• Title/Summary/Keyword: International Bidding Strategies

Search Result 18, Processing Time 0.02 seconds

Bidding Strategy Determination by Defining Strategic Vector

  • Kang, Dong-Joo;Kim, Balho H.;Chung, Koo-Hyung;Moon, Young-Hwan
    • KIEE International Transactions on Power Engineering
    • /
    • v.3A no.1
    • /
    • pp.47-52
    • /
    • 2003
  • This paper presents a schematic process based on the method of eliminating dominated strategies to obtain the optimal bidding strategy Pursuing the Nash equilibrium Point. The Proposed approach is demonstrated for a bidding game in a generation competitive market with 2-dimensional bidding strategy vectors constituting a price-quantity strategy curve.

Modeling of an Electricity Market Including Operating Reserve and Analysis of Supplier's Bidding Strategies

  • Shin Jae-Hong;Lee Kwang-Ho
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.4
    • /
    • pp.396-402
    • /
    • 2005
  • In an electricity market with imperfect competition, participants devise bidding plans and transaction strategies to maximize their own profits. The market price and the quantity are concerned with the operation reserve as well as the bidding system and demand curves in an electricity market. This paper presents a market model combined by an energy market and an operating reserve market. The competition of the generation producers in the combined market is formulated as a gaming of selecting bid parameters such as intersections and slopes in bid functions. The Nash Equilibrium (NE) is analyzed by using bi-level optimization; maximization of Social Welfare (SW) and maximization of the producers' profits.

COMPETITOR ANALYSIS IN CONSTRUCTION BIDDING

  • B. L. Oo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.161-167
    • /
    • 2009
  • This paper offers a competitor analysis model for use by contractors as parts of more informed approach in identifying key competitors, and as a basis for formulating bidding strategies. Linear mixed model approach is used in measuring competitiveness between bids (by using bid competitiveness percentage) according to: (i) project size, (ii) work sector; (iii) work nature; and (iv) number of bidders. The model was tested empirically by application to a bidding dataset obtained from a large Hong Kong contractor. Allowing for heterogeneity across competing contractors (i.e. with the model parameters that varied across contractors), the results indicate that competitiveness in bidding of this contractor is generally greater than the majority of his competitors.

  • PDF

Bidding Strategically for Scheduling in Grid Systems

  • Naddaf, Babak;Habibi, Jafar
    • Journal of Information Processing Systems
    • /
    • v.5 no.2
    • /
    • pp.87-96
    • /
    • 2009
  • Grid computing is a new technology which involves efforts to create a huge source of processing power by connecting computational resources throughout the world. The key issue of such environments is their resource allocation and the appropriate job scheduling strategy. Several approaches to scheduling in these environments have been proposed to date. Market driven scheduling as a decentralized solution for such complicated environments has introduced new challenges. In this paper the bidding problem with regard to resources in the reverse auction resource allocation model has been investigated and the new bidding strategies have been proposed and investigated.

Unit Commitment for an Uncertain Daily Load Profile

  • Park Jeong-Do
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.1
    • /
    • pp.16-21
    • /
    • 2005
  • In this study, a new Unit Commitment (UC) algorithm is proposed to consider the uncertainty of a daily load profile. The proposed algorithm calculates the UC results with a lower load level than that generated by the conventional load forecast method and the greater hourly reserve allocation. In case of the worst load forecast, the deviation of the conventional UC solution can be overcome with the proposed method. The proposed method is tested with sample systems, which indicates that the new UC algorithm yields a completely feasible solution even when the worst load forecast is applied. Also, the effects of the uncertain hourly load demand are statistically analyzed, particularly by the consideration of the average over generation and the average under generation. Finally, it is shown that independent power producers participating in electricity spot-markets can establish bidding strategies by means of the statistical analysis. Therefore, it is expected that the proposed method can be used as the basic guideline for establishing bidding strategies under the deregulation power pool.

