• 제목/요약/키워드: Integrated Program Management System

검색결과 260건 처리시간 0.033초

국가연구개발사업 종합관리시스템 프로토타입의 개발 (Prototype Development of Integrated Management System for National R&D Program)

  • 임창주;오세홍
    • 산업경영시스템학회지
    • /
    • 제24권69호
    • /
    • pp.93-106
    • /
    • 2001
  • This research includes the prototype development of the master plan title. "National Research and Development Program Integrated Management System". The system collects the information of projects, supports the survey analysis evaluation, and pre budget coordination of national research and development programs, and provide the information service for people about the situation of the national research and development. The results of the research may be used as the base technologies in information service(information retrieval directory service) to manage all programs of national research and development in their life cycle and to allocate resources efficiently to the national research and development in the increasing tendency. tendency.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF

Ubiquitous Computing을 이용한 전시회장 관리 시스템 개발 (The Development of Exhibition Grounds Management System Using the Ubiquitous Computing)

  • 심갑식;장재혁
    • 한국컴퓨터정보학회논문지
    • /
    • 제13권7호
    • /
    • pp.149-156
    • /
    • 2008
  • 본 논문에서는 유비쿼터스의 핵심 기술인 RFID와 기존의 사용 기술인 바코든 그리고 IT의 중요 기술 분야인 모바일 통신 기술을 통합한 유비쿼터스 컴퓨팅을 이용한 전시회장 관리 시스템을 개발하였다. 개발된 시스템은 전시 정보관리 프로그램, 관람객 등록 프로그램, 관리자 프로그램, 그리고 관람객 현재 위치 조회와 전시회장 관리를 위한 모바일 프로그램 등으로 구성되었다. 본 시스템은 데이터베이스, 웹 프로그램, 모바일 프로그램, 무선 통신기술을 기반으로 설계 및 구현하였다. 본 논문에서 개발한 RFID 시스템을 이용한 자동화 기술과 모바일 통신 기술을 활용한 무선 패킷 통신이 통합된 전시회장 관리 시스템은 정보 산업 응용 영역 전반에 걸친 기술 파급 효과를 가져 올 수 있을 것이다.

  • PDF

지하공간통합지도 관리 시스템의 효율적인 운영을 위한 공간 데이터 갱신 방법 (Spatial Data Update Method for Efficient Operation of the Integrated Underground Geospatial Map Management System)

  • 이봉준;고훈준
    • 산업융합연구
    • /
    • 제20권7호
    • /
    • pp.57-64
    • /
    • 2022
  • 지하공간에는 다양한 구조물들이 있고 그 구조물들의 지하공간 데이터는 지하공간통합지도 관리 시스템(IUGMMS)에서 3D 데이터로 관리되고 있다. 작업자는 준공도서 제출 프로그램으로 변경된 지하공간 데이터를 반영한 통합지도 전체를 IUGMMS에 전송하여 갱신하고 있다. 그러나 통합지도 파일의 크기가 크기 때문에 전송하고 갱신하는 시간이 지연되는 문제점이 있다. 본 논문에서는 변경된 통합지도와 IUGMMS에 저장되어 있는 통합지도에서 공간특성정보를 각각 구하고 비교해서 변경된 지하정보 데이터가 있는 통합지도만 추출하여 전송하고자 한다. 실험 결과, 기존 방법은 전송하려는 통합지도의 영역이 넓을수록 통합지도를 전송하는 시간과 갱신하는 시간이 파일 크기에 비례하여 증가하였지만, 제안한 방법은 변경된 지하공간 데이터가 포함된 통합지도만 전송하기 때문에 전송 시간이 짧았고 갱신하는 시간도 짧았다. 그 결과 변경된 통합지도를 전송하고 갱신할 때 발생하는 시간의 지연을 줄일 수 있었다.

