• Title/Summary/Keyword: Integration power system

Search Result 536, Processing Time 0.052 seconds

Electrical Technologies for Grid Integration of Ocean Wave Power into the UK National Grid

  • Ahmed, Tarek
    • Journal of Power Electronics
    • /
    • v.10 no.3
    • /
    • pp.320-327
    • /
    • 2010
  • In this paper, multiple offshore wave energy converters with different output characteristics are connected to one power distribution substation. The connection between the power take-off of the different wave energy converters and the electrical power transmission system is presented in order to investigate whether multiple wave energy converters can augment energy yield and improve network integration capabilities. Moreover, the model of an array of wave energy converters is developed with the goal of analyzing the effects of the offshore wave farm on the electrical network to which it is connected. It is also developed to ensure that the electricity generated by the array is sufficiently controllable, and of a quality that can be integrate into the electricity supply network without unduly increasing the cost of connection, production or delivery.

Configuration and Construction for the KASS KRS Site Infrastructure

  • Jang, HyunJin;Jeong, Hwanho;Son, Minhyuk;Lee, ByungSeok
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.10 no.2
    • /
    • pp.139-144
    • /
    • 2021
  • In this paper, we described configuration and construction of infrastructure for the KASS Reference Station (KRS), subsystem of Korea Augmentation Satellite System (KASS). KASS system consists of three subsystems(KRS, Mission Control Center (MCC), KASS Uplink Station (KUS)). One of these subsystems, KRS receives GNSS data for generating range error and integrity verification and sends to MCC. It is needed to antenna facilities for mounting GNSS antenna and shelter for operating KRS and infra equipment(power and network system, lightning and grounding system, fire extinguish) for operating KRS. For this reason, we have established the requirements for KRS infrastructure and constructed infrastructure for KRS to meet the requirements of KRS infrastructure.

A Matlab/Simulink-Based PV array-Supercapacitor Model Employing SimPowerSystem and Stateflow Tool Box

  • Hong, Won-Pyo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.12
    • /
    • pp.18-29
    • /
    • 2014
  • This paper proposes the integration of photovoltaic (PV) and energy storage systems for sustained power generation. In this proposed system, whenever the PV system cannot completely meet load demands, the super capacitor provides power to meet the remaining load. A power management strategy is designed for the proposed system to manage power flows between PV array systems and supercapacitors (SC). The main task of this study was to design PV systems with storage strategies including MPPT with direct control and an advanced DC-link controller and to analyze dynamic model proposed for a PV-SC hybrid power generation system. In this paper, the simulation models for the hybrid energy system are developed using Matlab/Simulink, SimPowerSystems and Matlab/Stateflow tool. This is the key innovative contribution of the research paper. The system performances are verified by carrying out simulation studies using practical load demand profile and real weather data.

The Development of an Operating System for Load-following Real-time Transformer Loss Minimization and Economic Analyses on its' Test Operation (부하 추종형 실시간 변압기 손실감소운전시스템 개발과 시범운영 경제성 분석)

  • Lee, Ok-Bae;Ahn, Jae-Kyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.6
    • /
    • pp.797-803
    • /
    • 2012
  • In this paper, for minimizing the real-time operating load losses of the power transformer, a SCADA optimum operating system was developed, and the economic analyses on the test operation were performed. Transformer loss DB which reflects the economic integration operation criteria was constructed by referring the transformer manufacturer's loss data(iron loss, copper loss). Based on the loss DB, each substation transformer real-time loss was calculated according to the size of the transformer loads, and if integration or separation transformer operating conditions minimizing the loss are met, then a window pops-up and the dispatcher performs the substation equipments operation according to the procedure provided by this system. With the existing SCADA main program, the relation database of the substation facilities and integration/separation operation algorithm were developed and applied to Auto MTR Processor and pconn Processor Task module. Seven stations test data for seven months were analyzed for the economic analyses, and the results showed that Cost-Benefit ratio was 2.64, and IRR(Internal Rate of Return), 36%, which asserted the economic justification of the proposed system.

Analytical and sensitivity approaches for the sizing and placement of single DG in radial system

  • Bindumol, E.K.;Babu, C.A.
    • Advances in Energy Research
    • /
    • v.4 no.2
    • /
    • pp.163-176
    • /
    • 2016
  • Rapid depletion of fossil based oil, coal and gas reserves and its greater demand day by day necessitates the search for other alternatives. Severe environmental impacts caused by the fossil fire based power plants and the escalating fuel costs are the major challenges faced by the electricity supply industry. Integration of Distributed Generators (DG) especially, wind and solar systems to the grid has been steadily increasing due to the concern of clean environment. This paper focuses on a new simple and fast load flow algorithm named Backward Forward Sweep Algorithm (BFSA) for finding the voltage profile and power losses with the integration of various sizes of DG at different locations. Genetic Algorithm (GA) based BFSA is adopted in finding the optimal location and sizing of DG to attain an improved voltage profile and considerable reduced power loss. Simulation results show that the proposed algorithm is more efficient in finding the optimal location and sizing of DG in 15-bus radial distribution system (RDS).The authenticity of the placement of optimized DG is assured with other DG placement techniques.

