• Title/Summary/Keyword: Intermediate Slab

Search Result 25, Processing Time 0.017 seconds

Structural Behavior of Concrete Girder Continuous Bridges Strengthened with External Tendons Considering the Efficiency at Negative Moment Region (부모멘트부의 효율성을 고려한 외부강선으로 보강된 콘크리트 거더 연속교의 거동)

  • Han, Man-Yop;Cho, Byeong-Du;Jeon, Se-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.25 no.5
    • /
    • pp.555-564
    • /
    • 2013
  • An effective method was proposed in this study which can improve the strengthening effect of continuous girder bridges by external tendons. The improvement of the proposed strengthening method in comparison with conventional methods was analyzed by applying equivalent load concept. In order to verify the strengthening effect, the enhancement of load-carrying capacity achieved by external prestressing was investigated through the test of continuous beams that were or were not strengthened by the external prestressing. The continuous beams were fabricated by making the deck slab continuous according to general construction practice of an actual concrete girder bridge. The test results showed that the deflections and strains of the strengthened beam were significantly reduced when comparing with those of the non-strengthened beam for the same level of external loads, and the stiffness of the member increased by strengthening. In particular, it was verified that the proposed method can effectively reduce the tensile stresses of the deck caused by negative moment at the intermediate supports of a continuous bridge.

Cyclic Loading Test for TSC Beam - PSRC Column Connections (TSC 합성보 - PSRC 합성기둥 접합부에 대한 주기하중 실험)

  • Hwang, Hyeon Jong;Eom, Tae Sung;Park, Hong Gun;Lee, Chang Nam;Kim, Hyoung Seop
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.6
    • /
    • pp.601-612
    • /
    • 2013
  • In the present study, details of the TSC beam-to-PSRC column connection for low and middle seismic zones were developed. For ease construction, the top and bottom flanges of the steel section of the TSC beam were discontinuous at the joint face on purpose, while the web passes through the joint. Thus, tensile resistance of the top and bottom flanges is not considered in the calculation of nominal strength of the connection. Cyclic loading tests on two interior connections and an exterior connection were performed to verify the seismic performance. The test parameter for two interior connections was the depth of the TSC beams: 600 and 700 mm including the slab depth. The test results showed that the nominal strength of the connections predicted by KBC 2009 correlated well with the test results. The connection specimens exhibited relatively good deformation and energy dissipation capacities, greater than the requirements for the ordinary and intermediate moment frames. Ultimately, the connection specimens were failed at the story drift ratios of 3.0 to 4.0 % due to local buckling and tensile fracture of the web of the TSC beam passing through the joint. By modifying the existing provisions of ASCE, the joint shear strength of the TSC beam-PSRC column connection was evaluated.

Long-term Performance of Fiber Grid Reinforced Asphalt Pavements Overlaid on Old Concrete Pavements (노후 콘크리트포장 위에 덧씌운 섬유그리드 보강 아스팔트포장의 장기공용성)

  • Lee, Ju Myeong;Baek, Seung Beom;Lee, Kang Hoon;Kim, Jo Soon;Jeong, Jin Hoon
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.31-43
    • /
    • 2017
  • PURPOSES : The objective of this study is to verify the effect of fiber grid reinforcement on the long-term performance of asphalt pavement overlaid on old concrete pavement by performing field investigation, laboratory test, and finite element analysis. METHODS : The reflection cracking, roughness, and rutting of fiber grid reinforced overlay sections and ordinary overlay sections were compared. Cores were obtained from both the fiber grid reinforced and ordinary sections to measure bonding shear strength between the asphalt intermediate and asphalt overlay layers. Fracture energy, displacement after yield, shear stiffnesses of the cores were also obtained by analyzing the test results. Finite element analysis was performed using the test results to validate the effect of the fiber grid reinforcement on long-term performance of asphalt pavement overlaid on the old concrete pavement. The fatigue cracking and reflection-cracking were predicted for three cases: 1) fiber grid was not used; 2) glass fiber grid was used; 3) carbon fiber grid was used. RESULTS : The reflection-cracking ratio of fiber grid reinforced sections was much smaller than that of ordinary sections. The fiber grid reinforcement also showed reduction effect on rutting while that on roughness was not clear. The reflection-cracking was not affected by traffic volume but by slab deformation and joint movement caused by temperature variation. The bonding shear strength of the fiber grid reinforced sections was larger than that of the ordinary sections. The fracture energy, displacement after yield, and shear stiffnesses of the cores of the fiber grid reinforced sections were also larger than those of the ordinary sections. Finite element analysis results showed that fatigue cracking of glass or carbon fiber grid reinforced pavement was much smaller than that of ordinary pavement. Carbon fiber grid reinforcement showed larger effect in elongating the fatigue life of the ordinary overlay pavement compared to glass fiber grid reinforcement. The binder type of the overlay layer also affected the fatigue life. The fiber grid reinforcement resisted reflection-cracking and the carbon fiber grid showed the greater effect. CONCLUSIONS :The results of field investigation, laboratory test, and finite element analysis showed that the fiber grid reinforcement had a better effect on improving long-term performance of asphalt pavement overlaid on the old concrete pavement.