국방 R&D사업 시스템엔지니어링 적용사례 및 발전방안 연구 - 저고도레이더 업체주관 연구개발사업 사례 중심으로 - (A Systems Engineering Case Study to Improve Defence R&D Program Effectiveness)

  • 박경일;편완주;박영원
    • 시스템엔지니어링학술지
    • /
    • 제4권2호
    • /
    • pp.35-43
    • /
    • 2008
  • Application of system engineering should be realized on necessary condition being to propel National Defense R&D Program. But, these necessity is yet not realized easily to many project managers of Defense Acquisition Program Administration(DAPA). As one person of DAPA project manager, system engineering hard to approaches easily by the word itself. There are a lot of difficult sections where should apply how. This paper established DAPA Project Manager and Acquisition Point of Contact of demand Military by main customer (reader), and wished to make understood more easily and approach system engineering application to these. Also, this paper studied project management example that scientific project management techniques of Earned Value Management(EVM) and Cost As an Independent Variable(CAIV) etc. is taken abuzz in DAPA inside by Project management technique that become reform, arc Integrated in system engineering.

  • PDF

Six Sigma and the Cost of(Poor) Quality

  • Aca;U, Jichao-X
    • International Journal of Quality Innovation
    • /
    • 제3권2호
    • /
    • pp.159-173
    • /
    • 2002
  • Any organization's Six Sigma program may be at high risk without heeding the lessons learned from the past and that tries to operate without a robust business foundation. A foundation that preferably should consist of stepping-stones such as a 5-S house-keeping program, an effective Integrated Management System (IMS), which includes a strong focus on planning for quality to fully capture the Voice of the Customer (VOC), and an organization-wide training scheme, as well as a reliable Cost of Poor Quality (COPQ) system. That's the best advise I can give to any organization that wishes to embark on a Six Sigma improvement program and hope to be successful. The paper will elaborate on the above issues and provide suggested solutions based on the review of published historical information and the experiences encountered over the last four decades by the author, as a quality practitioner and consultant, in industries that produced safety-critical product. This author maintains that few fundamentally new or useful things have been created in the field of Quality during the last couple of decades. Nevertheless, this paper deliberates on a number of relatively “newer” issues including the concept of “three types of customers”, the CTC, “Critical To Customer” term, the eight Quality Management Principles of the new ISO 9000 family, the growth of industry-specific standards, the adoption of Integrated Management Systems, the rebirth of AS2561 COQ standard, the spread of Six Sigma as well as related ASQ certification and the need for a robust business foundation to ensure Six Sigma survival.

효율적인 무기체계 획득을 위한 사업 관리 핵심성공요인 연구 (A Study on the Critical Success Factors for the Efficient Management of Defense Acquisition Program)

  • 전남희;김병삼;김동호;김광용
    • 한국국방경영분석학회지
    • /
    • 제36권2호
    • /
    • pp.53-69
    • /
    • 2010
  • 국방무기체계획득사업 관리의 목적은 궁극적으로 요구된 성능, 예산, 전력화시기를 충족시키는 것이다. 2006년 출범한 방위사업청은 무기체계 획득사업을 효율적으로 수행하기 위해서 통합사업관리제를 도입하여, 방위력개선사업 관리를 위한 프로젝트 조직이 61개가 운영 중에 있다. 하지만 한국적인 국방획득환경에서의 프로젝트 관리 측면에서 실증적인 분석연구가 미흡한 것이 현실이다. 따라서 본 연구는 무기체계획득사업관리를 하나의 프로젝트로 인식하고, 프로젝트관리 연구에서 제시된 프로젝트 성공요인(CSF : Critical Success Factors)과 무기체계획득사업관리의 관계에 대해서 알아보았다. 연구 결과 전체적으로는 의사소통, 사용자 참여, 명확한 요구사항 변수가 프로젝트 성공에 영향을 주는 것으로 분석되었다. CSF 요소는 사업추진단계별, 사업의 특성, 규모에 따라서 프로젝트 성공에 미치는 영향이 각각 다르다는 것을 실증적으로 증명하였다. 이번 연구 결과를 통해서 통합사업관리팀이 무기체계획득사업 수행 시 사업 단계, 특성, 규모에 따라서 중점 관리 분야를 식별한 것이 이 논문의 의의라고 생각한다.

