• 제목/요약/키워드: Integrated Delivery System

검색결과 184건 처리시간 0.026초

통합의료시스템(Integrated Delivery System, IDS)의 전략적 접근: 수직적 통합과 전략적 제휴 (Strategic Approaches to Integrated Delivery System(IDS): Vertical Integration and Strategic Alliance)

  • 서원식
    • 한국병원경영학회지
    • /
    • 제spc호
    • /
    • pp.39-50
    • /
    • 2016
  • This paper discusses the strategic concepts applied to integrated delivery system(IDS). IDS is rooted in vertical integration(VI) and strategic alliance(SA), but only few knows about the theoretical backbone of the IDS. The paper explains how VI and SA applies to IDS, then provides cases of IDS rooted in strategic concepts; Kaiser Permanante Model, Mayo Clinic Model, and ACO(Accountable Care Organizations). Finally the paper provides the implication of IDS on Korean healthcare delivery system.

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

린 건설 관리 방식의 공사 전 설계 진행에 관한 연구 -미국 벨뷰 어린이 병원 사례 조사- (A Study on Preconstruction Process in Support of Lean Project Delivery System - Case Study of Children's Hospital at Bellevue, Wa, U.S.A. -)

  • 김용우;김광호
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제14권4호
    • /
    • pp.47-54
    • /
    • 2008
  • Preconstruction process in a lean project delivery system was studied in one large healthcare project working for a general contractor. Researchers joined a new lean delivery project for approximately six weeks and participated in preconstruction process including design coordination, management coordination, and target costing while concurrently interviewing other project participants and employees, recording activity in meetings, and otherwise observing the process. The preconstruction process in lean project delivery system, called integrated project design, showed many benefits such as brining expertise of downstream players (i.e., mechanical and electrical contractors) into the design phase. However, lack of leadership and lack of design-integrator blocked the successful application of a new concept of design process.

  • PDF

지역별 노인 만성기 의료 및 요양·돌봄 공급체계 유형화 (Categorization of Regional Delivery System for the Elderly Chronic Health Care and Long-Term Care)

  • 윤난희;윤성훈;서동민;김윤;김홍수
    • 보건행정학회지
    • /
    • 제33권4호
    • /
    • pp.479-488
    • /
    • 2023
  • Background: By applying the suggested criteria for needs-based chronic medical care and long-term care delivery system for the elderly, the current status of delivery system was identified and regional delivery systems were categorized according to quantity and quality of delivery system. Methods: National claims data were used for this study. All claims data of medical and long-term care uses by the elderly and all claims data from long-term care hospitals and nursing homes in 2016 were analyzed to categorize the regional medical and long-term care delivery system. The current status of the delivery system with a high possibility of transition to a needs-based appropriate delivery system was identified. The necessary and actual amount of regional supply was calculated based on their needs, and the structure of delivery systems was evaluated in terms of the needs-based quality of the system. Finally, all regions were categorized into 15 types of medical and care delivery systems for the elderly. Results: Of the total 55 regions, 89.1% of regions had an oversupply of elderly medical and care services compared to the necessary supply based on their needs. However, 69.1% of regions met the criteria for less than two types of needs groups, and 21.8% of regions were identified as regions where the numbers of institutions or regions with a high possibility of transition to an appropriate delivery system were below the average levels for all four needs groups. Conclusion: In order to establish an appropriate community-based integrated elderly care system, it is necessary to analyze the characteristics of the regional delivery system categories and to plan a needs-based delivery system regionally.

GIS기반의 실시간 통합화물운송시스템 계획에 관한 연구 (A Study on a Real Time Freight Delivery Planning for Supply Center based on GIS)

  • 황흥석;김호균;조규성
    • 경영과학
    • /
    • 제19권2호
    • /
    • pp.75-89
    • /
    • 2002
  • According to the fast-paced environment of information technology and improving customer services, the design activities of logistics systems improve customer centric services and delivery performance implementing e-logistics system. The fundamental design issues that arise in the delivery system planning are optimizing the system with minimum cost and maximum throughput and service level. This study is concerned with the integrated model development of delivery system with customer responsive service level for DCM, Demand Chain Management. We used a two-step approach for this study. First, we formulated the supply. center facility planning using stochastic set-covering problem and assigned the customers to the supply center using clustering algorithm. Second, we developed vehicle delivery planning for a supply center based on GIS, GIS-VRP. Also we developed a GUI-type computer program for proposed method for supply center problem using GIS and Geo-DataBase of Busan area. The computational results showed that the proposed method was very effective on a set of test problems.

