• Title/Summary/Keyword: International Bidding

Search Result 74, Processing Time 0.025 seconds

Competency Level Evaluation for Construction Management in Southeast Asian Countries

  • Kwon, Nahyun;Park, Moonseo;Lee, Hyun-Soo;Son, Bo-Sik;Kim, Junyoung;Kwon, Byung-Gi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.146-152
    • /
    • 2017
  • Recently, countries in the South-east Asia are making efforts to enhance the construction industry system and introduce the construction management system. However, it is challenging to apply construction management in site due to lack of technology and professionals for CM. This can result in frequent safety accidents, cost overrun, schedule delay, etc. Therefore, it is necessary to carry out a clear evaluation of the overall situation regarding the level of technology and required competency. The objective of this research is to investigate on which management skills and items for CM are required to improve the construction management skills in South-east Asian construction industry. As a result of the questionnaire, most of the officials selected that the design phase and the construction phase are important works, and the engineers evaluated activities during the bidding phase, the design phase and the construction phase as important works for construction management. However, in most of the results, it was observed that the current competency of Vietnam construction is insufficient compared to the evaluated importance of the skills. This can be explained by the fact that they are not capable of managing construction projects effectively as compared to the importance. The results can help to realize the inadequate aspects of local construction industry, which will be the basis of improvements. Also, it is expected to be supportive to improve construction management in the countries and also provide indicators related to work stage or technology that should be acknowledged when establishing the advancing strategy for Southeast Asian countries in the future.

  • PDF

The hierarchical structures of cause-and-effect relationships on the profit factors in overseas construction projects (해외건설공사 수익성 영향인자의 계층구조 및 사레적용에 관한 연구)

  • Han, Seung-Heon;Sun, Seung-Min;Park, Sang-Hyuk;Jung, Do-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.64-76
    • /
    • 2006
  • Korea's overseas construction industry has been rather depressed by the weakened profitability as well as the sharp decrease of the market shares due to the lack of international competitiveness and the declined international market. There exist a lot of various risks in performing the overseas construction, and especially EPC projects, which entail complicated process from different parts, also require a sophisticated procurement and management skill. Subsequently, to survive in the competitive international market, we need to establish strategies to select potentially profitable projects at the initial stage of bidding process and to mitigate the high degree of risk exposure through contract negotiation and its adjustment. This research discusses the trend of environment in international construction markets. Then, it identifies the key factors that affect the profitability significantly through the structured surveys from 59 actual overseas projects, and it analyzes the key factors by using statistical methods. This research provides the profitability evaluation bases, with which overseas construction participants can forecast and analyze the risk more systematically, by eliciting profit-influencing factors using the result of statistical analysis, literature review and structuring their cause-and-effect relationships. The profitability casual hierarchy structure describes the profitability factors' hierarchy in details and their interrelationships. It also enables us to find out critical factors directly related to profitability aggravation through a qualitative and quantitative analysis. Ultimately, with this hierarchy structure as the base, the research will suggest how to develop the quantitative profitability forecasting model.

Domestic and Overseas TBM Production Specification and Professional Training Program (국내외 TBM 제작 사양 및 전문인력 양성 프로그램 분석)

  • Kim, Ki-Hwan;Kim, Seong-Cheol;Kang, Si-On;Mun, Cheol-Hwa;Jeong, Yun-Young;Kim, Hyouk
    • Tunnel and Underground Space
    • /
    • v.29 no.5
    • /
    • pp.281-291
    • /
    • 2019
  • In Overseas case, most tunnels in under are or through the river are constructed with shield TBM and the manufacturer orders of related equipment suitable for the project are mode. Accordingly, the client provides the specifications required for the equipment manufacture. In addition, TBM equipment has been operated by those who have completed the expert training program, which for minimizing the risk of equipment operation in construction field corresponding to the mechanized construction. However, in Korea, such a system related to above the program and specifications has not yet been built, which is causing a lot of difficulties in construction field. Therefore, this study investigated the differences in bidding guides provided by mechanized construction in domestic and abroad, and the professional education programs for expert training being conducted from overseas. Futhermore, we will propose the guidelines of essential equipment specification contained in domestic bidding and provide the necessary manual for the professional education program for TBM as the mechanized construction method.