재해관리에 대한 교육과정 개발 (A Curriculum Development on the Disaster Management)

  • 강윤숙;이옥철;이계복
    • 대한간호학회지
    • /
    • 제28권1호
    • /
    • pp.210-220
    • /
    • 1998
  • The various and serious types of disaster occur everyday and everywhere on the earth. There is no doubt that it is very timely to discuss about the effectiveness and preparedness of disaster. The purpose of this study is to develop a curriculum on the disaster management through reviewing disaster concepts and the disaster management system. For the empirical relevance of the study, researchers participated in a couple or more disaster training program, reviewed references, and consulted to the experts working on action parts in the area. As a result, the 'Integrated Disaster Management System Model (IDMSM)' was designed, in which four dimensions were explained. Then the 'Disaster Curriculum Model (DCM)' was explored with its theoretical framework based on the system model. The developed curriculum is composed of four levels ; the introductory course, the fundamental course, the advanced course, and the expert course. From this DCM, basically the course-outlines of two subjects in the introductory course, 18 subjects in the fundamental course (5 of direct services. 13 of indirect services) were developed. Also each course-outline was explored by its course objective, learning objectives, contents, and its length. Finally to make the most of the results, suggestions are proposed. The governmental considerations on the policy should support the systematic and integrated educational program to practice, appointing 「Disaster School」 or 「Disaster Training Center」 of relevance and accountabilities. The further study should explore the higher levels of the DCM through interdisciplinary efforts, and develop the text aterials. ilities. The further study should explore the higher levels of the DCM through interdisciplinary efforts, and develop the text materials.

  • PDF

기구축 계측시스템의 안전관리 네트워크 시스템 연계 방안에 관한 연구 (A Study on the Combination of the Existing Monitoring System with the Safety Management Network System)

  • 이진형;박기태;유영준;주봉철;황윤국;배인환
    • 한국재난관리표준학회지
    • /
    • 제2권3호
    • /
    • pp.47-53
    • /
    • 2009
  • 본 연구에서는 기구축 계측시스템의 안전관리 네트워크 시스템(국토해양부, 2008) 연계 가능성을 타진하기 위해서 신공항하이웨이(주) 관할 현수교인 영종대교 계측시스템의 안전관리 네트워크 시스템 연계 시범구축을 실시하였다. 기구축 계측시스템 데이터 연계를 위하여 DAQ Sender 서버 프로그램과 DAQ Receiver 서버 프로그램으로 구성되는 연계 프로그램을 개발하였다. DAQ Sender 서버 프로그램은 기구축 계측시스템 전산센터 내 중립지역 (DMZ ZONE)de미리 설치 서버계서버설치되운영되는 프로그램으로 기구축 계측시스템과의 통신을 담당한다. DAQ Receiver 서버 프로그램은 안전 관리 네트워크 시스템 통합운영 센터 내 연계서버에 설치되어 운영되는 프로그램으로 DAQ Sender와 통신을 통해 실시 간 및 기간이력 데이터를 수집하고 이를 통합운영 서버에 저장하는 역할을 수행한다. 본 시범구축 결과 기구축 계측시스템으로부터 연계항목을 구성하고 실시간 및 기간이력 데이터를 성공적으로 연계 할 수 있었다. 따라서 향후 각 기구축 계측시스템들을 통합할 때 필요한 연계방안의 토대를 마련할 수 있었다.

  • PDF

GIS기반의 실시간 통합화물운송시스템 계획에 관한 연구 (A Study on a Real Time Freight Delivery Planning for Supply Center based on GIS)

  • 황흥석;김호균;조규성
    • 경영과학
    • /
    • 제19권2호
    • /
    • pp.75-89
    • /
    • 2002
  • According to the fast-paced environment of information technology and improving customer services, the design activities of logistics systems improve customer centric services and delivery performance implementing e-logistics system. The fundamental design issues that arise in the delivery system planning are optimizing the system with minimum cost and maximum throughput and service level. This study is concerned with the integrated model development of delivery system with customer responsive service level for DCM, Demand Chain Management. We used a two-step approach for this study. First, we formulated the supply. center facility planning using stochastic set-covering problem and assigned the customers to the supply center using clustering algorithm. Second, we developed vehicle delivery planning for a supply center based on GIS, GIS-VRP. Also we developed a GUI-type computer program for proposed method for supply center problem using GIS and Geo-DataBase of Busan area. The computational results showed that the proposed method was very effective on a set of test problems.