• Title/Summary/Keyword: Installed performance

Search Result 2,751, Processing Time 0.033 seconds

A Study on a PCB Manufacturing Plant's Fire Risk Assessment due to the Mitigation of Fire Protection Zone and an Improvement Way through Estimation of Sprinkler Demand Water Flow Rate (방화구획 완화에 따른 PCB공장의 화재위험평가 및 스프링클러 요구살수유량 산정을 통한 기준개선안에 관한 연구)

  • Oh, Chan-Wook;Oh, Ryun-Seok;Choi, Jun-Ho
    • Fire Science and Engineering
    • /
    • v.33 no.2
    • /
    • pp.56-62
    • /
    • 2019
  • A sprinkler is a fire extinguishing equipment installed in a protected area where a detector or head detects a fire and automatically puts out the fire. However, the Ministry of Land, Infrastructure and Transport's "Regulations on Building Evacuation and Fire Protection Standards, etc." stipulate that fire compartment area should be reduced to three times by installing sprinkler facilities in the case of factories and warehouses. In this study, fire hazard was analyzed for a real PCB factory which mitigated the fire protection zone by sprinkler installation, and the head opening characteristics of sprinkler facilities through computer simulation, installation standards of sprinkler facilities, thermal performance, operating range, and the amount of water sprayed to identify the problems of operation of sprinkler facilities in case of fire, and to suggest the grounds such as required sprinkling flow rate for system improvement.

An Exploratory Study on Block chain based IoT Edge Devices for Plant Operations & Maintenance(O&M) (플랜트 O&M을 위한 블록체인 기반 IoT Edge 장치의 적용에 관한 탐색적 연구)

  • Ryu, Yangsun;Park, Changwoo;Lim, Yongtaek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.1
    • /
    • pp.34-42
    • /
    • 2019
  • Receiving great attention of IoT and 4th industrial revolution, the necessity comes to the fore of the plant system which aims making it smart and effective. Smart Factory is the key realm of IoT to apply with the concept to optimize the entire process and it presents a new and flexible production paradigm based on the collected data from numerous sensors installed in a plant. Especially, the wireless sensor network technology is receiving attention as the key technology of Smart Factory, researches to interface those technology is actively in progress. In addition, IoT devices for plant industry security and high reliable network protocols are under development to cope with high-risk plant facilities. In the meanwhile, Blockchain can support high security and reliability because of the hash and hash algorithm in its core structure and transaction as well as the shared ledger among all nodes and immutability of data. With the reason, this research presents Blockchain as a method to preserve security and reliability of the wireless communication technology. In regard to that, it establishes some of key concepts of the possibility on the blockchain based IoT Edge devices for Plant O&M (Operations and Maintenance), and fulfills performance verification with test devices to present key indicator data such as transaction elapsed time and CPU consumption rate.

Development of Embedded Board for Construction of Smart Factory (스마트 팩토리 구축을 위한 임베디드 보드 개발)

  • Lee, Yong-Min;Lee, Won-Bog;Lee, Seung-Ho
    • Journal of IKEEE
    • /
    • v.23 no.3
    • /
    • pp.1092-1095
    • /
    • 2019
  • In this paper, we propose the development of an embedded board for construction of smart factory. The proposed embedded board for construction of smart factory consists of main module, ADC module, I/O module. Main module is a main calculating device which includes communication pard that allows interface with external device with using industrial protocol and is ported operating system makes board operating into. ADC module takes part in transferring digital signal has converted from electrical signal to the main module from the external sensor which is installed on the field. I/O module is an input and output module which transfers to the main module about a status, alarm, command signal of field device and it has a function that blocks external noises from field device with isolation circuit into it. In order to evaluate the performance of the proposed embedded board for construction of smart factory, it has been tested by an authorized testing institute. As a result, quantity of interacting protocol was 5, speed of hardware clock synchronization was under 10us and operating time of battery without source power was over 8 hours. It produced the same result as the world's highest level.