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

Constructability Assessment Model for International Construction Projects Using Structural Equation (구조방정식을 활용한 해외건설 프로젝트 시공성 평가 모델)

  • Lee, Yong Wook;Lee, Sang-Ku;Jang, Woosik;Han, Seung-Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.941-951
    • /
    • 2015
  • In the recent years, Korean construction companies have been awarded 680 billion USD in the oversea projects which lead to a successful quantitative growth. However, due to the lack of capability in the core technology and project management compared to the leading companies, in addition to low-price bidding, massive deficit projects have caused problems to the companies. In order to overcome the limitations of the lack of capabilities, the term constructability has been researched recently by developed countries to apply in the practical use. The concept of constructability must be applied for Korean companies to compete in the EPC construction projects. The term constructability is defined as the factor that affect the overall construction process of a project which is defined by the ease of construction and to secure the project quality. Therefore, this study aims to develop a constructability assessment model using the structural equation to assess the factors that affect the constructability in the design and construction stage. The purpose of using the structural equation is to analyze the direct and indirect correlation between each factor that affects the international construction projects. Total of 8 latent variables and 34 measured variables are derived through literature review, corporate reports, experts' interview and surveys. The result of the model suggests the constructability factors that are to be managed the most efficiently to reduce cost, time and improve the quality as well as a countermeasure strategy to successfully execute the target international construction projects.

A Study on Cause-and-Effect Hierarchy of Profit Factors for the Feasibility Evaluation of Overseas Construction Projects (해외건설공사의 타당성 평가를 위한 수익성 영향인자의 인과관계 계층구조 구축에 관한 연구)

  • Sun Seung-Min;Kim Han-Him;Han Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.373-378
    • /
    • 2003
  • Korea's overseas construction industry has been rather depressed by the weakened profitability as well as the sharp decrease of the market shares due to the lack of international competitiveness and the declined international market following the outbreak of Iraq war. There exist a lot of various risks in performing the overseas construction, and especially EPC projects, which entail complicated process from different parts, also require a sophisticated procurement and management skill. Subsequently, to survive in the competitive international market, we need to establish strategies to select potentially profitable projects at the initial stage of bidding process and to mitigate the high degree of risk exposures through contract negotiation and its adjustment. This research provides the profitability evaluation bases, with which overseas construction participants can forecast and analyze the risk more systematically, by eliciting profit-influencing factors from real overseas construction projects and structuring their cause-and-effect relationships. The profitability causal hierarchy structure describes the profitability factors' hierarchy in details and their interrelationships. It also enables us to find out critical factors directly related to profitability aggravation through a qualitative analysis. Ultimately, with this hierarchy structure as the base, the research will suggest how to develop the quantitative profitability forecasting model.

  • PDF

Emergence of New Business Mode in the Chinese Water Market - Hefei Wangxiaoying Wastewater TOT Project -

  • Lee, Seung-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.20-20
    • /
    • 2011
  • The purpose of this research aims to evaluate the emergence of new business mode in the Chinese water market since the mid-2000s - Transfer-Operate-Transfer(TOT) Projects. The study pays special attention to the case of the Hefei Wangxiaoying Wastewater Treatment TOT Project, which was awarded to the consortium of Berlin Water International and its Chinese partner in late 2004. The consortium secured an exclusive operating right for 23 years on the basis of a TOT scheme and would take responsibility of all the profits and losses in the operation of the plant. The total investment for the transfer amounted to RMB 491 million(US$70 million). The price was more than 288% of the original value, RMB 170 million (US$24 million). The project can be regarded as a successful case because of the following three causes. First, the Hefei government followed a series of standardized procedures in the international bidding, which ignited best-performed international players' competition for the project. Second, the project will bring in cutting-edge operation skills and management know-how. Third, the government succeeded in raising public asset values, and thanks to this, the government is able to consider other similar projects not only in the water sector but also other sectors in public utility services. Nevertheless, Berlin Water's point of view, there are several challenges. First, the company took a risk to pay such a large amount of cash to the Hefei government. Although such premium can be recouped in the operation period of 23 years, whether or not the company would be able to recover the initial investment and realize profits is in question due to an uncertainty of socio-political circumstances in China. Second, Berlin Water should expect a steep rise of water tariffs over the contract period in order to get the investment back. Water pricing is still a sensible matter to Chinese authorities, and therefore, it is uncertain if such rise of water tariffs would be possible. Third, the TOT mode leads to creation of a large amount of cash to government officials, which might have caused corruption between those who are involved in TOT deals. Then, the final contract fee would soar, which often results in the burden of normal customers. As discussed, the TOT mode has drawn much attention of foreign investors as a new alternative to enter into the Chinese water market. But it is important to note that foreign investors should be aware of possible risks in water TOT projects, which reflects some features of the Chinese political economy landscape and social norms. The Hefei case indicates that benefits can overshadow risks in TOT projects, which will continue to attract foreign investors that are dedicated to establishing their strongholds in the Chinese water market.