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

Using Logistic Regression for Determining the Factors Affecting Bidding Success in World Bank's International Consulting Projects in Indonesia (로그 회귀분석을 이용한 해외 엔지니어링 사업의 낙찰 성공 요인 분석 - 세계은행의 인도네시아 사업을 중심으로-)

  • Yu, Youngsu;Shin, Byungjin;Koo, Bonsang;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.80-89
    • /
    • 2018
  • World Bank projects enable Korean engineering firms to enter new markets and diversify their portfolio. These firms need to understand the critical factors for bidding success in such projects. The World Bank publishes as open records all their bidding history data in their open database. This provides an opportunity to identify empirically the factors that determine which firms on chosen. This research collected relevant bid data, focusing on Indonesia, to perform a logistic regression with the goal of statistically identifying significant factors that result in bidding success. Results showed that work experience, being included in a consortium, and having a local partner positively affected winning a bid. On the other hand, having a local competitor of the recipient country negatively impacts the chances of attaining a bid. Commensurately, Korean engineering firms need to increase their work experience in internationally recognized projects, and include a local partner as a joint venture partner to increase their chances, while refrain from conventional projects that can be performed by local engineering firms.

Partnering Strategy for Bidding Success in World Bank's Vietnam Consulting Project (ODA 컨설팅 사업 낙찰을 위한 기업의 협업 전략 도출 - 세계은행의 베트남 사업을 중심으로 -)

  • Lee, Jiseop;Lee, Jeonghun;Han, Seung Heon;Kang, Sin Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.6
    • /
    • pp.1021-1028
    • /
    • 2018
  • As entering the international construction market became more difficult than the past, ODA projects can be a breakthrough for domestic engineering companies to enter the international market. However, since many companies compete for limited projects, it is necessary to reinforce the competitiveness of bidding success. The competitiveness is the result of accumulating experience, reputation, and networking through partnering. Therefore, depending on which partnering strategy has been taken over a long period, the bidding success is decided. The objective of this study is to identify the effective partnering strategy for bidding success. For this, the World Bank bid results, focusing on consulting projects in Vietnam, are collected. Using the bid results, inter-firm network representing the partnering relationship is constructed and the Social Network Analysis is conducted. After then, by conducting the Logistic Regression Analysis, effective partnering strategies are suggested. The result shows that the diversification strategy is advantageous for transportation and city development projects and the concentration strategy is advantageous for water projects. The partnering strategy for the consulting project proposed in this study will be used as a reference for the domestic engineering companies to enter the Vietnam construction market in the future.

THE BUSINESS STRATEGY INNOVATIONS OF THE TOP DESIGN FIRMS IN GLOBAL DESIGN & ENGINEERING MARKET

  • Seok-In Choi;Hyoun-Seung Jang;Young-Hwan Lee;Sang-Bum Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1223-1230
    • /
    • 2005
  • The dynamic nature of the A/E/C industry, rapidly changing global market environments, and lowest cost competitive bidding make it difficult to survive in global design markets. To understand the global design markets, a case study has been undertaken. The top 150 global design firms represented in the ENR (Engineering News Record) from 1995 to 2003 are classified into three groups for the case study. First group is the firms which advanced in rank from 1995. Second group is the firms which maintained its rank from 1994 until 2003. Third group is the firms which went down in rank from 1995 until 2003. However, finding key factors and changing business strategies of successful top design firms are the fundamental goals in this paper. After examinations of case studies, this paper concludes and suggests that professionalization, M&A strategies, patrons of the government, and academic support are needed to be successful in the global design & engineering industry.

  • PDF

A Study on Associations among Number of Bidders, Contract Award Rate and Profitability on International Construction (해외건설에서의 입찰 업체 수와 프로젝트 수주성공률 및 수익률의 상관관계에 관한 연구)

  • Sohn, Tae-Hong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.247-253
    • /
    • 2011
  • In 2009, the Korean international construction industry showed a great performance, totaling 49.1 billion of contract and then this achievement has been considered a key milestone presenting that the international construction industry is one of the primary export industries of Korea. However, because of the construction firms' equalized levels of technology and price competitiveness, the competition among bidders is becoming more intensive. Moreover, this changing market circumstance leads construction firms to apply for bidding with the lowest price that could not meet the expected profitability of a project. Therefore, to develop various strategies based on project characteristics becomes one of the critical capabilities that construction firms should possess. Based on these motives, this study is aimed to investigate associations among number of bidders, contract award rate, profitability on international projects. For the correlation analysis, a set of data is structured by collecting all projects ranging from 1993 to 2009, excluding projects funded by official development and domestic funds. The number of bidders were grouped depending on project characteristics such as market regions, project types, bidding types, and order organization types. As the result of correlation analysis, contract award rate increases as the number of bidders increase, but the relationship between the number of bidders and profitability is negative. Understanding the correlations among variables can be employed in developing strategies to improve construction firms' competitiveness in the international construction market.