의료서비스 복합화의 경영효과 분석 : 일본의 사례 (Managerial Effectiveness of Integrated Delivery System in Japan)

  • 정승원;이노우에 유스케;서영준;김연희
    • 한국병원경영학회지
    • /
    • 제14권2호
    • /
    • pp.60-74
    • /
    • 2009
  • This study purports to verify managerial effectiveness of the integrated delivery system(IDS) of Japanese health care institutions through comparing the managerial performance between hospital groups providing with both acute and nursing care and those with acute care only. Data on the managerial performance of 697 hospitals providing with nursing care together and 819 hospitals providing with acute care only were collected from Japanese Central Social Insurance Medical Councils 2001, 2003, 2005, and were analyzed using mean comparison test(t-test) between the two groups. The results revealed that there were significant differences between the two groups in such indicators as ratio of material cost, labor cost, depreciation rate, total margin, operating margin, average number of outpatient per day, average revenue of an inpatient per day, total amount of labor cost, gross revenue per employee, and labor productivity. However, we could not find out any consistent evidence which support the effect of integrated delivery system on the hospital managerial performance. Further discussion was made on the limitation of the study and future research agenda relevant to the topic.

  • PDF

정보기술을 활용한 주민서비스 전달체계 개선사례 연구 : "공공요금 감면절차 간소화" 구현 및 성공요인 중심 (A Study on Reform Case of the Citizen Service Delivery System by using IT : Focused on the Implementation of Public Utility Charges Depreciation Simplification and its Implications)

  • 김완평
    • 디지털산업정보학회논문지
    • /
    • 제6권3호
    • /
    • pp.221-230
    • /
    • 2010
  • Citizens' demand, which has been previously focused on welfare, is now expanding to include elements for higher quality of life such as employment, housing, culture, and sports. Accordingly, the government, with an aim of effectively delivering resident services that satisfy various demands, is committed to transforming the central government-oriented service system into the integrated service system based on public-private partnership. The government is also dedicated to expanding services to 8 areas including not only welfare but also healthcare, employment, housing, education, sports, culture, and tourism, which are directly related to everyday lives of residents. This project is designed to support such reforms in the citizen service delivery system in order to enhance quality of life of local residents. This study is to draw implications from analysis for implementing the citizen service integrated information system in order to reform the citizen service delivery system effectively through examinations and analyses of citizen services provided by the central government. Especially focus on public utility charges depreciation simplification citizen service. Its implications are expected to offer a real contribution for central and local Governments that want to increase the productivity of implementing eGovernment service.

통합적 공공 복지전달체계를 위한 조건: 영국 사례 연구 (Conditions for Integrated Public Welfare Delivery System: Case Studies in Britain)

  • 김보영
    • 한국사회정책
    • /
    • 제25권2호
    • /
    • pp.403-428
    • /
    • 2018
  • 우리나라에서 통합적인 공공 복지전달체계 구축을 위한 시도는 통합사례관리까지 지속적으로 이루어지고 있고, 특히 최근 '커뮤니티 케어'와 관련해 중요성을 더해가고 있다. 하지만 대부분 부분적인 조직개편에 그치거나 민간자원의 동원에 그치고 있는 것이 현실이다. 이에 본 연구에서는 사회서비스 정책 발전에 있어서 통합적 개혁의 경험을 가지고 있는 영국의 보건의료와 사회서비스의 통합적 접근 사례, 우리나라 통합사례관리와 유사한 문제경험가족 프로그램 사례를 각각 런던 자치구와 지방의회를 방문하여 조사하였다. 그 결과 통합적 전달체계를 실현하기 위해서는 인력, 조직, 재정 등 제도적 장벽의 종합적인 해소가 시급하고, 관련된 전문 집단과 기관간의 분명한 목표 공유와 파트너십 구축이 필요하며, 사례에 대한 정보 공유 체계와 기술적 지원이 뒷받침되어야 함을 발견할 수 있었다.

CONNECTING TECHNOLOGY, INDUSTRY AND RESEARCH: A VERTICAL INTEGRAL PROJECT COURSE FOR BIM EDUCATION OPPORTUNITIES

  • F. H. (Bud) Griffis;Mei Liu;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.252-259
    • /
    • 2013
  • Building Information Modeling (BIM) is utilizing CAD technology in a way that ultimately ties all the components of a building together as objects imbedded with information, and has been changing the way we design and build over the last 20-30 years. In Polytechnic Institute of NYU, there are four BIM courses offered which provide students with different levels of knowledge regarding BIM Technique, BIM Standards, BIM Guideline and Roadmap for Private and Public Implementation, BIM Application in Real Projects, the Cooperation of BIM and IPD for Public Works in New York City. With advanced BIM technology, BIM's integration into the construction process and its incorporation into project delivery systems, especially Integrated Project Delivery (IPD) are the bridges between technology, industry and research. This paper presents an integrated BIM curriculum with three modules: 1) BIM functions and Bid Preparation; 2) Time-Cost Trade-off Analysis; and 3) Problems Solving in BIM/IPD Environment. In this project-based curriculum developed by the common efforts of academia, public agency and industry, the objectives are: (1) to provide the information and skills needed to successfully implement BIM into the construction phase; (2) to identify BIM's role in construction and the project delivery system; (3) to develop a module in conjunction with leading BIM into project delivery system, particularly coordination between BIM and IPD; (4) to connect technology and research into industry. The course assessment was conducted and the results indicate that it is a successful reform in construction management education.

  • PDF