• Title/Summary/Keyword: Integrated Construction

Search Result 1,685, Processing Time 0.022 seconds

A Research on Improvement Scheme for Management Technique of Public Ordering Service Results and Estimation (공공발주용역 실적 및 평가 관리 프로세스 개선에 대한 연구)

  • Lee, Kyu-Sung;Lee, Han-kyu;Kim, Nam-Gon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.238-239
    • /
    • 2013
  • A system to efficiently utilize construction information has been in demand as a result of the changing society where information and knowledge leads to added value. Consequently, the government established a comprehensive information network system for construction industries to manage and utilize construction information which is the currently in use. However, this system is oriented toward management and business performance estimation for engineering and does not integrate a management system for design, construction technology, and construction engineering services. Therefore, this study proposes to develop object technology and management system of construction services and its evaluation to provide such information in real time.

  • PDF

Analysis of the Relationship between Construction Industry and Cooperation Business (건설 산업을 중심으로 한 협력 산업과의 관계 분석)

  • Moon, Sung-Kon;Lee, Joo-Sung;Yoo, Seung-Kyu;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.149-153
    • /
    • 2009
  • Today, the form of competition among companies quickly changes in new paradigm. In the past company activity was performed independently, but now dependently. With global age, that change is essential, the introduction of a system that integrates a series of courses is needed for the success of members. Nevertheless, those change are very slow in construction industry, that causes a lot of loss in project process. Construction industry produce structures with collaboration of other industries. There are difficulties that only one company make it, alone. In this trend, cooperation is essential. but the process of original brings a lot of loss From this perspective, this study will prove dependencies of construction industry. Draw out each factor from industrial cooperation, those analyze correlation with system dynamics. In conclusion, this study performs a basic research about 'Integrated Management System' of construction project.

  • PDF

FRAMEWORK FOR HIGHLY INTEGRATED, INTEROPERABLE CONSTRUCTION SIMULATION ENVIRONMENTS

  • Simaan M. AbouRizk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.71-82
    • /
    • 2009
  • This paper describes the use of a highly interactive and inter-operative application for complex simulation environments, or Synthetic Environments (SE), as deployed for construction as Construction Synthetic Environments (CSE). Based on the High Level Architecture (HLA), this research focuses on implementing simulation technology in a software environment, COSYE, that will be the foundation for building CSE applications. This framework is discussed in the context of tunneling and industrial construction applications, including steel fabrication and pipe-spool manufacture. The framework is demonstrated using the NEST sanitary tunnel project in Edmonton, Canada, in which COSYE was used for scenario-based analysis and planning.

  • PDF

Integrating Real Options with Earned Value methods as a decision support tool for the financial evaluation of alternative construction methods

  • Bonsang Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.129-132
    • /
    • 2013
  • Determining on a particular construction method is typically decided in the initial phases of a project. However, changing conditions during actual construction may require a different method or technology to be employed. Providing an option for project managers to change construction provides flexibility that can increase value to the overall project. This research provides the ability to modify construction methods as a real option, which allows its value to be modeled. The research also formalizes a way to integrate a binomial lattice model with the Earned Value Method's S-curve. The integrated model provides a decision support tool that planners can use to determine whether to exercise the option depending on the status metrics provided by EVM.

  • PDF

An Analysis of a Request for the Development of Computer Application Technology in an Architectural Construction Management System (건축공정 관리시스템의 전산적용 최적화를 위한 시스템 개발 요구 분석)

  • Kwon, Choon-An;Ji, Suk-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.567-575
    • /
    • 2011
  • With the development of construction information, a computerization tool for architectural process control is a necessary tool. However, the reality is that the conditions and understanding of users are not sufficient to fully utilize such a tool. In particular, it was analyzed that the reason for the negative feedback from hands-on workers regarding the current process control information system is that there is a difficulty in accessing the system for users that are not process and planning experts, due to a lack of information and technical contents at the phase of control and planning prior to the process plan. Therefore, the demands of users and a direction for the improvement of a system in terms of optimizing process control computerization were investigated, with the aim of addressing the disadvantages of the existing system and developing a professional system that is specialized in the construction industry. Therefore, it is necessary to construct an integrated WBS (IWBS) that combines WBS with CBS, and subsequently, it is judged that the most important aspect is the integrated technology of compatibility and operation of data that is linked with OBS. The process information must then deal with the changing information; in other words, the amount of construction, construction cost, and the required construction period etc., by coding data into a 4-unit index, such as a project unit (WBS Level 1), a project facility unit (WBS Level 2), a management department unit (OBS Level 1), and a control manager unit (OBS Level 2). After that, it was found that it is necessary to develop a computer system to consistently integrate process information into a management department.

