• Title/Summary/Keyword: Integrated Program Management System

Search Result 260, Processing Time 0.023 seconds

Prototype Development of Integrated Management System for National R&D Program (국가연구개발사업 종합관리시스템 프로토타입의 개발)

  • 임창주;오세홍
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.69
    • /
    • pp.93-106
    • /
    • 2001
  • This research includes the prototype development of the master plan title. "National Research and Development Program Integrated Management System". The system collects the information of projects, supports the survey analysis evaluation, and pre budget coordination of national research and development programs, and provide the information service for people about the situation of the national research and development. The results of the research may be used as the base technologies in information service(information retrieval directory service) to manage all programs of national research and development in their life cycle and to allocate resources efficiently to the national research and development in the increasing tendency. tendency.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF

The Development of Exhibition Grounds Management System Using the Ubiquitous Computing (Ubiquitous Computing을 이용한 전시회장 관리 시스템 개발)

  • Sim, Gab-Sig;Jang, Jae-Hyuk
    • Journal of the Korea Society of Computer and Information
    • /
    • v.13 no.7
    • /
    • pp.149-156
    • /
    • 2008
  • In this paper, we develope the Exhibition Grounds Management System utilizing the ubiquitous computing which integrates the RFID ubiquitous main technology, existing use technology Bar-code, the Mobile communication technology for IT main technology field. The developed system consists of the program for exhibition information. the visitor registration program, manager program and mobile program for the visitor's current location inquiry and the exhibition management. This system is realized and designed based on database, web program, mobile program, wireless telecommunication technology. The automation technology utilizing the developed RFID system and the Exhibition Grounds Management System integrated with the wireless packet telecommunication using the mobile telecommunication technology could have a ripple effect on whole information industrial application fields.

  • PDF

Spatial Data Update Method for Efficient Operation of the Integrated Underground Geospatial Map Management System (지하공간통합지도 관리 시스템의 효율적인 운영을 위한 공간 데이터 갱신 방법)

  • Lee, Bong-Jun;Kouh, Hoon-Joon
    • Journal of Industrial Convergence
    • /
    • v.20 no.7
    • /
    • pp.57-64
    • /
    • 2022
  • There are various structures in the underground space, and the structures is managed as 3D data in Integrated Underground Geospatial Map Management System(IUGMMS). The worker transmits and updates the integrated map including the changed underground geospatial data to IUGMMS with the completed book submission program. However, there is a problem in that the transmission time and the update time is delayed because the size of the integrated map file is large. In this paper, we try to extract and transmit only the changed integrated map by obtaining and comparing each spatial characteristic information of the integrated map. As a result of the experiment, the transmission time of the suggestion method is short and the update time is also short than the transitional method because the suggestion method transmits only the integrated map including the changed underground geospatial data. As a result, it was possible to reduce the delay time in transmitting and updating the changed integrated map.

A Systems Engineering Case Study to Improve Defence R&D Program Effectiveness (국방 R&D사업 시스템엔지니어링 적용사례 및 발전방안 연구 - 저고도레이더 업체주관 연구개발사업 사례 중심으로 -)

  • Park, Kyeong-Il;Pyun, Wan-Joo;Park, Young-Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.35-43
    • /
    • 2008
  • Application of system engineering should be realized on necessary condition being to propel National Defense R&D Program. But, these necessity is yet not realized easily to many project managers of Defense Acquisition Program Administration(DAPA). As one person of DAPA project manager, system engineering hard to approaches easily by the word itself. There are a lot of difficult sections where should apply how. This paper established DAPA Project Manager and Acquisition Point of Contact of demand Military by main customer (reader), and wished to make understood more easily and approach system engineering application to these. Also, this paper studied project management example that scientific project management techniques of Earned Value Management(EVM) and Cost As an Independent Variable(CAIV) etc. is taken abuzz in DAPA inside by Project management technique that become reform, arc Integrated in system engineering.

  • PDF

Six Sigma and the Cost of(Poor) Quality

  • Aca;U, Jichao-X
    • International Journal of Quality Innovation
    • /
    • v.3 no.2
    • /
    • pp.159-173
    • /
    • 2002
  • Any organization's Six Sigma program may be at high risk without heeding the lessons learned from the past and that tries to operate without a robust business foundation. A foundation that preferably should consist of stepping-stones such as a 5-S house-keeping program, an effective Integrated Management System (IMS), which includes a strong focus on planning for quality to fully capture the Voice of the Customer (VOC), and an organization-wide training scheme, as well as a reliable Cost of Poor Quality (COPQ) system. That's the best advise I can give to any organization that wishes to embark on a Six Sigma improvement program and hope to be successful. The paper will elaborate on the above issues and provide suggested solutions based on the review of published historical information and the experiences encountered over the last four decades by the author, as a quality practitioner and consultant, in industries that produced safety-critical product. This author maintains that few fundamentally new or useful things have been created in the field of Quality during the last couple of decades. Nevertheless, this paper deliberates on a number of relatively “newer” issues including the concept of “three types of customers”, the CTC, “Critical To Customer” term, the eight Quality Management Principles of the new ISO 9000 family, the growth of industry-specific standards, the adoption of Integrated Management Systems, the rebirth of AS2561 COQ standard, the spread of Six Sigma as well as related ASQ certification and the need for a robust business foundation to ensure Six Sigma survival.

