• Title/Summary/Keyword: Installed performance

Search Result 2,743, Processing Time 0.03 seconds

Performance Analysis of the BIPV/T system by the performance Test- Part1. PV efficiency (실험을 통한 BIPV/T 시스템 성능분석-1. PV 발전효율)

  • Lee, Hyeon-Ju;Jo, Hye-Jin
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2012.03a
    • /
    • pp.445-450
    • /
    • 2012
  • BIPV/T (Building Intergrated PhotoVoltaic/Thermal) is combined system produces electricity and thermal energy. The heat from PV modules should be removed for better electrical performance, and can be converted into useful thermal energy. The efficiency of the PV system's performance will raise by the system removes heat from the PV. The test system is installed to top floor of the experimental house in the KEPCO Research Institute. The planned experiment is following. (1) Supplying heat energy to top floor. (2) Supplying heat and cool energy to thermal storage in the bottom of the top floor. (3) Supplying heat energy to EHP for improved performance. The experimental performance is executed from 13th February to 13th March, 2012. The solar generation of electricity is 4.04kWh under the horizontal solar radiation is $1000W/m^2$ and the air temperature is $25^{\circ}C$.

  • PDF

The First Performance-based Structural Fire Design for Office Building in Korea

  • Min Jae Park
    • International Journal of High-Rise Buildings
    • /
    • v.12 no.3
    • /
    • pp.235-239
    • /
    • 2023
  • In this study, the fire resistance performance of the concrete-filled steel tube (CFT) columns and thin steel-plate composite (TSC) beams installed at a 20-story office building were designed using a performance-based structural fire design. Because of the lack of any specific provisions in the building code and guidelines for structural engineers about the performance-based approach, the only prescriptive approach has been selected for designing fire-resistant structures in Korea. To evaluate the fire resistance performance of the CFT columns and TSC beams, finite element analysis verified by the experimental results studied by several researchers was conducted with ABAQUS. From the fire scenario, the temperature distributions of the CFT columns and TSC beams were found via finite element analysis and the behaviors of the CFT columns and TSC beams were investigated in the structural field based on the temperature distribution.

Performance Analysis on the Ejector System in Flue-gas Discharge Channel of Marine Incinerator (소각기의 배기가스 유로에 이젝터를 적용한 시스템의 성능 분석)

  • Yun, Sang-Kook;Chang, Ho-Gil
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.35 no.6
    • /
    • pp.773-778
    • /
    • 2011
  • The International Maritime Organization(IMO) could try to adopt more severe amendment to prevent any air pollution from various waste materials by marine incinerator. This study is to analyse the performance improvement through Ansys CFD about new invented system which has three flue-gas discharge channels and sub-ejector installed in the dischage channel in order to evacuate flue-gas well from the combustion chamber. The results showed that the discharge temperature of flue-gas was below the regulated value of IMO by the multi-channels, and the sub-ejector system installed in the discharge channel was highly effective one to improve the flue-gas discharge ability.

Study on performance improved design of pressure-type ozone contactor in multistorey water treatment plant by CFD (CFD에 의한 수직형 정수처리 실증시설 내 압력식 오존접촉조 성능개선에 관한 연구)

  • Choi, Jong-Woong;Kim, Seong-Su;Kim, Jeong-Hyun;Kim, Kwanyeop
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.4
    • /
    • pp.431-440
    • /
    • 2014
  • The ozonation process has been widely used for drinking water disinfection around the world. Recently, the pressurized ozone contactor, in which the side stream typed ozone injection method is installed, has been applied to water treatment system. In this study, numerical calculations were conducted to compare prototype and screw-type ozone contactors based on hydraulic effectiveness in more details. The prototype ozone contactor was already installed and operated in domestic water treatment plant, and the screw-type is the suggested one for improving ozone contact efficiency installing the screw plate to the prototype. Screw turn numbers of screw plate were changed as 3, 5, 7 and 9, respectively for numerical simulation. The CT(concentration of disinfectant in mg/L times time in minutes) value was considered as one of the options for evaluating disinfection ability. From the results, it could be concluded that the performance of the screw-type is higher than that of the protype contactor by controlling the variable T as the tracer time. Also, Morill index of the screw-type(turn numbers = 5 ) appeared to be lower than the other.

Strength Method Using Pre-flexed Members for the Corner of Underground Box Structures under Additional Surface Load (추가 상재하중을 받는 지중박스구조물의 우각부에 대한 프리플렉스 부재를 이용한 보강공법)

  • Chung, Jee Seung;Lee, Jin Hyuk;Kim, Ki Am
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.5
    • /
    • pp.102-108
    • /
    • 2016
  • This paper presents a new strength method of underground box structures under additional surface load. An L-bracing using pre-flexed steel member threads called the "Pre-flex strength method" is used to improve capacity of the RC box structure under earth pressure due to additional surface load. The pre-flexed steel member is fixed the top and bottom of the structure after chemical anchor was installed by drilling hole on the box structure. The structural performance was evaluated analytically. 3 types of underground RC box structure were used; $2.0m{\times}2.0m$, $3.0m{\times}3.0m$ and $4.0m{\times}4.0m$. For the performance evaluation, structure analysis were performed on moment and shear resisting structures with and without pre-flex strength method. Numerical results confirmed that the proposed strength member system installed on underground RC box structures enhanced the strength capacity. The feasible region of the proposed pre-flex strength method in accordance with the earth pressure due to additional surface depth was evaluated.

