• Title/Summary/Keyword: Interconnection capacity

Search Result 59, Processing Time 0.025 seconds

Increasing Hosting Capacity of Distribution Feeders by Analysis of Generation and Consumption (배전선로 부하량 및 발전량 분석을 통한 신재생 접속허용용량 기준 상향에 대한 연구)

  • Kim, Seong-Man
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.4
    • /
    • pp.295-309
    • /
    • 2019
  • This paper demonstrates that the verification and analysis of the increase of hosting capacity of distributed energy resources in distribution system for the high penetration of distributed energy resources. In the case of generally designed distribution feeders in South Korea, it can host up to 10 MVA of distributed energy resources and the over voltage due to reverse power flow is prohibited beyond the range by the law of electric utility. However, it should take into consideration that there are some factors of extra hosting capacity such as generation characteristics of distributed energy resources and minimum loads that always exist to distribution system. For these reason, we choose a specific distribution system hosted 10 MVA of distributed energy resources monitored by distribution system operator and verify the impact of increasing hosting capacity such as power flow and voltage profile of distribution system. By the result, we could find that it is possible to increase the hosting capacity and define the factors to expand the hosting capacity of distributed energy resources in distribution system.

An Optimal Capacity Allocation Problem in Designing advanced Information Communication Processing System (대용량 통신처리시스템에서 사용자 이용성향과 ISDN를 고려한 망정합장치의 회선용량 분배에 관한 연구)

  • 김영일;김찬규;이영호;김영휘;류근호
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.25 no.5B
    • /
    • pp.809-819
    • /
    • 2000
  • This paper deals with an optimal capacity allocation problem and performance analysis in Advanced Information Communication Processing System(AICPS). AICPS is a gateway system interconnection PSTN(Public Switched Telephone Network), ISDN(Intergrated Services Digital Network), PSDN(Packet Switched Data Network), internet, Frame Relay and ATM together. This study considers not only ISDN and Internet but also user behavior of On-line service which is analyzed by Markov process. A call blocking probability of TNAS and INAS is computed by Erlang's formula. Then, PNAS and WNAS's call blocking probability are computed by Stochastic knapsack modeling. The result is compared with result of simulation. Finally, we allocate an optimal capacity minimizing total call blocking probability.

  • PDF

Evaluation Method for Protection Coordination of PV Systems Interconnected with Primary Feeders (태양광전원이 연계된 고압배전선로의 보호협조 평가 방안에 관한 연구)

  • Kim, Byungki;Kim, Sohee;Ryu, Kyungsang;Rho, Daeseok
    • Journal of the Korea Convergence Society
    • /
    • v.2 no.4
    • /
    • pp.29-37
    • /
    • 2011
  • Dispersed generation (DG) such as wind power (WP) and Photovoltaic systems (PV) that has been promoted at the national level recently is mainly being introduced into distribution systems adjacent to consumers because it is generation on a small scale when compared to current generation. Due to its characteristics, DG can be operated by interconnection with distribution systems to present security of more stable power and efficient use of power facilities and resources. Problems on protection coordination of distribution systems by reverse flow of DG can roughly be divided into three possibilities: excess in rated breaking capacity (12.5KA) of protective devices by a fault in DG current supply, failure to operate protective devices by an apparent effect that can occur by reduction in impedance parallel circuit fault current due to interconnection of DG, and malfunction of protective devices by interconnection transformer connection type. The purpose of this study is to analyze problems in protection coordination that can occur when DG is operated by interconnection with distribution systems by conducting modeling and simulations by using theoretical symmetrical components and MATLAB/SIMULINK to present methods to improve such problems.

A Study on the Calculation of Optimal Compensation Capacity of Reactive Power for Grid Connection of Offshore Wind Farms (해상풍력단지 전력계통 연계를 위한 무효전력 최적 보상용량 계산에 관한 연구)

  • Seong-Min Han;Joo-Hyuk Park;Chang-Hyun Hwang;Chae-Joo Moon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.19 no.1
    • /
    • pp.65-76
    • /
    • 2024
  • With the recent activation of the offshore wind power industry, there has been a development of power plants with a scale exceeding 400MW, comparable to traditional thermal power plants. Renewable energy, characterized by intermittency depending on the energy source, is a prominent feature of modern renewable power generation facilities, which are structured based on controllable inverter technology. As the integration of renewable energy sources into the grid expands, the grid codes for power system connection are progressively becoming more defined, leading to active discussions and evaluations in this area. In this paper, we propose a method for selecting optimal reactive power compensation capacity when multiple offshore wind farms are integrated and connected through a shared interconnection facility to comply with grid codes. Based on the requirements of the grid code, we analyze the reactive power compensation and excessive stability of the 400MW wind power generation site under development in the southwest sea of Jeonbuk. This analysis involves constructing a generation site database using PSS/E (Power System Simulation for Engineering), incorporating turbine layouts and cable data. The study calculates reactive power due to charging current in internal and external network cables and determines the reactive power compensation capacity at the interconnection point. Additionally, static and dynamic stability assessments are conducted by integrating with the power system database.

An Investigation on Correction of Overcurrent Protective Relaying Set Value for Bus Interconnected with Distributed Generations (분산전원의 계통 연계에 따른 모선 보호용 과전류 계전기 설정치 정정에 대한 고찰)

  • Jang, Sung-Il;Kim, Ji-Won;Park, In-Ki;Kwon, Hyouk-Jun;Kim, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.137-140
    • /
    • 2002
  • This paper describes the effect of distributed generations (DG) on the bus protection scheme. When the generating capacity of DG is larger than 3 MVA totally, DG are generally connected to the 22.9 kV bus directly with the dedicated line. Due to the fault current contribution of DG, the overcurrent protective relay that have conventional set value cannot detect the fault occurred in distribution power network with DG. Therefore. the impacts from interconnection of DG on the overcurrent protective relay for bus protection should be accurately assessed and mitigated. Simulation results show that it would be necessary to modify the overcurrent protective relay set value for protecting the bus according to the generating capacity of DG.

