• Title/Summary/Keyword: Installed performance

Search Result 2,743, Processing Time 0.031 seconds

A Study on Flow Characteristics with the Installed Location Change of Mechanical Deflector (기계적 편향판 설치위치의 변화에 따른 유동특성에 대한 연구)

  • Kim, Kyoung-Ryun;Park, Jong-Ho
    • The KSFM Journal of Fluid Machinery
    • /
    • v.18 no.5
    • /
    • pp.49-53
    • /
    • 2015
  • Thrust vector control is the method which generates the side force and roll moment by controlling exhausted gas directly in a rocket nozzle. TVC is classified by mechanical and fluid dynamic methods. Mechanical methods can change the flow direction by several objects installed in a rocket nozzle exhaust such as tapered ramp tabs and jet vane. Fluid dynamic methods control the flight direction with the injection of secondary gaseous flows into the rocket nozzle. The tapered ramp tabs of mechanical methods are used in this paper. They installed at the rear in the rocket nozzle could be freely moved along axial and radial direction on the mounting ring to provide the mass flow rate which is injected from the rocket nozzle. TVC of the tapered ramp tabs has the potential to produce both large axial thrust and high lateral force. We have conducted the experimental research and flow analysis of ramp tabs to show the performance and the structural integrity of the TVC. The experiments are carried out with the supersonic cold flow system and the schlieren graph. This paper provides to analyze the location of normal shock wave and distribution of surface pressure on the region enclosed by the tapered ramp tabs.

Online Strain Measurement at Multiple Points on a Rotating Blade with Fiber Bragg Grating Sensors and a Rotary Optical Coupler (광섬유 격자 센서와 회전 광학 커플러를 사용한 회전하는 블레이드 여러 지점에서의 온라인 변형률 측정)

  • Lee, Jong-Min;Hwang, Yo-Ha
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.32 no.1
    • /
    • pp.77-82
    • /
    • 2008
  • Strain-gauges have been dominantly used to measure strain at various points on a rotor, however, either a slip ring or telemetry has to be used to send sensor signals to data acquisition instruments at stationary side. Both slip ring and telemetry have numerous inherent problems which force severe limitations in real applications. This paper introduces a new rotor condition monitoring system using FBG(Fiber Bragg Grating) sensors and a rotary optical coupler. A single optical fiber with many FBG sensors is installed on the rotor and an optical dynamic interrogator is installed at stationary side. The sensor signal connection between rotating part and stationary part is made by the rotary optical coupling method which makes use of light's unique characteristic-light travels through space. Broad band light source from the interrogator travels to the optical fiber on the rotor and reflected FBG sensor signals travel back to the optical fiber on stationary side and are connected to the interrogator. Rotary optical coupler's insertion loss change due to rotation is compensated by using a reference sensor installed at the center of the rotor. The proposed system's performance has been successfully demonstrated by accurately measuring strains at 5 points on a blade rotating at high speed.

Combustion Optimization of Diesel 2.0 Liter Class Engine with 8-hole Injector Nozzle (8홀 노즐을 적용한 2리터 급 디젤 엔진 연소 최적화)

  • Kwon, Soon-Hyuk;Kim, Min-Su;Choi, Min-Seon;Cho, Sung-Hwan
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.16 no.3
    • /
    • pp.73-79
    • /
    • 2008
  • Atomization speed of diesel fuel injected from 8-hole nozzle is faster than that of 7-hole nozzle because the hole diameter of 8-hole nozzle is smaller than that of 7-hole nozzle. But both insufficient distance between the fuel sprays and short penetration of injected sprays through 8-hole nozzle hole cause many harmful effects on combustion. In this study, we installed the 8-hole injectors to diesel 2.0 liter class engine, and optimized in-cylinder swirl and penetration via selecting and matching proper cylinder head and combustion bowl. Through this process, we found out the performance and emission potential of 8-hole nozzle installed engine are better than those of 7-hole nozzle installed one.

Performance characteristics of a multi-directional underwater CCTV camera system to use in the artificial reef survey (인공어초 조사용 다방향 수중 CCTV 카메라 시스템의 성능 특성)

  • Lee, Dae-Jae
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.47 no.2
    • /
    • pp.146-152
    • /
    • 2011
  • Underwater CCTV camera systems are increasingly replaced the traditional net approach of assessing the species, numbers and aggregation patterns of marine animals distributing around the artificial reefs installed in the inshore fishing grounds, in particular, in relation to the biological investigation of behavior and distribution patterns of target fishes. In relation to these needs, we developed a multi-directional underwater CCTV camera system to use in detecting and tracking marine animals in the artificial reef ground. The marine targets to be investigated were independently tracked by using a camera module toward the bottom and four camera modules installed in the interval of $90^{\circ}$ in horizontal plane and inclination of $45^{\circ}$ in vertical plane of the CCTV system without the overlap of video frames by each camera module. From the results of several field tests at sea, we believe that the developed multi-directional underwater CCTV camera system will contribute to a better understanding in evaluating the effect of artificial reefs installed in the inshore fishing grounds.

Load Transfer Capacity for the Planar Joints between Existing Slab Retrofitted with Carbon Fiber Plate and New Slab (탄소판으로 보강된 기존 슬래브와 신규 슬래브 접합부의 횡방향 하중전달 능력)

  • Kim, Seung Hun;You, Young Chan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.2
    • /
    • pp.117-124
    • /
    • 2007
  • An experimental research has been performed to evaluate the load transfer capacity for the planar joints between existing and new slab in an apartment remodelling constructions expecially for enlarging the interior space. Post-installed dowel bars were used as a joint connector. The existing slabs were obtained from the existing apartment housing which will be demolished, and were retrofitted with carbon fiber plate. Test results showed that the planar joints with post-installed dowel bars behaved in full composite modes until ultimate capacity of test specimens, so sufficient ultimate and serviceability performance are confirmed.

