• Title/Summary/Keyword: Intelligent Scheduler

Search Result 28, Processing Time 0.03 seconds

Comprehensive Investigations on QUEST: a Novel QoS-Enhanced Stochastic Packet Scheduler for Intelligent LTE Routers

  • Paul, Suman;Pandit, Malay Kumar
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.12 no.2
    • /
    • pp.579-603
    • /
    • 2018
  • In this paper we propose a QoS-enhanced intelligent stochastic optimal fair real-time packet scheduler, QUEST, for 4G LTE traffic in routers. The objective of this research is to maximize the system QoS subject to the constraint that the processor utilization is kept nearly at 100 percent. The QUEST has following unique advantages. First, it solves the challenging problem of starvation for low priority process - buffered streaming video and TCP based; second, it solves the major bottleneck of the scheduler Earliest Deadline First's failure at heavy loads. Finally, QUEST offers the benefit of arbitrarily pre-programming the process utilization ratio.Three classes of multimedia 4G LTE QCI traffic, conversational voice, live streaming video, buffered streaming video and TCP based applications have been considered. We analyse two most important QoS metrics, packet loss rate (PLR) and mean waiting time. All claims are supported by discrete event and Monte Carlo simulations. The simulation results show that the QUEST scheduler outperforms current state-of-the-art benchmark schedulers. The proposed scheduler offers 37 percent improvement in PLR and 23 percent improvement in mean waiting time over the best competing current scheduler Accuracy-aware EDF.

hierarchical Control and Intelligent Scheduling of Flexible Manufacturing Cell (유연 생산셀의 계층적 제어와 지능형 스케쥴)

  • 서기성;이노성;안인석;박승규;우광방
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.43 no.3
    • /
    • pp.492-503
    • /
    • 1994
  • In this study, the control and scheduling of the flexible manufacturing cell (FMC) is discussed, which can perform the mixed production and relieve the effect of machine failure. The control of the FMC isvery complex task due to the property of multiple jobs and the dynamically changing states. For effective control of proposed FMC, the hierarchical scheme is introduced and the functions of each levels are defined. Especially for the control functions of shop floor level and cell level, the intelligent scheduler is implemented. To show the efficiency of the intelligent scheduler, the production method fo the existing assembly lines was evaluated and compared with the proposed intelligent FMC method. The results from the production performance show that the proposed method is superior to the existing method in various performance indices.

Blackboard Scheduler Control Knowledge for Recursive Heuristic Classification

  • Park, Young-Tack
    • Journal of Intelligence and Information Systems
    • /
    • v.1 no.1
    • /
    • pp.61-72
    • /
    • 1995
  • Dynamic and explicit ordering of strategies is a key process in modeling knowledge-level problem-solving behavior. This paper addressed the important problem of howl to make the scheduler more knowledge-intensive in a way that facilitates the acquisition, integration, and maintenance of the scheduler control knowledge. The solution a, pp.oach described in this paper involved formulating the scheduler task as a heuristic classification problem, and then implementing it as a classification expert system. By doing this, the wide spectrum of known methods of acquiring, refining, and maintaining the knowledge of a classification expert system are a, pp.icable to the scheduler control knowledge. One important innovation of this research is that of recursive heuristic classification : this paper demonstrates that it is possible to formulate and solve a key subcomponent of heuristic classification as heuristic classification problem. Another key innovation is the creation of a method of dynamic heuristic classification : the classification alternatives that are selected among are dynamically generated in real-time and then evidence is gathered for and aginst these alternatives. In contrast, the normal model of heuristic classification is that of structured selection between a set of preenumerated fixed alternatives.

  • PDF

Fuzzy Gain Scheduling of Velocity PI Controller with Intelligent Learning Algorithm for Reactor Control

  • Kim, Dong-Yun;Seong, Poong-Hyun
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.11a
    • /
    • pp.73-78
    • /
    • 1996
  • In this study, we proposed a fuzzy gain scheduler with intelligent learning algorithm for a reactor control. In the proposed algorithm, we used the gradient descent method to learn the rule bases of a fuzzy algorithm. These rule bases are learned toward minimizing an objective function, which is called a performance cost function. The objective of fuzzy gain scheduler with intelligent learning algorithm is the generation of adequate gains, which minimize the error of system. The condition of every plant is generally changed as time gose. That is, the initial gains obtained through the analysis of system are no longer suitable for the changed plant. And we need to set new gains, which minimize the error stemmed from changing the condition of a plant. In this paper, we applied this strategy for reactor control of nuclear power plant (NPP), and the results were compared with those of a simple PI controller, which has fixed gains. As a result, it was shown that the proposed algorithm was superior to the simple PI controller.