Performance Evaluation of Air-to-Air Total Heat Transfer with Rotating Porous Plates (다공의 전열판이 내장된 공기 대 공기 전열교환기의 성능 평가)

  • Lim, T.W.;Cho, D.H.
    • Journal of Power System Engineering
    • /
    • v.11 no.2
    • /
    • pp.20-25
    • /
    • 2007
  • The performance of air-to-air heat exchanger has been investigated with rotating porous plates newly developed in this study. With an equal interval of 18 mm, the rotating porous plates are installed inside the heat exchanger where the hot and cold airs enter at opposite ends. When flowing in opposite directions by the separating plate installed in the center of the rotating porous plates, the airs give and receive the heat each other. Dry bulb temperature is set by adjusting heat supply at heater. In order to measure the temperature distribution of the hot air side inside heat exchanger, the thermocouples are inserted between the plates. The first location of thermocouple is 10mm downstream from the inlet of heat exchanger, and succeeding ten locations are aligned at an equal interval of 18mm. From the experiment of air-to-air heat exchanger with the rotating porous plates, the heat transfer rate increased as both air flow rate and RPM of the rotating porous plate increased. It was found that the overall heat transfer coefficient increased with the increase in RPM of porous plate at the conditions of the same air flow rate.

  • PDF

Performance-based comparison of energy pile of various heat exchange pipe arrangement by in-situ thermal response test (현장 열응답 시험을 통한 에너지파일의 열교환파이프 배열 방식에 따른 성능 비교)

  • Min, Sunhong;Koh, Hyungseon;Yoo, Jaihyun;Jung, Kyoungsik;Lee, Youngjin;Choi, Hangseok
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.196.1-196.1
    • /
    • 2011
  • In this study, a test bed was constructed in order to evaluate thermal efficiency of the energy pile which carries out combined roles of a structural foundation and of a heat exchanger. The energy pile in this study is designed as a large-diameter drilled shaft equipped with the heat exchange pipes which configures a W-shape and an S-shape. The drilled shaft reached to the depth of 60 m whilst the heat exchange pipes were installed to about 30 m deep from the ground surface. The W-shaped and S-shaped heat exchange pipes were installed in the opposite sections of the same drilled shaft. In-situ thermal response tests were performed for both the shapes of heat exchange pipes. To avoid underestimating the thermal performance due to hydration heat of concrete inside the drilled shaft, the in-situ thermal response tests for the energy pile were performed after four weeks since the installation of the energy pile.

  • PDF

Performance Evaluation of a Quarter Car Suspension System Installed with MR Damper Featuring Bypass Flow Holes in Piston (피스톤 바이패스 유로가 있는 MR 댐퍼 장착 1/4 차량 현가시스템의 성능평가)

  • Kim, Wan Ho;Hwang, Yong Hoon;Park, Jhin Ha;Shin, Cheol-Soo;Choi, Seung-Bok
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.27 no.1
    • /
    • pp.65-71
    • /
    • 2017
  • This work presents a comparative work on the ride comfort of a quarter car suspension system between two different magneto-rheological (MR) dampers; one is conventional type without bypass hole and the other is featured by several bypass holes in the piston. As a first step, two different MR dampers are designed on the basis of the governing equation and manufactured with same geometric dimensions except the bypass holes. After investigating the field-dependent damping properties, two dampers are installed to the quarter car suspension system. The suspension model is then derived and a sky-hook controller is implemented to identify vibration control performance under random road. It is shown that the suspension system with MR damper featured by the bypass holes can provide much better ride quality than the case without the bypass holes. This is validated via experimental implementation.

A Study on the Performance of Ramp Tabs Asymmetrically Installed in the Supersonic Nozzle Exit (초음속 노즐 출구에 비대칭적으로 설치한 램프 탭의 성능 연구)

  • Kim, Kyoung-Rean;Ko, Jae-Myoung;Park, Jong-Ho
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.35 no.10
    • /
    • pp.934-939
    • /
    • 2007
  • Thrust vector control(TVC) is the method which generates the side force and moment by controlling the exhausting gas directly from the supersonic nozzle to change the trajectory of a missile quickly. In this paper, performance study on the tapered ramp tabs asymmetrically installed in the supersonic nozzle exhaust for the thurst vector control has been carried out using the supersonic cold flow system. To study the shock wave structure and location of the oblique shock wave produced by the ramp tab, the flow field visualization using the schlieren system is conducted. This paper provides the thrust spoilage, three directional forces and moments and distribution of surface pressure on the region enclosed by the tapered ramp tabs.

Greenhouse Heating Technology Development by using Riverbank Filtration Water (강변여과수를 이용한 온실난방기술 개발)

  • Moon, Jong-Pil;Lee, Sung-Hyoun;Kwon, Jin-Kyung;Kang, Youn-Ku;Ryou, Young-Sun;Lee, Su-Jang
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.6
    • /
    • pp.145-152
    • /
    • 2011
  • In order to heat greenhouse nearby river channel, riverbank filtration water source heat pump was developed for getting plenty of heat flux from geothermal energy. Recharging well, thermal storage tank with separating insulation plate and filtering tank for eliminating iron, manganese were mainly developed for making the coefficient of performance (COP) of heat pump higher. Heating system using riverbank filtration water source heat pump was installed at a paprika greenhouse in the Jinju region where a single fold of vinyl cover and 2 layers of horizontal thermal curtain were installed as a part of temperature keeping and heat insulation with a greenhouse area of 3,185 $m^2$. 320,000 kcal/h was supplied for performing a site application tests. A greenhouse heating test was performed from Feb. 1, 2011 to Apr. 30, 2011. As the result of that, COPh of the heat pump was measured in the range of 4.0~4.5, while COPS of the system was represented as 2.9~3.3. COP measured of the heat pump was very good and well responded to indoor heating temperature of the environment control system of a greenhouse.