• Title/Summary/Keyword: Interconnection capacity

Search Result 59, Processing Time 0.022 seconds

Precision Molding of Polymeric Multi-Channel Optical Interconnection Devices Considering the Coefficient of Thermal Expansion of the Materials

  • Ahn, Seung-Ho;Han, Sang-Pil;Choi, Choon-Gi;Jeong, Myung-Yung
    • ETRI Journal
    • /
    • 제25권4호
    • /
    • pp.266-269
    • /
    • 2003
  • Polymeric multi-channel optical interconnection devices that are usually fabricated by transfer molding are indispensable for parallel interconnection in high speed, high capacity optical communication systems. This paper proposes a design technique considering the thermal behavior of materials, such as shrinkage and expansion during the molding process, to satisfy geometrical requirements that have less than 1 ${\mu}m$ tolerance. We also designed molds considering the thermal effects of the materials and fabricated multi-channel optical fiber connectors that have less than 1 ${\mu}m$ tolerance.

  • PDF

투자요구에 따른 이동통신 시스템 설비 분류 (Facility Classification for Mobile Communications Systems based on Investment Requirements)

  • 장희선;한성수;임석구
    • 디지털콘텐츠학회 논문지
    • /
    • 제5권3호
    • /
    • pp.234-238
    • /
    • 2004
  • 이동통신 시스템 설비는 크게 이동가입자의 접속을 위한 커버리지(Coverage)와 트래픽 증가시 소요되는 추가 트래픽 이용(Usage) 장비로 나눌 수 있으며, 이 분류에 따라 유선사업자가 이동사업자에게 지불하게 되는 접속료의 규모가 결정된다. 본 논문에서는 국내 유선사업자와 이동통신 사업자간의 접속료 산정을 위한 사전 작업으로서 투자요구에 따른 이동통신 시스템 설비를 분류하기 위한 새로운 기준을 제시한다. 새로이 제시하는 분류 기준에서는 시스템 설비의 용량(Erlang, throughput)과 가입자 수요를 이용하여 설비별로 커버리지의 비율을 적용함으로서 사업자간 양보를 통한 상호 합의점을 도출할 수 있다.

  • PDF

해상풍력발전단지 간의 전력계통 연계에 관한 경제성 분석 연구 (Economic Evaluation of Power Grid Interconnection between Offshore Wind Power Plants)

  • 문원식;조아라;김재철
    • 전기학회논문지P
    • /
    • 제63권4호
    • /
    • pp.339-344
    • /
    • 2014
  • An offshore wind power plant (WPP) is very expensive and different from an onshore wind power system in many ways. There has been a continuous increase in the capacity of the offshore WPPs. Therefore it is essential to analyze the feasibility and reliability of the offshore wind power to optimize their redundancy. Besides, it is very important to study a planning for grid interconnection of adjacent offshore WPPs. This paper proposes a economic evaluation method to interconnect with adjacent offshore substations in offshore wind power grid. Also, we suggest the probabilistic reliability method to calculate a probabilistic power output of the wind turbine and a cost of the expected energy not supplied that is used as the reliability index of the power system.

배전선로의 분산 전원 상시 연계용량 기준 상향 타당성 연구 (Increasing Hosting Capacity in KEPCO Distribution Feeders)

  • 조성수;심준보;임현옥;김현진;김성만;주상도;송종협
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제5권4호
    • /
    • pp.311-321
    • /
    • 2019
  • 정부의 재생e 3020 이행계획 및 제 8차 전력수급 기본계획과 함께 국내 분산 전원 연계 사업이 활발하게 진행되고 있다. 특히 2016년 10월 시행된 1 MW이하의 분산 전원 접속 보장 제도의 시행 이후, 배전 계통의 분산 전원 연계 신청이 급증함에 따라 송배전 설비부족으로 분산 전원 접속 지연이 일어나는 문제와, 이로 인해 국내 분산 전원의 70 %가 연계되어 있는 배전 계통의 신증설 투자비가 증가하는 문제가 이슈로 부각되고 있다. 현재 배전 계통의 분산 전원 수용력(hosting capacity) 확보 방법은 물리적인 배전 설비 추가 확충 이외에는 대안이 없는 것이 현실인데, 이러한 방식은 아래와 같은 어려움이 따른다. 첫째, 분산 전원의 대다수를 차지하는 태양광은 일조량이 풍부하고 지가가 저렴한 야외, 산악지역에 보급되므로 배전선로 경과지 확보가 점점 어려워지고 있다. 이로 인해 지중 구간이 증가하여 공사비가 증가하며, 태양광 야외 지역 위치로 공사 거리, 기간이 증가하게 된다. 둘째, 지자체의 공사 인허가 비협조 사례가 증가하여 이로 인해 공사가 지연되어 민원이 야기된다. 셋째, 배전선로 공사 자체에 1년 이상의 공사기간이 소요되므로 분산 전원을 적기에 접속시킬 수가 없으며, 넷째, 접속 신청은 지속 증가하므로 이에 따라 배전 설비 확충 비용 또한 지속 증가 할 수 밖에 없다. 이렇게 물리적 설비확충으로 발생하는 문제에 대응하여 접속 대기를 최소화하면서도 공사(투자비)를 최소화 할 수 있는 방안은 설비이용률을 극대화하는 것이며, 본 연구는 이러한 고민에서 시작되었다. 그러므로 본 논문에서는 현재 배전 계통의 분산 전원 연계 현황, 태양광 최대 출력 실적, 최소 부하, 선로 특성의 분석을 통해 배전선로의 분산 전원 상시연계용량 기준을 상향하기 위한 타당성을 검토하였으며, 배전선로의 분산 전원 상시연계용량 기준을 위한 상향(안)을 제시하였다.