  • PDF

Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization

  • Hosny, Ossama A.;Elbarkouky, Mohamed M.G.;Elhakeem, Ahmed
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.11-19
    • /
    • 2015
  • This paper presents optimized artificial neural networks (ANNs) claims prediction and decision awareness framework that guides owner organizations in their pre-bid construction project decisions to minimize claims. The framework is composed of two genetic optimization ANNs models: a Claims Impact Prediction Model (CIPM), and a Decision Awareness Model (DAM). The CIPM is composed of three separate ANNs that predict the cost and time impacts of the possible claims that may arise in a project. The models also predict the expected types of relationship between the owner and the contractor based on their behavioral and technical decisions during the bidding phase of the project. The framework is implemented using actual data from international projects in the Middle East and Egypt (projects owned by either public or private local organizations who hired international prime contractors to deliver the projects). Literature review, interviews with pertinent experts in the Middle East, and lessons learned from several international construction projects in Egypt determined the input decision variables of the CIPM. The ANNs training, which has been implemented in a spreadsheet environment, was optimized using genetic algorithm (GA). Different weights were assigned as variables to the different layers of each ANN and the total square error was used as the objective function to be minimized. Data was collected from thirty-two international construction projects in order to train and test the ANNs of the CIPM, which predicted cost overruns, schedule delays, and relationships between contracting parties. A genetic optimization backward analysis technique was then applied to develop the Decision Awareness Model (DAM). The DAM combined the three artificial neural networks of the CIPM to assist project owners in setting optimum values for their behavioral and technical decision variables. It implements an intelligent user-friendly input interface which helps project owners in visualizing the impact of their decisions on the project's total cost, original duration, and expected owner-contractor relationship. The framework presents a unique and transparent hybrid genetic algorithm-ANNs training and testing method. It has been implemented in a spreadsheet environment using MS Excel$^{(R)}$ and EVOLVERTM V.5.5. It provides projects' owners of a decision-support tool that raises their awareness regarding their pre-bid decisions for a construction project.

KOMPSAT-2 COMMERCIAL USER SUPPORT TEAM (KOCUST) - ORGANIZATION AND ITS OPERATIONAL CONCEPTS -

  • Kim, Youn-Soo;Jeun, Gab-Ho;Jeun, Jung-Nam;Blet, Didier
    • Proceedings of the KSRS Conference
    • /
    • v.2
    • /
    • pp.808-811
    • /
    • 2006
  • The KOMPSAT-2 was developed by KARI and it was successfully launched from Plesetsk, Russia on 28th July 2006. The Korean government decided the commercialization of the KOMPSAT-2 image data and direct reception services worldwide. SPOT Image, based in Toulouse (France) was selected by KARI through an international open bidding as a foreign company for the KOMPSAT-2 image promotion over the entire world except the territory of Republic of Korea including the North Korea, the United States of America, UAE, Saudi Arabia, Kuwait, Qatar, Oman, Yemen, Egypt, Iran, Iraq, Jordan, Lebanon, and Syria. KAI (Korea Aerospace Industry Ltd.) is an engaged Korean company for this area. KARI has responsibility to operate the satellite, data acquisition, archiving for the worldwide commercialization. For the processing and delivery of the KOMPSAT-2 image data to the users of KAI and SPOT Image, KAI has the binding contract with KARI. So KAI has the responsibility for the commercial ground station operation such as user support, data processing, and the data delivery. The KOMPSAT-2 ground station is hosted in KARI, so KARI has developed the concept of KOCUST (KOMPSAT-2 Commercial User Support Team) jointly with KAI to support the data processing and delivery as KOMPSAT-2 developer and satellite operator. The main purpose of the KOCUST is to support the operational activities to provide the data and service quality to satisfy customers. KOCUST will be organized by the members of KARI and KAI together. KARI members will mainly take the role of KOCUST coordination, data processing and user support in a public sector. KAI members are going to take user desk, data validation and delivery et cetera, which are related with users. This paper describes a summarized concepts of KOCUST like organization, dedicated tasks of each part and work flow of daily operation.

  • PDF

A Study on the Bidder Evaluation System Using the Technology Proposal-Based Best Value System (기술제안입찰형 최고가치 낙찰제도 입찰자 평가체계에 관한 연구)

  • Yeo, Sang-Ku;Lee, Hyun-Chul;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.124-136
    • /
    • 2010
  • International construction market has been depressed significantly after 2000. Exclusive techniques and advanced construction management methods are desperately in demand so as to ensure the competitiveness in unlimited competition. Although public construction delivery system has been revised several times starting with introduction of the lowest bidding system in 1951, there has been no remarkable achievement whenever new system was introduced. This study analyzed the successful stories of developed countries like Europe, USA and Japan to settle successful rating system down and vitalize the best value system in Korea, which was introduced in October 2007. We constructed the bidder evaluation system for domestic situation, and designed the evaluation tool which is useful in utilization. Since this study were analyzed on only same systems of developed countries and domestic similar cases, this study is limited to typical construction in Korea. The study of specialized rating system in the field related should be followed.