Through Silicon Stack (TSS) Assembly for Wide IO Memory to Logic Devices Integration and Its Signal Integrity Challenges

  • Shin, Jaemin;Kim, Dong Wook
    • The Proceeding of the Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.24 no.2
    • /
    • pp.51-57
    • /
    • 2013
  • The current expanding mobile markets incessantly demands small form factor, low power consumption and high aggregate throughput for silicon-level integration such as memory to logic system. One of emerging solution for meeting this high market demand is 3D through silicon stacking (TSS) technology. Main challenges to bring 3D TSS technology to the volume production level are establishing a cost effective supply chain and building a reliable manufacturing processes. In addition, this technology inherently help increase number of IOs and shorten interconnect length. With those benefits, however, potential signal and power integrity risks are also elevated; increase in PDN inductance, channel loss on substrate, crosstalk and parasitic capacitance. This paper will report recent progress of wide IO memory to high count TSV logic device assembly development work. 28 nm node TSV test vehicles were fabricated by the foundry and assembled. Successful integration of memory wide IO chip with less than a millimeter package thickness form factor was achieved. For this successful integration, we discussed potential signal and power integrity challenges. This report demonstrated functional wide IO memory to 28 nm logic device assembly using 3D package architecture with such a thin form factor.

A Probabilistic Analysis for Profit Maximization in a Microgrid Including Wind Power (풍력을 포함한 마이크로그리드의 이윤극대 급전계획 연구)

  • Jo, Byuk-Keun;Han, Jong-Hoon;Jang, Gil-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.270-271
    • /
    • 2011
  • Due to integration of wind power, its unpredictable uncertainty can be a very lethal factor in generation dispatch problem. To handle such uncertainty of wind power output, a profit maximization problem is formulated and random wind speed is modeled by Weibull distribution in this paper. A case study is calculated through profit maximization approach with random wind speed. The effect of case study results is evaluated on how the uncertain wind power integration into the power system affects on the generation dispatch.

  • PDF

A Study on Processor Monitoring for Integration Test of Flight Control Computer equipped with A Modern Processor (최신 프로세서 탑재 비행제어 컴퓨터의 통합시험을 위한 프로세서 모니터링 연구)

  • Lee, Cheol;Kim, Jae-Cheol;Cho, In-Jae
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.14 no.10
    • /
    • pp.1081-1087
    • /
    • 2008
  • This paper describes limitations and solutions of the existing processor-monitoring concept for a military supersonics aircraft Flight Control Computer (FLCC) equipped with modern architecture processor to perform the system integration test. Safecritical FLCC integration test, which requires automatic test for thousands of test cases and real-time input/output test condition generation, depends on the processor-monitoring device called Processor Interface (PI). The PI, which relies upon on the FLCC processor's external address and data-bus data, has some limitations due to multi-fetching capability of the modern sophisticated military processors, like C6000's VLIW (Very-Long Instruction Word) architecture and PowerPC's Superscalar architecture. Several techniques for limitations were developed and proper monitoring approach was presented for modem processor-adopted FLCC system integration test.

A Case Study of Post-Merger IT Integration Methodology on Cross-Border Mergers and Acquisitions (해외기업 인수합병 시 정보시스템 통합 방법론에 관한 사례연구)

  • Suh, Byung-Wan;Baek, Seung-Ik
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.67-81
    • /
    • 2011
  • Recently, Mergers and Acquisitions (M&A) have become increasingly popular in the last few decades, and overseas' M&A are particularly increasing to sharpen corporate competitiveness on a global scale. Previous studies showed that one of the main reasons attributes to failures of mergers was the lack of attention to merging information systems. In recent years, both academy and industry have more focused on Post-Merger Integration (PMI) and the integration of information systems (IS) between two companies is one of the critical success factors of corporate. This paper focused on Post-Merger IT (Information Technology) Integration Methodology of Cross-Border M&A. We followed a single-site qualitative case study method in order to investigate the type of phenomenon in M&A's natural setting. Moreover, we examined a typical energy and power company case in order-based industry, so that other industry players may have different results to determine post-merger IT integration method and scope.

A Method to Select Humane-System Interfaces for Nuclear Power Plants

  • Hugo, Jacques V.;Gertman, David I.
    • Nuclear Engineering and Technology
    • /
    • v.48 no.1
    • /
    • pp.87-97
    • /
    • 2016
  • The new generation of nuclear power plants (NPPs) will likely make use of state-of-the-art technologies in many areas of the plant. The analysis, design, and selection of advanced human-system interfaces (HSIs) constitute an important part of power plant engineering. Designers need to consider the new capabilities afforded by these technologies in the context of current regulations and new operational concepts, which is why they need a more rigorous method by which to plan the introduction of advanced HSIs in NPP work areas. Much of current human factors research stops at the user interface and fails to provide a definitive process for integration of end user devices with instrumentation and control and operational concepts. The current lack of a clear definition of HSI technology, including the process for integration, makes characterization and implementation of new and advanced HSIs difficult. This paper describes how new design concepts in the nuclear industry can be analyzed and how HSI technologies associated with new industrial processes might be considered. It also describes a basis for an understanding of human as well as technology characteristics that could be incorporated into a prioritization scheme for technology selection and deployment plans.