Control Method to Ensure Uniform Exhaust Function by Household of Apartment House (공동주택의 세대별 균등 배기량을 확보 하는 제어방법에 관한 연구)

  • Kwon, Yong-Il
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.12
    • /
    • pp.628-637
    • /
    • 2017
  • This study was conducted to present an effective control method for the common duct system to uniformly discharge volume flow rate exhausted from the kitchen and bathroom of each household in an apartment regardless of the position of household. Since the common duct system is installed vertically and the ventilator is installed in the terminal, the static pressure of each household decreases when vertical height increases. Therefore, the volume flow rate exhausted from each household is different. In order to improve such a phenomenon, a constant air volume damper shall be installed in a branch duct coupled with a common vertical duct system. The selected ventilator should also be able to handle the maximum volume flow rate considering diversity factor. Therefore, a uniform volume flow rate must be exhausted from all households where the hood is operated. This paper mainly focuses on suggestion of an optimum exhaust control method by comparing exhaust performance of each household according to the presence or absence of a constant air volume damper.

Sensing Characteristics of Fire Detectors in Railway Tunnel by Using Numerical Analysis (수치해석을 이용한 화재감지기 철도터널 화재 감지특성 연구)

  • Park, Won-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7964-7970
    • /
    • 2015
  • In enclosed areas such as railway tunnels, the heat and smoke generated by a fire can pose a tremendous risk to the life of passengers. To prevent or mitigate such scenarios, fire detectors are installed for early fire detection. This numerical study is preformed for establishing the method of detecting performance of fire detectors installed on railway tunnels. Numerical analysis are conducted using the fire dynamics simulator, developed by the NIST. The temperature of the tunnel walls is determined using the assumed exterior structure of the tunnel. In addition, the detection times of detectors installed at different locations in the tunnel are obtained for different sizes of the fire source, and the results are compared and analyzed.

A Study on Estimation of Breakdown Location using UHF Sensors for Gas Insulated Transmission Lines (UHF센서를 이용한 가스절연송전선로 절연파괴 위치 추정에 관한 연구)

  • Park, Hung-Sok;Han, Sang-Ok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.4
    • /
    • pp.805-810
    • /
    • 2011
  • This paper deals with the method and algorithm used to find fault locations in gas insulated transmission line. The method uses UHF sensors and digital oscilloscope to detect discharge signals emitted to the outside through insulating spacer in the event of breakdown inside GIL. UHF sensors are the external type and installed at outside of insulating spacers of GIL. And we used wavelet signal processing to analyze the discharge signals and confirm the exact fault location findings in the GIL test line. This method can overcome demerit of TDR(Time Domain Reflectometer) method having been applied to detect fault location for conventional underground transmission lines, and Ground Fault Sensors used in conventional GIS systems. TDR method requires high level of specialty and experience in analyzing the measured signals. Ground fault sensors are installed inside GIL and can be destroyed by high transient voltage. This paper's method can simplify the fault location process and minimize the damage of sensors. In addition, this method can estimate the fault location only by the time difference when discharge signals are arrived to detecting sensors at the ends of GIL sections without reasons of breakdown. To test the performance of our method, we installed sensors at the ends of test line of GIL(84m) and sensed discharge signals occurred in GIL, energized with AC voltage generator up to 700kV.

The Development of an Automatic Dynamic Inspection System of a Balance Shaft Module (밸런스 샤프트 모듈 자동 동적검사 시스템 개발)

  • Seong, Eun-Je;Kang, Dae-Gyu;Jeong, Chan-Yong;Han, Chang-Soo;Kim, Myung-Soo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.1231-1236
    • /
    • 2007
  • Balance Shaft Module is module parts that is installed to vehicles engine to reduce noise and vibration of vehicles engine. Balance Shaft Module's performance exerts important influence on performance of engine. Therefore, must be able to warrant quality and performance of Balance Shaft Module. Existing product found and revised error at continuous process of production, and estimated failure mode in Balance Shaft Module. Previous method hard to secure product that performance is excellent, and bring a lot of damages economically. Therefore, development of inspectin system for quality inspection of parts and performance test of assembly is essential in Balance Shaft Module. In this study, represented development process of automatic dynamic inspection system to test performance and detect breakdown of Balance Shaft Module that is producing in Dongbo.

  • PDF

Performance Analysis of the BIPV/T system by the performance Test- Part2. Thermal Performance (실험을 통한 BIPV/T 시스템 성능분석-2.시스템 열성능)

  • Jo, Hye-Jin;Lee, Hyeon-Ju
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2012.03a
    • /
    • pp.255-259
    • /
    • 2012
  • BIPV/T (Building Intergrated PhotoVoltaic/Thermal) is combined system produces electricity and thermal energy. The heat from PV modules should be removed for better electrical performance, and can be converted into useful thermal energy. The test system is installed to top floor of the experimental house in the KEPCO Research Institute. The experimental performance is executed from 13th February to 13th March, 2012. The expected system's thermal performance is 1.9kWh under the horizontal solar radiation is $600W/m^2$ and the air flow in the system is $20CMH/m^2$.

  • PDF