The Effect of Highland Weather and Soil Information on the Prediction of Chinese Cabbage Weight (기상 및 토양정보가 고랭지배추 단수예측에 미치는 영향)

  • Kwon, Taeyong;Kim, Rae Yong;Yoon, Sanghoo
    • Journal of Environmental Science International
    • /
    • v.28 no.8
    • /
    • pp.701-707
    • /
    • 2019
  • Highland farming is agriculture that takes place 400 m above sea level and typically involves both low temperatures and long sunshine hours. Most highland Chinese cabbages are harvested in the Gangwon province. The Ubiquitous Sensor Network (USN) has been deployed to observe Chinese cabbages growth because of the lack of installed weather stations in the highlands. Five representative Chinese cabbage cultivation spots were selected for USN and meteorological data collection between 2015 and 2017. The purpose of this study is to develop a weight prediction model for Chinese cabbages using the meteorological and growth data that were collected one week prior. Both a regression and random forest model were considered for this study, with the regression assumptions being satisfied. The Root Mean Square Error (RMSE) was used to evaluate the predictive performance of the models. The variables influencing the weight of cabbage were the number of cabbage leaves, wind speed, precipitation and soil electrical conductivity in the regression model. In the random forest model, cabbage width, the number of cabbage leaves, soil temperature, precipitation, temperature, soil moisture at a depth of 30 cm, cabbage leaf width, soil electrical conductivity, humidity, and cabbage leaf length were screened. The RMSE of the random forest model was 265.478, a value that was relatively lower than that of the regression model (404.493); this is because the random forest model could explain nonlinearity.

Improvement of Strain Detection Accuracy of Aircraft FBG Sensors Using Stationary Wavelet Transform (정상 웨이블릿 변환을 이용한 항공기 FBG 센서의 변형률 탐지 정확도 향상)

  • Son, Yeong-Jun;Shin, Hyun-Sung;Hong, Gyo-Young
    • Journal of Advanced Navigation Technology
    • /
    • v.23 no.4
    • /
    • pp.273-280
    • /
    • 2019
  • There are many studies that use structure health monitoring to reduce maintenance costs for aircraft and to increase aircraft utilization. Many studies on FBG sensors are also being conducted. However, if the FBG sensor is installed inside the composite, voids will occur between the layers of the composite, resulting in signal split problem. In addition, the FBG sensor is not affected by electromagnetic waves, but will produce electromagnetic noise caused by electronic equipment during post-processing. In this paper, to reduce the error caused by these noises, the stationary wavelet transform, which has the characteristics of movement immutability and is efficient in nonlinear signal analysis, is presented. And in the above situation, we found that noise rejection performance of stationary wavelet transform was better compared with the wavelet packet transform.

Study of Fire and Explosion Prevention of an Internal Floating Roof Tank (내부 부상형저장탱크(IFRT) 화재·폭발 예방대책에 관한 연구)

  • Koo, Chae-Chil;Choi, Jae-Wook
    • Fire Science and Engineering
    • /
    • v.33 no.1
    • /
    • pp.45-49
    • /
    • 2019
  • This study examined the safety of storage tanks by analyzing the causes of fire on outdoor storage tanks. The outdoor storage tank is a fixed device for the long-term storage of dangerous goods and consists of a tank body and accessories; the accessories consist of a vent system, breather valve, flame arrestor, etc. The flame arrestor is a necessary safety measure to prevent fire explosions on outdoor storage tanks. On the other hand, it has been suggested that the installation of a flame arrester is necessary to compare the domestic and international standards. In addition, the flame arrester should be installed in the existing outdoor storage tanks, to complement foreign standards because there are not enough domestic standards to verify the performance of the flame arrester.

Operation evaluation of DAF pilot plant for water treatment process in Hoedong Reservoir (회동수원지의 정수처리 공정을 위한 DAF pilot plant 운영 성능평가)

  • Maeng, Minsoo;Shahi, Nirmal Kumar;Kim, Donghyeun;Shin, Gwyam;Dockko, Seok
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.6
    • /
    • pp.463-471
    • /
    • 2020
  • A 1,000 ㎥/d DAF(dissolved air flotation) pilot plant was installed to evaluate the performance of the floating process using the Nakdong River. Efficiency of various DAF operations under different conditions, such as hydraulic loading rate, coagulant concentration was evaluated in the current research. The operation conditions were evaluated, based on the removal or turbidity, TOC(total organic carbon), THMFP(trihalomethane formation potential), Mn(manganese), and Al(aluminum). Also, particle size analysis of treated water by DAF was performed to examine the characteristics of particles existing in the treated water. The turbidity removal was higher than 90%, and it could be operated at 0.5 NTU or less, which is suitable for the drinking water quality standard. Turbidity, TOC, and THMFP resulted in stable water quality when replacing the coagulant from alum to PAC(poly aluminum chloride). A 100% removal of Chl-a was recorded during the summer period of the DAF operations. Mn removal was not as effective as where the removal did not satisfy the water quality standards for the majority of the operation period. Hydraulic loading of 10 m/h, and coagulant concentrations of 40 mg/L was determined to be the optimal operating conditions for turbidity and TOC removal. When the coagulant concentration increases, the Al concentration of the DAF treated water also increases, so coagulant injection control is required according to the raw water quality. Particle size distribution results indicated that particles larger than 25 ㎛ showed higher removal rates than smaller particles. The total particel count in the treated water was 2,214.7 counts/ml under the operation conditions of 10 m/h of hydraulic loading rate and coagulant concentrations of 60 mg/L.