  • PDF

Machine Diagnosis and Maintenance Policy Generation Using Adaptive Decision Tree and Shortest Path Problem (적응형 의사결정 트리와 최단 경로법을 이용한 기계 진단 및 보전 정책 수립)

  • 백준걸
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.2
    • /
    • pp.33-49
    • /
    • 2002
  • CBM (Condition-Based Maintenance) has increasingly drawn attention in industry because of its many benefits. CBM Problem Is characterized as a state-dependent scheduling model that demands simultaneous maintenance actions, each for an attribute that influences on machine condition. This problem is very hard to solve within conventional Markov decision process framework. In this paper, we present an intelligent machine maintenance scheduler, for which a new incremental decision tree learning method as evolutionary system identification model and shortest path problem as schedule generation model are developed. Although our approach does not guarantee an optimal scheduling policy in mathematical viewpoint, we verified through simulation based experiment that the intelligent scheduler is capable of providing good scheduling policy that can be used in practice.

A Two-Level Hierarchical Expert System for Raw Material Scheduling (이단계 계층적 구조를 이용한 원료 운송 일정계획 전문가 시스템)

  • 서민수;고영관;김창현;최해운
    • Journal of Intelligence and Information Systems
    • /
    • v.2 no.1
    • /
    • pp.75-91
    • /
    • 1996
  • 제철소에서의 원료 운송 작업은, 선박에 선적된 원료를 하역하여 야드에 적치한 후, 제반 원료 소요공장까지의 벨트 컨베이어를 통한 원료 수송 작업을 의미한다. 본 연구에서는 원료 운송과 관련한 선박 접안, 원료 하역 및 벨트 컨베이어 수송 일정 계획을 효과적으로 수립하기 위하여 이단계 계획적 구조를 이용한 일정계획 휴리스틱을 개발하고 이를 구현하기 위한 전문가 시스템을 개발하였다. 이단계 계층적 구조는 상위 단계의 Scheduler 와 하위 단계의 복수개의 Dispatcher 로 구성되어 있다. 하위 단계의 Dispatcher는 주어진 제약조건하에서 단위 문제를 해결하고 이를 상위 단계의 Scheduler에게 보고하게 된다. 상위 단계의 Scheduler 는 전체적인 문제 해결의 우선 순위 결정 및 Dispatcher 간의 상층을 해결하는 역할을 맡게 된다. 이러한 계층적 구조를 이용한 분산처리를 통해 문제의 복잡성을 줄이고, 시스템 설계의 모듈화 및 유연성있는 시스템 구축이 가능하게 되었다. 본 시스템은 실시간 전문가 시스템 도구인 G2를 이용하여 SUN Workstation에서 개발되었다.

  • PDF

Modeling of Intelligent Avatar System (지능형 아바타 에이전트 시스템의 모델링)

  • Kim, Dae-Su
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.13 no.5
    • /
    • pp.558-563
    • /
    • 2003
  • Recently, many people are interested in the intelligent system that connects human and computers. And the studies on the intelligent agent system that can manage computer user s diverse requirements are now being accelerated. En this paper, we study the modeling of intelligent avatar system that can provide the user more convenient and user-friendly environments by adopting intelligent avatar agent, and it can be applied to various fields. Modeling of intelligent avatar agent is accomplished and part of it is experimentally implemented, and it showed successful results in the field of avatar agent, mail check functions, and scheduler.

An Enhanced Response Time Mechanism in Grid Systems

  • Lee, Seong-Hoon
    • International Journal of Contents
    • /
    • v.6 no.2
    • /
    • pp.10-13
    • /
    • 2010
  • For applications that are grid enabled, the grid can offer a resource balancing effect by scheduling grid jobs on machines with low utilization. When jobs communicate with each other, the internet, or with storage resources, an advanced scheduler could schedule them to minimize communications traffic or minimize the distance of the communications. We propose an intelligent load distribution algorithm to minimize communications traffic and distance of the communications using genetic algorithm. The experiments show the proposed load redistribution algorithm performs efficiently in the variance of load in grid environments.

Design of the intelligent control-based job scheduler (지능형 제어기법에 의한 생산 계획 설계)

  • 이창훈;서기성;정현호;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1989.10a
    • /
    • pp.286-289
    • /
    • 1989
  • The purpose of this paper is to design a job scheduling algorithm utilizing intelligent control technique. Rulebase is built through the evaluation of rule-set scheduling. 24 scheduling rule-sets and meta-rules are employed. An appropriate scheduling rule-set is selected based on this rulebase and current manufacturing system status. Six criteria have been used to evaluate the performance of scheduling. The performance of sheduling is dependent on random breakdown of the major FMS components during simulation.

  • PDF

A Novel Method of Improving Cache Hit-rate in Hadoop MapReduce using SSD Cache

  • Kim, Jong-Chan;An, Jae-Hoon;Kim, Young-Hwan;Jeon, Ki-Man
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.8
    • /
    • pp.1-6
    • /
    • 2015
  • The MapReduce Program of Hadoop Distributed File System operates on any unspecified nodes due to distributed-parallel process and block replicate for data stability. Since it is difficult to guarantee the cache locality when a Solid State Drive is used as a cache in hadoop, cache hit-rate is decreased. In this paper, we suggest a method to improve cache hit rate by pre-loading the input data of the MapReduce onto the SSD cache. To perform this method, we estimated the blocks that are used on each node by using capacity scheduler and block metadata. Eventually we could increase the performance of SSD cache by loading the blocks onto SSD cache before the Map Task run.