Analysis of Cell to Module Loss Factor for Shingled PV Module

  • Chowdhury, Sanchari;Cho, Eun-Chel;Cho, Younghyun;Kim, Youngkuk;Yi, Junsin
    • 신재생에너지
    • /
    • 제16권3호
    • /
    • pp.1-12
    • /
    • 2020
  • Shingled technology is the latest cell interconnection technology developed in the photovoltaic (PV) industry due to its reduced resistance loss, low-cost, and innovative electrically conductive adhesive (ECA). There are several advantages associated with shingled technology to develop cell to module (CTM) such as the module area enlargement, low processing temperature, and interconnection; these advantages further improves the energy yield capacity. This review paper provides valuable insight into CTM loss when cells are interconnected by shingled technology to form modules. The fill factor (FF) had improved, further reducing electrical power loss compared to the conventional module interconnection technology. The commercial PV module technology was mainly focused on different performance parameters; the module maximum power point (Pmpp), and module efficiency. The module was then subjected to anti-reflection (AR) coating and encapsulant material to absorb infrared (IR) and ultraviolet (UV) light, which can increase the overall efficiency of the shingled module by up to 24.4%. Module fabrication by shingled interconnection technology uses EGaIn paste; this enables further increases in output power under standard test conditions. Previous research has demonstrated that a total module output power of approximately 400 Wp may be achieved using shingled technology and CTM loss may be reduced to 0.03%, alongside the low cost of fabrication.

정전비용 고려한 PV시스템의 배전계통 연계 우선순위 결정에 관한 연구 (A Study on the Priority Decision for Interconnection of PV System on Power Distribution System considering Customer Interruption Costs)

  • 손창남;한운동;문종필
    • 전기학회논문지P
    • /
    • 제63권3호
    • /
    • pp.163-168
    • /
    • 2014
  • In this paper, when photovoltaic systems are connected to distribution system, most effective capacity and location of PV system are studied considering customer interruption costs of power distribution system. The reliability model of PV system considering the duration of sunshine, the model of time-varying load and Roy Billinton test system (bus2 model) are used. To simulate the effects of PV system, various cases are selected; (1) base case which is no connection of PV system to power distribution system when faults are occurred, (2) 3MW case which is 3[MW] connection of PV system (3) 4[MW] case, and (4) 20[MW] case which is 20[MW] connection of PV system to the bus of power distribution system. The capacity limit of connected PV system is settled to 14[MW] for all cases except case 4. The reliability and customer interruption costs for residential, general, industrial, and educational customer is evaluated.

Design of HTS power cable with fault current limiting function

  • Kim, Dongmin;Kim, Sungkyu;Cho, Jeonwook;Kim, Seokho
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제22권1호
    • /
    • pp.7-11
    • /
    • 2020
  • As demand for electricity in urban areas increases, it is necessary to improve electric power stability by interconnecting neighboring substations and high temperature superconductor (HTS) power cables are considered as a promising option due to its large power capacity. However, the interconnection of substations reduces grid impedance and expected fault current is over 45 kA, which exceeds the capacity of a circuit breaker in Korean grid. To reduce the fault current below 45 kA, a HTS power cable having a fault current limiting (FCL) function is considered by as a feasible solution for the interconnection of substations. In this study, a FCL HTS power cable of 600 MVA/154 kV, transmission level class, is considered to reduce the fault current from 63 kA to less than 45 kA by generating an impedance over 1 Ωwhen the fault current is induced. For the thermal design of FCL HTS power cable, a parametric study is conducted to meet a required temperature limit and impedance by modifying the cable core from usual HTS power cables which are designed to bypass the fault current through cable former. The analysis results give a minimum cable length and an area of stainless steel former to suppress the temperature of cable below a design limit.