Predicting flux of forward osmosis membrane module using deep learning (딥러닝을 이용한 정삼투 막모듈의 플럭스 예측)

  • Kim, Jaeyoon;Jeon, Jongmin;Kim, Noori;Kim, Suhan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.35 no.1
    • /
    • pp.93-100
    • /
    • 2021
  • Forward osmosis (FO) process is a chemical potential driven process, where highly concentrated draw solution (DS) is used to take water through semi-permeable membrane from feed solution (FS) with lower concentration. Recently, commercial FO membrane modules have been developed so that full-scale FO process can be applied to seawater desalination or water reuse. In order to design a real-scale FO plant, the performance prediction of FO membrane modules installed in the plant is essential. Especially, the flux prediction is the most important task because the amount of diluted draw solution and concentrate solution flowing out of FO modules can be expected from the flux. Through a previous study, a theoretical based FO module model to predict flux was developed. However it needs an intensive numerical calculation work and a fitting process to reflect a complex module geometry. The idea of this work is to introduce deep learning to predict flux of FO membrane modules using 116 experimental data set, which include six input variables (flow rate, pressure, and ion concentration of DS and FS) and one output variable (flux). The procedure of optimizing a deep learning model to minimize prediction error and overfitting problem was developed and tested. The optimized deep learning model (error of 3.87%) was found to predict flux better than the theoretical based FO module model (error of 10.13%) in the data set which were not used in machine learning.

A Study on Inductive Power Line Communication with Metal Block Channel (금속블록 채널이 있는 유도형 전력선통신에 관한 연구)

  • Sohn, Kyung-Rak;Kim, Hyun-Sik
    • Journal of IKEEE
    • /
    • v.25 no.1
    • /
    • pp.95-100
    • /
    • 2021
  • If we know the location of the hull block and the welding feeder in the shipyard, we can easily obtain the location information of the worker. That data is very useful for implementing a workplace safety monitoring system. However, it is difficult to apply a fixed communication network to the workplace due to the specificity of the hull structure and welding process. In this study, inductive power line communication, which can replace dedicated communication line, was reviewed. A ferrite core was used as an inductive coupler to be installed on the power cable of the welding machine, and a nano-crystalline core was applied as a coupler to be fastened to the support rod of the metal block. In order to visualize the operating principle of the proposed couplers, 3D modeling and finite element analysis were performed with the COMSOL AC/DC module. In the communication performance test using an aluminum profile, when the communication channel was formed by the contact of the welding electrode, the bandwidth was kept above 6 Mbps.

Structural monitoring and analyses on the stability and health of a damaged railway tunnel

  • Zhao, Yiding;Yang, Junsheng;Zhang, Yongxing;Yi, Zhou
    • Advances in concrete construction
    • /
    • v.11 no.5
    • /
    • pp.375-386
    • /
    • 2021
  • In this paper, a study of stability and health of a newly-built railway tunnel is presented. The field test was implemented to monitor the secondary lining due to the significant cracking behaviors influenced the stability and health of the tunnel structure. Surface strain gauges were installed for monitoring the status of crack openings, and the monitoring outputs demonstrated that the cracks were still in the developing stage. Additionally, adjacent tunnel and poor condition of surrounding rock were identified as the causes of the lining cracking by systematically characterizing the crack spatial distribution, tunnel site and surrounding rock conditions. Reconstruction of partial lining and reconstruction of the whole secondary lining were designed as the maintenance projects for different cracking regions based on the construction feasibility. For assessing the health conditions of the reinforced lining, embedded strain gauges were set up to continuously measure the strain and the internal force of the reconstructed structures. For the partially reconstructed lining, the outputs show the maximum tensile elongation is 0.018 mm during 227 days, which means the structure has no obvious deformation after maintenance. The one-year monitoring of full-section was implemented in the other two completely reconstructed cross-sections by embedded strain gauge. The outputs show the reconstructed secondary lining has undertaken the pressure of surrounding rock with the time passing. According to the calculated compressive and tensile safety factors, the completely reconstructed lining has been in reliable and safe condition during the past year after reinforcement. It can conclude that the aforementioned maintenance projects can effectively ensure the stability and health of this tunnel.