from the south to the north which are anticipated to be increased more and more in the future, these congestion situations may cause a serious voltage stability problem in emergency of the power system. Accordingly, we are interested in an interruptible load control program so as to solve this problem in emergency. This problem can be solved by an interruptible load management in emergency, however, the systematic and effective mechanism has not been presented yet. In this paper, the algorithm of interruptible load management plan using the line sensitivity to the loads for the transmission congestion management in emergency is presented. The proposed method is applied to 6-Bus sample system and their results are presented.

  • PDF

An Approach to Optimal Dispatch Scheduling Incorporating Transmission Security Constraints

  • Chung, Koo-Hyung;Kang, Dong-Joo;Kim, Balho H.;Kim, Tai-Hoon;Oh, Tae-Kyoo
    • Journal of Electrical Engineering and Technology
    • /
    • v.3 no.2
    • /
    • pp.199-206
    • /
    • 2008
  • The introduction of competition in electricity markets emphasizes the importance of sufficient transmission capacities to guarantee effective power transactions. Therefore, for the economic and stable electric power system operation, transmission security constrains should be incorporated into the dispatch scheduling problem. With the intent to solve this problem, we decompose a dispatch scheduling problem into a master problem(MP) and several subproblems(SPs) using Benders decomposition. The MP solves a general optimal power flow(OPF) problem while the SPs inspect the feasibility of OPF solution under respective transmission line contingencies. If a dispatch scheduling solution given by the MP violates transmission security constraints, then additional constraints corresponding to the violations are imposed to the MP. Through this iterative process between the MP and SPs, we derive an optimal dispatch schedule incorporating the post-contingency corrective rescheduling. In addition, we consider interruptible loads as active control variables since the interruptible loads can participate as generators in competitive electricity markets. Numerical examples demonstrate the efficiency of the proposed algorithm.

Development of the Load Curtailment Allocation Algorithm for Load Aggregator in Emergency Demand Response (부하관리사업자의 비상시 부하제어량 배분 알고리즘 개발)

  • 정구형;김진호;김발호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.8
    • /
    • pp.466-471
    • /
    • 2004
  • Electricity industries throughout the world are undergoing unprecedented changes. As a result, these changes lead to the separation of traditional integrated utilities and the introduction of competition in order that increase efficiency in electricity industry. Direct load control (DLC) system in competitive electricity market has a hierarchical interactive operation system, therefore, its control logic is also applied by bilateral interactive method that interchanges information related to interruptible load between operation hierarchies. Consequently, load curtailment allocation algorithm appropriate for new DLC system is required, and based on interchanged information, this algorithm should be implemented by most efficient way for each operation hierarchy. In this paper, we develop the load curtailment allocation algorithm in an emergency for new DLC system. Especially, the optimal algorithm for load aggregator (LA) that participates in competitive electricity market as a main operator for load management is developed.

Development of the Load Curtailment Allocation Algorithm for Load Aggregator in Emergeney Demand Response (부하관리사업자의 비상시 부하제어량 배분 알고리즘 개발)

  • Chung, Koo-Hyung;Kim, Jin-Ho;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.633-635
    • /
    • 2003
  • Electricity industries throughout the world are undergoing unprecedented changes. As a result, these changes lead to the separation of traditional integrated utilities and the introduction of competition in order that increase efficiency in electricity industry. Direct load control (DLC) system in competitive electricity market has a hierarchical interactive operation system, therefore, its control logic is also applied by bilateral interactive method that interchanges information related to interruptible load between operation hierarchies. Consequently, load curtailment allocation algorithm appropriate for new DLC system is required, and based on interchanged information, this algorithm should be implemented by most efficient way for each operation hierarchy. In this paper, we develop the load curtailment allocation algorithm in an emergency for new DLC system. Especially, the optimal algorithm for load aggregator (LA) that participates in competitive electricity market as a main operator for load management is developed.

  • PDF

A Study of Demand Response Resource in Ancillary Service (계통보조서비스에서 부하자원의 활용방안에 대한 고찰)

  • Kim S.C.;Yoo S.Y.;Kim H.J.;Kim H.J.;Park J.B.;Sin J.R.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.663-665
    • /
    • 2004
  • There are some demand response program which is Direct Load Control and so on in Korea. These are used to manage lack of power stability or shift peak time for shading load. It is very important not only using stability power system but controling and scheduling power system on the whole. Interruptible loads are essential resources to solve lack of energy and limit of constructing generator On recently days, Demand Response Program's reliability is recognized as ancillary or reserve service in many country. This paper presents a necessity to apply demand resource to our ancillary program. For this reason, it is introduce overseas ancillary program using load resource.

  • PDF

DP Formulation of Microgrid Operation with Heat and Electricity Constraints

  • Nguyen, Minh Y;Choi, Nack-Hyun;Yoon, Yong-Tae
    • Journal of Power Electronics
    • /
    • v.9 no.6
    • /
    • pp.919-928
    • /
    • 2009
  • Microgrids (MGs) are typically comprised of distributed generators (DGs) including renewable energy sources (RESs), storage devices and controllable loads, which can operate in either interconnected or isolated mode from the main distribution grid. This paper introduces a novel dynamic programming (DP) approach to MG optimization which takes into consideration the coordination of energy supply in terms of heat and electricity. The DP method has been applied successfully to several cases in power system operations. In this paper, a special emphasis is placed on the uncontrollability of RESs, the constraints of DGs, and the application of demand response (DR) programs such as directed load control (DLC), interruptible/curtaillable (I/C) service, and/or demand-side bidding (DSB) in the deregulated market. Finally, in order to illustrate the optimization results, this approach is applied to a couple of examples of MGs in a certain configuration. The results also show the maximum profit that can be achieved.

Multi-Objective Optimization Model of Electricity Behavior Considering the Combination of Household Appliance Correlation and Comfort

  • Qu, Zhaoyang;Qu, Nan;Liu, Yaowei;Yin, Xiangai;Qu, Chong;Wang, Wanxin;Han, Jing
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.5
    • /
    • pp.1821-1830
    • /
    • 2018
  • With the wide application of intelligent household appliances, the optimization of electricity behavior has become an important component of home-based intelligent electricity. In this study, a multi-objective optimization model in an intelligent electricity environment is proposed based on economy and comfort. Firstly, the domestic consumer's load characteristics are analyzed, and the operating constraints of interruptible and transferable electrical appliances are defined. Then, constraints such as household electrical load, electricity habits, the correlation minimization electricity expenditure model of household appliances, and the comfort model of electricity use are integrated into multi-objective optimization. Finally, a continuous search multi-objective particle swarm algorithm is proposed to solve the optimization problem. The analysis of the corresponding example shows that the multi-objective optimization model can effectively reduce electricity costs and improve electricity use comfort.