Design of Network Architecture in Underground Structure Field Information Based on VI-GNSS (VI-GNSS 지하구조물 현장정보 네트워크 아키텍쳐 설계)

  • Jeon, Heung-Soo;Jang, Yong-Gu;Oh, Chang-Kyun;Kim, Min-Koan
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.18 no.1
    • /
    • pp.64-73
    • /
    • 2015
  • Recently, the integrated utilization of technology with IT is in demand for the effectiveness of field management together with the prevention and prompt action on safety accident at construction site. In addition, the establishment of construction site support system is necessary to implement the securing of worker's safety, smooth work instruction, efficiency in construction, and others. Data standardization and network architecture were designed regarding data and sound information for data transmission between systems and management. These were to construct USFSS based on integrated VI-GNSS technology in this research. In the stability test of data for each system constructed through it, around 98% stability was secured between workers and for transfer vehicle system within underground structure and field server system in regards to the data transmission stability, around 100% stability was secured between field server system and control system, respectively. Also, in the sound transmission stability test, around 99% reliability could be secured with 1km distance as its standard in case of sound transmission from underground structure construction site to field office near the field through wireless FRS system.

Establishment Construction Enterprise Resource Planning(ERP) & Construction Information Sttategy (건설정보화 전략과 ERP구축)

  • Lee Min-Nam;Oh Dong-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.164-170
    • /
    • 2003
  • This paper is to evaluate the informational direction, current situations and ERP establishment concerning constructing industry, to present the right directions, implemented cases for implementing constructional ERP, also to suggest the effect, influence, problems and shootings in constructional ERP arena. The constructing industries in korea are facing great turning point because of the huge corruptions currently happened and forcing to open the market in 1997. Attempting to establish Computer Integrated construction system (ERP) by breaking down constructing cost, improving quality, operating rapid and effective construction to enhance productivity, it is hard to achieve the goal with only inter-contractor's establishment. Constructing industries are integrated ones, consisted of many organizations for instance ordering agencies, contractors, subcontractors, material vendors, etc. and use various information formats such as texts, graphics, drawings. I dare suggest that implementation of constructional CALS including EDI/EC, GIS is tile only solution to control the information systematically generated in whole stages from planing, designing, constructing through maintenance, and to supply or switch the information.

  • PDF

An Integrated Construction Management System Based on the Earned Value Concept (EV개념에 의한 통합건설공사관리시스템)

  • Chung Chul-Won;Lee Jeom-Su;Oh Kyu-Whan;Chang Jin-Sik;Lee Yu-Seop;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.155-162
    • /
    • 2001
  • Recently, in Korea, a few construction companies have been tried to develop a management system, which is able to integrate schedule and cost. In spite of these attempts, however, advanced management techniques can be hardly applied under the BoQ based management system. In order to improve these problems, many studies have been peformed, but yet could not overcome practical limitations. Besides, the application of historical data is below the level since it is so difficult to accumulate and feed-back historical data under the unique character of construction industry. Consequently, lots of time and effort have being wasted to establish control criteria. The newly generated Information is not systematically managed as well. Therefore, this study suggests Integrated Construction Management System complemented the existing practical problems.

  • PDF

Structural Performance Evaluation on Flexural and Shear Capacity for Weight Reducing Steel Wire-Integrated Void Deck Plate Slab (자중저감 철선일체형 중공 데크플레이트 슬래브의 휨 및 전단내력에 대한 구조성능평가)

  • Kim, Sang-Seup;Ryu, Deog-Su;Boo, Yoon-Seob
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.4
    • /
    • pp.411-422
    • /
    • 2012
  • The purpose of this study is to evaluate the flexural and shear capacity of steel wire-integrated void deck plate slabs. In order to evaluate flexural and shear capacity, we make five 150mmspecimens and three 200mmspecimens by slab depth as main variable. Each series of specimen is comprised of an existing steel wire-integrated deck-plate slab and two specimens using topping depth as variable. From the series of experiments, steel wire-integrated void deck plate slabs has any decline in flexural and shear performance. Therefore, a void-deck-plate slab which inserts Omega-steel plate showed reducing a using concrete-volume and had flexural and shear capacity following existing steel wire-integrated deck-plate.

Development of Distributed Rainfall-Runoff Modelling System Integrated with GIS (지리정보시스템과 통합된 분포형 강우-유출 모의 시스템 개발)

  • Choi, Yun-Seok;Kim, Kyung-Tak;Shim, Myung-Pil
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.12 no.3
    • /
    • pp.76-87
    • /
    • 2009
  • Most distributed models have been developed for data interchange between model for hydrological analysis and GIS(Geographic Information System). And some interface systems between them have been developed to operate the model conveniently. This study is about developing integrated system between model and GIS not coupled system based on file interchange or interface system. In this study, HyGIS-GRM which is integrated system between GRM(Grid based Rainfall-runoff Model) which is physically based distributed rainfall-runoff model and HyGIS(Hydro Geographic Information System) have been developed. HyGIS-GRM can carry out all the processes from preparing input data to appling them to model in the same system, and this operation environment can improve the efficiency of running the model and analyzing modeling results. HyGIS-GRM can provide objective modeling environment through establishing the process of integrated operation of GIS and distributed model, and we can obtain fundamental technologies for developing integrated system between GIS and water resources model.

  • PDF