  • PDF

Improved Properties of Li4Ti5O2 (LTO) by Surface Modification with Carbon Nanotube (CNT) (CNT 첨가를 통해 표면 처리한 LTO의 특성향상에 관한 연구)

  • Park, Soo-Gil;Kim, Cheong;Habazaki, Hiroki
    • Journal of the Korean institute of surface engineering
    • /
    • v.49 no.2
    • /
    • pp.191-195
    • /
    • 2016
  • Among the lithium metal oxides for hybrid-capacity, $Li_4Ti_5O_{12}(LTO)$ is an emerging electrode material as zero-stain material in volume change during the with the charging and discharging processes. However, LTO has a limitation of low ionic and electronic conductivity. To enhance the ionic and electronic properties of $Li_4Ti_5O_{12}(LTO)$, we synthesized the spherical LTO/CNT composite by sol-gel process for hybrid capacitors. CNT interconnection networks between CNT-LTO particles enhanced electronic conductivity and electrochemical charging/discharging properties. All of the LTO samples was observed to show the spinel structure and spherical morphology with the diameter of $5{\sim}10{\mu}m$. Especially, spherical LTO/CNT composite of the CNT-3 wt% showed the enhanced capacity from 110 mAh/g to 140 mAh/g at 10 C.

Power Control and Ground Fault Simulations for a Distribution System with a Fuel Cell Power Plant

  • Hwang, Jin-Kwon;Choi, Tae-Il
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.7
    • /
    • pp.9-19
    • /
    • 2010
  • Fuel cell (FC) distributed generation (DG) is gradually becoming more attractive to mainstream electricity users as capacity improves and costs decrease. New technologies including inverters are becoming available to provide a uniform standard interconnection of DGs with an electric power system. Some of the operating conflicts and the effect of DG on power quality are addressed and investigated through simulations on a real distribution network with an FC power plant. The results of these simulations have proved load tracking capability following the real and reactive power change of the load and have shown the flow of overcurrent from an FC power plant during the ground fault of a distribution line.

Optimal Operation Scheme of MicroGrid System based on Renewable Energy Resources (신재생 에너지원 기반의 마이크로그리드 최적운영 방안)

  • Rhee, Sang-Bong;Kim, Kyu-Ho;Lee, Sang-Geun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.8
    • /
    • pp.1467-1472
    • /
    • 2011
  • This paper presents an optimal operation of microgrid systems and considering a tie-lines capacities that concerned each grid. The microgrid system consists of a wind turbine, a diesel generator, and a fuel cell. An one day load profile and wind resource for wind turbine generator were used for the study. For the grid interconnection, tie-line capacities were applied as constraints. The capacity constraints of tie-lines in production cost analysis are very important issues in the operation and planning of microgrid. In optimization, the Harmony Search (HS) algorithm is used for solving the problem of microgrid system operation which a various generation resources are available to meet the customer load demand with minimum operating cost. The application of HS algorithm to optimal operation of microgrid proves its effectiveness to determine optimally the generating resources without any differences of load mismatch.

Development of the Base Station Transceiver Subsystem in the CDMA Mobile System

  • Lee, Dong-Wook;Yoo, Ki-Suk;Kim, Jin-Su;Kim, Myoung-Jin;Park, Jae-Hong
    • ETRI Journal
    • /
    • v.19 no.3
    • /
    • pp.116-140
    • /
    • 1997
  • The base station transceiver subsystem (BTS) of the CDMA Mobile System is interfaced to mobile stations over the air and to the wired network through a packet switched interconnection network. The potential benefits of CDMA technology are achieved when the transmitter and the receiver are properly designed and implemented. The physical layer of the interface at the base station is implemented with the CDMA ASICs and control circuits in channel card of the BTS. We present the design perspectives and structural illustration of the BTS. Base station modem ASICs and their control to implement the CDMA receiver, Baseband and RF signal processing blocks, and BTS controller are described. Elaborate power control is essential to ensure the high capacity which is one of advantages of the CDMA technology. The closed loop reverse link power control and the forward link power control operated in the BTS are described.

  • PDF

Balancing Inter-Ring Loads on SONET Dual-Ring without Demand Splitting

  • Lee, Chae-Y.;Moon, Jung-H.
    • IE interfaces
    • /
    • v.9 no.3
    • /
    • pp.64-71
    • /
    • 1996
  • In the survivability and simplicity aspect, SONET Self-healing Ring(SHR) is one of the most important schemes for the high-speed telecommunication networks. Since the ring capacity requirement is defined by the largest STS-1 cross-section in the ring, load balancing is the key issue in the design of SONET SHR. Recently, most of the research on load balancing problem have been concentrated on the SONET single-ring case. However, in certain applications, multiple-ring configuration is necessary because of the geographical limitations or the need for extra bandwidth. In this paper, the load balancing problem for SONET dual-ring is considered by assuming symmetric inter-ring demands. We present a linear programming based formulation of the problem. Initial solution and improvement procedures are presented, which solves the routing and interconnection between the two rings for each demand. Computational experiments are performed on various size of networks with randomly generated demand sets. Results show that the proposed algorithm is excellent in both the solution quality and the computational time requirement. The average error bound of the solutions obtained is 0.26% of the optimum.

  • PDF