A Study on the Critical Success Factors for the Efficient Management of Defense Acquisition Program (효율적인 무기체계 획득을 위한 사업 관리 핵심성공요인 연구)

  • Jeon, Nam-Hee;Kim, Byung-Sam;Kim, Dong-Ho;Gim, Gwang-Yong
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.2
    • /
    • pp.53-69
    • /
    • 2010
  • The long-term purpose of Military Acquisition Program Management (MAPM) is to fulfill requested performance, budget, and timing of military capability building. The Defense Acquisition Program Administration was established in 2006 and it adopted Integrated Control System. Moreover, there have no much studies done to examine the condition of Defense Capability Improvement Project in Korea through an empirical research although there are sixty one organizations are operating currently under Defense Capability Improvement Project. The objective of this study is to recognize Military Acquisition Program Management as a single project and to critically review relationship between Critical Success Factors (CSF) and Military Acquisition Program Management. Accordingly, three determinants to lead to successful Military Acquisition Program Management are "Communication" "User Participation" and "User Requirement." This study also demonstrates that Critical Success Factors have distinctive influences on successful Military Acquisition Program Management based on characteristic, size and phase of project. In retrospect, it is meaningful that Integrated Project Team (IPT) could classify priority of management according to characteristic, size and phase of project in the course of implementation.

A Curriculum Development on the Disaster Management (재해관리에 대한 교육과정 개발)

  • 강윤숙;이옥철;이계복
    • Journal of Korean Academy of Nursing
    • /
    • v.28 no.1
    • /
    • pp.210-220
    • /
    • 1998
  • The various and serious types of disaster occur everyday and everywhere on the earth. There is no doubt that it is very timely to discuss about the effectiveness and preparedness of disaster. The purpose of this study is to develop a curriculum on the disaster management through reviewing disaster concepts and the disaster management system. For the empirical relevance of the study, researchers participated in a couple or more disaster training program, reviewed references, and consulted to the experts working on action parts in the area. As a result, the 'Integrated Disaster Management System Model (IDMSM)' was designed, in which four dimensions were explained. Then the 'Disaster Curriculum Model (DCM)' was explored with its theoretical framework based on the system model. The developed curriculum is composed of four levels ; the introductory course, the fundamental course, the advanced course, and the expert course. From this DCM, basically the course-outlines of two subjects in the introductory course, 18 subjects in the fundamental course (5 of direct services. 13 of indirect services) were developed. Also each course-outline was explored by its course objective, learning objectives, contents, and its length. Finally to make the most of the results, suggestions are proposed. The governmental considerations on the policy should support the systematic and integrated educational program to practice, appointing 「Disaster School」 or 「Disaster Training Center」 of relevance and accountabilities. The further study should explore the higher levels of the DCM through interdisciplinary efforts, and develop the text aterials. ilities. The further study should explore the higher levels of the DCM through interdisciplinary efforts, and develop the text materials.

  • PDF

A Study on the Combination of the Existing Monitoring System with the Safety Management Network System (기구축 계측시스템의 안전관리 네트워크 시스템 연계 방안에 관한 연구)

  • Lee, Chin-Hyung;Park, Ki-Tae;You, Young-Jun;Joo, Bong-Chul;Hwang, Yoon-Koog;Bae, In-Hwan
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.3
    • /
    • pp.47-53
    • /
    • 2009
  • This study performed the construction of test bed for the combination of the health monitoring system In Yongjong grand bridge with the safety management network system in order to explore the feasibility of combining the existing monitoring system with the safety management network system. For this purpose, connection program which consists of DAQ sender server program and DAQ receiver server program has been developed. DAQ sender server program installed in the connection server, which is located on the DMZ zone of the existing monitoring system, plays the role of communicating with the monitoring system. On the other hand, DAQ receiver server program installed in the connection server, which is located on the integrated operation center of the safety management network system, plays the part of gathering real time and tim history data of the existing monitoring system and storing them in the integrated operation server through the communication with the DAQ sender. Test bed demonstrated the feasibility of combining the existing monitoring system with the safety management network system.

  • PDF

A Study on a Real Time Freight Delivery Planning for Supply Center based on GIS (GIS기반의 실시간 통합화물운송시스템 계획에 관한 연구)

  • 황흥석;김호균;조규성
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.75-89
    • /
    • 2002
  • According to the fast-paced environment of information technology and improving customer services, the design activities of logistics systems improve customer centric services and delivery performance implementing e-logistics system. The fundamental design issues that arise in the delivery system planning are optimizing the system with minimum cost and maximum throughput and service level. This study is concerned with the integrated model development of delivery system with customer responsive service level for DCM, Demand Chain Management. We used a two-step approach for this study. First, we formulated the supply. center facility planning using stochastic set-covering problem and assigned the customers to the supply center using clustering algorithm. Second, we developed vehicle delivery planning for a supply center based on GIS, GIS-VRP. Also we developed a GUI-type computer program for proposed method for supply center problem using GIS and Geo-DataBase of Busan area. The computational results showed that the proposed method was very effective on a set of test problems.