부하불평형 및 부하모형을 고려한 복합배전계통의 분산형전원의 연계 방안 (Interconnection of Dispersed Generation Systems considering Load Unbalance and Load Model in Composite Distribution Systems)

  • 이유정;김규호;이상근;유석구
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권5호
    • /
    • pp.266-274
    • /
    • 2004
  • This paper presents a scheme for the interconnection of dispersed generator systems(DGs) based on load .unbalance and load model in composite distribution systems. Groups of each individual load model consist of residential, industrial, commercial, official and agricultural load. The unbalance is involved with many single-phase line segment. . Voltage profile improvement and system loss minimization by installation of DGs depend greatly on how they are placed and operated in the distribution systems. So, DGs can reduce distribution real power losses and replace large-scale generators if they are placed appropriately in the distribution systems. The main idea of solving fuzzy goal programming is to transform the original objective function and constraints into the equivalent multi-objectives functions with fuzzy sets to evaluate their imprecise nature for the criterion of power loss minimization, the number or total capacity of DGs and the bus voltage deviation, and then solve the problem using genetic algorithm. The method proposed is applied to IEEE 13 bus and 34 bus test systems to demonstrate its effectiveness.

동북아 에너지협력을 위한 전력계통 연구 : 러시아와의 전력계통 연계를 중심으로 (A Study on the Power Interconnection in the Northeast Asian Region)

  • 김현제;노동석;조성한
    • 자원ㆍ환경경제연구
    • /
    • 제17권3호
    • /
    • pp.167-199
    • /
    • 2008
  • 세계 각지에서 전력망 연계를 통한 전력부문의 협력과 전력시장의 통합이 추진되어 가시적인 성과를 거두고 있다. 동북아 지역은 상당한 경제적 편익이 기대됨에도 불구하고 역내 국가들의 다양한 이해관계와 현실적 제약요인 등으로 인해 전력협력의 성과가 제대로 나타나지 않고 있다. 미국 에너지부 산하의 아르곤연구소(Argonne National Laboratory)에서 개발한 발전 및 송전을 모의하는 프로그램인 GTMax를 통하여 러시아로부터 값 싼 전력이 국내에 수입되는 경우를 분석하였다. 러시아로부터의 수전량이 2,000MW(2017년의 국내 설비용량은 약 90,000MW 이상으로 2,000MW는 2%에 해당)일 경우 절대량이 미미하여 국내 전력시장에 미치는 영향이 거의 없다. 전력망 연계에 의해 큰 폭의 비용 절감을 도모하기 위해서는 수전량이 전체의 10% 수준이 될 정도로 커질 필요가 있음을 보여주고 있다. 또한 경인지역으로 직접 연계되는 것이 비용절감을 크게 하며, 영동지역과 연계되는 경우 영동-경인 간 선로용량의 증설이 불가능하다면 수전전력은 중부지역의 발전량을 대체하게 되어 수전의 상대적 이득이 감소하는 것으로 나타났다.

  • PDF

적응적 결함-허용 다단계 상호연결망 (Adaptive Fault-tolerant Multistage Interconnection Network)

  • 김금호;김영만;배은호;윤성대
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2001년도 하계종합학술대회 논문집(3)
    • /
    • pp.199-202
    • /
    • 2001
  • In this paper, we proposed and analyzed a new class of irregular fault-tolerant multistage interconnection network named as Extended-QT(Quad Tree) network. E-QT network is extended QT network. A unique path MIN usually is low hardware complexity and control algorithm. So we proposes a class of multipath MIN which are obtained by adding self-loop auxiliary links at the a1l stages in QT(Quad Tree) networks so that they can provide more paths between each source-destination pair. The routing of proposed structure is adaptived and is based by a routing tag. Starting with the routing tag for the minimum path between a given source-destination pair, routing algorithm uses a set of rules to select switches and modify routing tag. Trying the self-loop auxiliary link when both of the output links are unavailable. If the trying is failure, the packet discard. In simulation, an index of performance called reliability and cost are introduced to compare different kinds of MINs. As a result, the prouosed MINs have better capacity than 07 networks.

  • PDF