A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods

  • Peressini, Anthony;Bristow, James;Motahari, Mahmoud;Karakouzian, Moses
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.669-677
    • /
    • 2022
  • In this paper, different types of traditional project delivery methods in the construction industry were explored and a comparative analysis against Integrated Project Delivery (IPD) were performed. The advantages of IPD method for all parties, owner/engineer/architect/general contractor, were explored by reviewing the most recent literature. The literature suggests that IPD method should be the dominating project delivery method and diluting the conventional methods such as Design-Bid-Build due to more collaborative and mutually beneficial ways of doing construction; IPD is newer and a more comprehensive method to capture the intrinsic values of project collaboration. This paper presents a comparison of the commonly used methods of project delivery, Design-bid-build, CMAR, & Design-Build and addresses their advantages and disadvantages in differing project scopes and sizes. Several industry leaders with experience in the four types of project delivery addressed were surveyed. The survey results show an overwhelming desire for future projects to go toward IPD from the contractor/owner/RDP. The biggest obstacle facing a project from using IPD appears to be trust.

  • PDF

A Study on a Real Time Freight Delivery Planning for Supply Center based on GIS (GIS기반의 실시간 통합화물운송시스템 계획에 관한 연구)

  • 황흥석;김호균;조규성
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.75-89
    • /
    • 2002
  • According to the fast-paced environment of information technology and improving customer services, the design activities of logistics systems improve customer centric services and delivery performance implementing e-logistics system. The fundamental design issues that arise in the delivery system planning are optimizing the system with minimum cost and maximum throughput and service level. This study is concerned with the integrated model development of delivery system with customer responsive service level for DCM, Demand Chain Management. We used a two-step approach for this study. First, we formulated the supply. center facility planning using stochastic set-covering problem and assigned the customers to the supply center using clustering algorithm. Second, we developed vehicle delivery planning for a supply center based on GIS, GIS-VRP. Also we developed a GUI-type computer program for proposed method for supply center problem using GIS and Geo-DataBase of Busan area. The computational results showed that the proposed method was very effective on a set of test problems.

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF

Voltage Optimization of Power Delivery Networks through Power Bump and TSV Placement in 3D ICs

  • Jang, Cheoljon;Chong, Jong-Wha
    • ETRI Journal
    • /
    • v.36 no.4
    • /
    • pp.643-653
    • /
    • 2014
  • To reduce interconnect delay and power consumption while improving chip performance, a three-dimensional integrated circuit (3D IC) has been developed with die-stacking and through-silicon via (TSV) techniques. The power supply problem is one of the essential challenges in 3D IC design because IR-drop caused by insufficient supply voltage in a 3D chip reduces the chip performance. In particular, power bumps and TSVs are placed to minimize IR-drop in a 3D power delivery network. In this paper, we propose a design methodology for 3D power delivery networks to minimize the number of power bumps and TSVs with optimum mesh structure and distribute voltage variation more uniformly by shifting the locations of power bumps and TSVs while satisfying IR-drop constraint. Simulation results show that our method can reduce the voltage variation by 29.7% on average while reducing the number of power bumps and TSVs by 76.2% and 15.4%, respectively.

A Study of Integrated Project Delivery(IPD) Methods Based on Building Information Modeling(BIM) (BIM 기반의 IPD 발주방식에 관한 연구)

  • Shin, Kyoo-Chul;Ham, In-Ho
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.3
    • /
    • pp.15-25
    • /
    • 2012
  • The purpose of this research is to explore the necessity of utilizing IPD methods along BIM based project operation in domestic construction market. IPD is relatively new project delivery methods focused on the collaboration of stockholders based on BIM technology. IPD is focused on the multiparty contract process rather than multiple bilateral contracts under Traditional Project Delivery Methods. The research method is to investigate the IPD standard contract documents, successful IPD project cases in the U.S. The research results are as follows. The model for an IPD standard contract needs to be developed for the application to a real construction projects. Various types of IPD model contract need to be developed to accommodate the requirements of industry and stockholders in Korea.

Exploring the adoption of IPD practices in Chinese construction industry

  • Li, Shan;Ma, Qiuwen
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.245-251
    • /
    • 2017
  • Integrated Project Delivery (IPD) is a procurement method that has been proved to improve construction project performance. However, in China implementation of IPD practices in construction projects is unknown though some researchers have studied the problems and constraints in adoption IPD. The purpose of this study was to explore IPD adoption in Chinese construction industry. Critical components of IPD implementation were reviewed, and questionnaires were distributed to collect industry views. The results revealed that IPD uptake is still low. In particular, the liability waiver and shared risks and rewards have been rarely used. In addition, co-location, value engineering method and the new compensation approach have also been hardly adopted. Some practices related to early involvement of key parties were adopted. Surprisingly, the findings indicate that the client has been continuously involved in the projects. The findings may imply that the legal issues and problems of contractual frameworks are still constraining IPD implementation in Chinese construction industry.

  • PDF

Improved Drone Delivery System Through User Authentication and Mission Automation Using EdgeCPS (EdgeCPS를 활용한 사용자 인증 및 임무 자동화를 통한 드론 배송 시스템 개선)

  • MinGuen Cho;MinKi Beak;EuTeum Choi;DongBeom Ko;SungJoo Kang;SeongJin Lee
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.18 no.4
    • /
    • pp.141-150
    • /
    • 2023
  • Currently, various companies are actively participating in research and development of drone delivery services. Existing studies do not comprehensively provide integrated functions for future drone delivery services such as mission automation, customer verification, and overcoming performance limitations, which can lead to high manpower demand, reduced user service trust, and potentially overloading low-end devices. Therefore, this study proposes a drone mission automation system (DMAS) using EdgeCPS technology to provide the three aforementioned functions in an integrated manner. Real-world experiments were conducted to evaluate the proposed system, demonstrating that the DMAS components operate according to the specified roles in the delivery scenario. In addition, the system achieved user verification with a similarity of more than 90% in the process of receiving the product, and verified a faster inference speed and a lower resource share than the existing method.

A robust collision prediction and detection method based on neural network for autonomous delivery robots

  • Seonghun Seo;Hoon Jung
    • ETRI Journal
    • /
    • v.45 no.2
    • /
    • pp.329-337
    • /
    • 2023
  • For safe last-mile autonomous robot delivery services in complex environments, rapid and accurate collision prediction and detection is vital. This study proposes a suitable neural network model that relies on multiple navigation sensors. A light detection and ranging technique is used to measure the relative distances to potential collision obstacles along the robot's path of motion, and an accelerometer is used to detect impacts. The proposed method tightly couples relative distance and acceleration time-series data in a complementary fashion to minimize errors. A long short-term memory, fully connected layer, and SoftMax function are integrated to train and classify the rapidly changing collision countermeasure state during robot motion. Simulation results show that the proposed method effectively performs collision prediction and detection for various obstacles.

A STUDY ON THE FEASIBILITY OF IPD METHOD IN CONSTRUCTION PROJECT IN CHINA

  • Teng Li;Jae-Jun Kim;Ju-Hyung Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.493-497
    • /
    • 2011
  • Project delivery systems have evolved over the years. Continuous changes in technology and the increasing sophistication in buildings required specialization of design and construction services. IPD as a delivery method has been used in the USA and other countries. With the development of BIM, lots of construction companies have been realizing this method since BIM came out in China. However IPD are not considered with BIM, IPD will be an important role in management system of construction. This study introduced the definition of IPD and based on the flow process of IPD, compared the process in china and other countries. Through the real project and the condition in China this paper analyzed the feasibility of IPD in China.

  • PDF