• 제목/요약/키워드: Integrated Construction

검색결과 1,683건 처리시간 0.527초

Integrated Architectural Engineering Design Process Using BIM Tools (BIM 도구 활용을 통한 건축공학설계의 프로세스)

  • Kang, Da-Young;Shin, Kyoo-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.175-178
    • /
    • 2010
  • Public institutions and owners have been introduced to use Building Information Modeling (BIM) tools. Learning BIM becomes an important factor in design process of undergrad program. The purpose of this study is to demonstrate an integrated architectural engineering design process using BIM tools. BIM education programs are analyzed to compare the level of detail in BIM education. An architectural engineering design class needs to involve BIM to introduce integrated process. An architectural engineering design process needs be based on understanding design, building structure, construction and building services. 3D Modeling helps understanding a building structure and checking environment-friendly element analysis. As a result of this research, new process of design education is proposed under four issues.

  • PDF

Application of BIM-Based Integrated Building Design Process at the Design Phase (설계단계에서의 BIM기반 통합설계 프로세스 적용 방안에 대한 연구)

  • Seo, Chang-Seok;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.195-199
    • /
    • 2010
  • Today, as construction industry grows rapidly, technology has advanced throughout the whole industrial world. Architectural design phase has gone digital from the traditional method of drawing which was an important means in the past, and Building Information Modeling(BIM), an emerging new paradigm, changed architectural design process. So this paper studies the difference between a 2D-based and a BIM-based design process which are currently applied to domestic, and proposes a BIM-based integrated design process in order to help establish BIM to domestic efficiently.

  • PDF

A study on the economic analysis of the integrated aluminum truss (일체형 알루미늄 트러스의 경제성분석에 관한 연구)

  • Lee, Young-Lae;Hong, Seong-Wook;Kim, Shin;Mun, Je-Chul;Shin, Chan-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.127-130
    • /
    • 2011
  • This study is concerned with the integrated aluminum trusses on the economic analysis of the study, and aluminum truss beam zinc red lead of the economy when compared beam total amount of red lead zinc beam 54,000 won 52,000 won 58,000 won Aluminum beam Red lead to over beam 2,000 won, 6,000 won lower than that for zinc are believed to be beam. This material is aluminum and the other beam expensive than the material costs of aluminum and an easy construction method beam attribute part of the low cost of labor and overall cost compared to the red lead beam zinc were identified as having competitive prices.

  • PDF

Application Method of Integrated Information System on waterproofing Quality for Improving Structure Durability (구조물 내구성 향상을 위한 방수품질 관련 통합정보시스템 활용방안에 관한 연구)

  • Kang, Hyo-Jin;An, Ki-Won;Kim, Byoung-il;Oh, Sang-keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.339-340
    • /
    • 2018
  • Contemporary concrete structures make use of underground spaces as parking lots and other comfort facilities for efficiency purposes. As underground environmental conditions are in constant exposure to degradation factors from the environment such as groundwater, hydraulic and soil pressure, structural movement and settlement, structural defects in the form of leakage occur. Current maintenance regulations and regimes are unable to respond to this field, as degradation mechanisms in underground environments are still unclear. In this regard, this study proposes the utilization of integrated information sharing system that can provide various technical information for construction designs to prevent leakages in underground concrete structures.

  • PDF

DEVELOPMENT OF AN INTEGRATED MODEL OF 3D CAD OBJECT AND AUTOMATIC SCHEDULING PROCESS

  • Je-Seung Ryu;Kyung-Hwan Kim
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1468-1473
    • /
    • 2009
  • Efficient communication of construction information has been critical for successful project performance. Building Information Modeling (BIM) has appeared as a tool for efficient communication. Through 3D CAD objects, it is possible to check interception and collisions of each object in advance. In addition, 4D simulation based on 3D objects integrated with time information makes it realize to go over scheduling and to perceive potential errors in scheduling. However, current scheduling simulation is still at a stage of animation due to manual integration of 3D objects and scheduling data. Accordingly, this study aims to develop an integrated model of 3D CAD objects that automatically creates scheduling information.

  • PDF

Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information (BIM정보를 활용한 강구조물의 공정 물량 통합관리)

  • Kim, Jin-Uk;Shin, Tae-Song
    • Journal of KIBIM
    • /
    • 제8권2호
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

Construction of an Integrated Pepper Map Using RFLP, SSR, CAPS, AFLP, WRKY, rRAMP, and BAC End Sequences

  • Lee, Heung-Ryul;Bae, Ik-Hyun;Park, Soung-Woo;Kim, Hyoun-Joung;Min, Woong-Ki;Han, Jung-Heon;Kim, Ki-Taek;Kim, Byung-Dong
    • Molecules and Cells
    • /
    • 제27권1호
    • /
    • pp.21-37
    • /
    • 2009
  • Map-based cloning to find genes of interest, marker-assisted selection (MAS), and marker-assisted breeding (MAB) all require good genetic maps with high reproducible markers. For map construction as well as chromosome assignment, development of single copy PCR-based markers and map integration process are necessary. In this study, the 132 markers (57 STS from BAC-end sequences, 13 STS from RFLP, and 62 SSR) were newly developed as single copy type PCR-based markers. They were used together with 1830 markers previously developed in our lab to construct an integrated map with the Joinmap 3.0 program. This integrated map contained 169 SSR, 354 RFLP, 23 STS from BAC-end sequences, 6 STS from RFLP, 152 AFLP, 51 WRKY, and 99 rRAMP markers on 12 chromosomes. The integrated map contained four genetic maps of two interspecific (Capsicum annuum 'TF68' and C. chinense 'Habanero') and two intraspecific (C. annuum 'CM334' and C. annuum 'Chilsungcho') populations of peppers. This constructed integrated map consisted of 805 markers (map distance of 1858 cM) in interspecific populations and 745 markers (map distance of 1892 cM) in intraspecific populations. The used pepper STS were first developed from end sequences of BAC clones from Capsicum annuum 'CM334'. This integrated map will provide useful information for construction of future pepper genetic maps and for assignment of linkage groups to pepper chromosomes.

Integrated Code Classification System for Work Sections in Standard Method of Measurement and Construction Standard Specifications (수량산출기준 및 공사시방서의 공종분류코드 통합기준 연구)

  • Kang Leen-Seok;Kwak Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • 제2권4호
    • /
    • pp.80-91
    • /
    • 2001
  • Considering that the classified items in the work section level can have an applicability when those items are being used to cost and specification information with consistency, the work section classification code should be applied as an Integrated code system. Our construction industry is using three work section classification systems for civil engineering projects, such as integrated construction information classification system, standard method of measurement and guide of project specification. And each standard construction specification is also using different work section classification systems. This study suggests a methodology to integrate the code systems in construction specifications with civil engineering standard method of measurement. And the methodology suggested in this study was applied to a web-based prototype system with practical specification codes.

  • PDF