Paleogene dyke swarms in the eastern Geoje Island, Korea: their absolute ages and tectonic implications (거제도 동부에 분포하는 고제3기 암맥군: 절대연대와 지구조적 의미)

  • Son, Moon;Kim, Jong-Sun;Hwang, Byoung-Hoon;Lee, In-Hyun;Kim, Jeong-Min;Song, Cheol-Woo;Kim, In-Soo
    • The Journal of the Petrological Society of Korea
    • /
    • v.16 no.2 s.48
    • /
    • pp.82-99
    • /
    • 2007
  • The Paleogene dikes intruding into the late Cretaceous granodiorite are pervasively observed in the Irun-myeon, eastern Geoje Island. They are classified into three groups: NW-trending acidic dike swarm and WNW- (A-Group) and $NS{\sim}NNE-trending$ (B-Group) basic dike swarms. Based on their cross-cutting relationships, the earliest is the acidic dike group and fellowed by A- and B-Groups in succession. The acidic dikes seem to have intruded into tension gashes induced by the sinistral strike-slip faulting of the Yangsan fault system during the late $Cretaceous{\sim}early$ Paleogene. In terms of rock-type, orientation, age, and geochemistry, A-Group and B-Group are intimately correlated with the intermediate and basic dike swarms in the Gyeongju-Gampo area, respectively. These results significantly suggest that the corresponding dike swarms are genetically related. Based on the K-Ar and Ar-Ar age data, A- and B- Groups were intruded during $64{\sim}52\;Ma$ and $51{\sim}44\;Ma$, respectively. The result means that the direction of tensional stress in and around the SE Korean peninsula was changed abruptly from NNE-SSW to $EW{\sim}WNW-ESE$ at about 51 Ma. Considering the tectonic environments during the Paleogene, it is interpreted that A-Group was injected along the WNW-trending tensional fractures developed under an regional sinistral simple shear regime which was caused by the north-northwestward oblique subduction of the Pacific plate beneath the Eurasian plate. Meanwhile, the regional stress caused by the collision of India and Eurasia continents at about 55 Ma was likely propagated to the East Asia at about 51 Ma, and then the East Asia including the Korean peninsula was extruded eastwards as a trench-rollback and the dip of downgoing slab of the Pacific plate was abruptly steepened. As a result, the strong suction-force along the plate boundary produced a tensional stress field trending EW or WNW-ESE in and around the Korean peninsula, which resultantly induced B-Group to intrude passively into the study area.

Development of remote control automatic fire extinguishing system for fire suppression in double-deck tunnel (복층터널 화재대응을 위한 원격 자동소화 시스템 개발 연구)

  • Park, Jinouk;Yoo, Yongho;Kim, Yangkyun;Park, Byoungjik;Kim, Whiseong;Park, Sangheon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.167-175
    • /
    • 2019
  • To effectively deal with the fire in tunnel which is mostly the vehicle fire, it's more important to suppress the fire at early stage. In urban tunnel, however, accessibility to the scene of fire by the fire fighter is very limited due to severe traffic congestion which causes the difficulty with firefighting activity in timely manner and such a problem would be further worsened in underground road (double-deck tunnel) which has been increasingly extended and deepened. In preparation for the disaster in Korea, the range of life safety facilities for installation is defined based on category of the extension and fire protection referring to risk hazard index which is determined depending on tunnel length and conditions, and particularly to directly deal with the tunnel fire, fire extinguisher, indoor hydrant and sprinkler are designated as the mandatory facilities depending on category. But such fire extinguishing installations are found inappropriate functionally and technically and thus the measure to improve the system needs to be taken. Particularly in a double-deck tunnel which accommodates the traffic in both directions within a single tunnel of which section is divided by intermediate slab, the facility or the system which functions more rapidly and effectively is more than important. This study, thus, is intended to supplement the problems with existing tunnel life safety system (fire extinguishing) and develop the remote-controlled automatic fire extinguishing system which is optimized for a double-deck tunnel. Consequently, the system considering low floor height and extended length as well as indoor hydrant for a wide range of use have been developed together with the performance verification and the process for commercialization before applying to the tunnel is underway now.