• Title/Summary/Keyword: Installation of wind Farm

Search Result 51, Processing Time 0.026 seconds

Comparative evaluation of different offshore wind turbine installation vessels for Korean west-south wind farm

  • Ahn, Dang;Shin, Sung-chul;Kim, Soo-young;Kharoufi, Hicham;Kim, Hyun-cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.9 no.1
    • /
    • pp.45-54
    • /
    • 2017
  • The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west-south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane ${\cdots}$ etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west-south wind farm.

A Study on the Application of DC HTS cable systems to enhance power transfer limits of a grid-connected offshore wind farm

  • Hur, Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.2
    • /
    • pp.97-103
    • /
    • 2015
  • This paper introduces two on-going projects for DC high temperature superconducting (HTS) cable systems in South Korea. This study proposes the application of DC HTS cable systems to enhance power transfer limits of a grid-connected offshore wind farm. In order to develop the superconducting DC transmission system model based on HTS power cables, the maximum transfer limits from offshore wind farm are estimated and the system marginal price (SMP) calculated through a Two-Step Power Transfer (TSPT) model based on PV analysis and DC-optimal power flow. The proposed TSPT model will be applied to 2022 KEPCO systems with offshore wind farms.

Short-term Wind Farm Power Forecasting Using Multivariate Analysis to Improve Wind Power Efficiency (풍력발전 설비 효율화를 위한 다변량 분석을 이용한 풍력발전단지 단기 출력 예측 방법)

  • Wi, Young-Min
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.7
    • /
    • pp.54-61
    • /
    • 2015
  • This paper presents short-term wind farm power forecasting method using multivariate analysis and time series. Based on factor analysis, the proposed method makes new independent variables which newly composed by raw independent variables such as wind speed, ramp rate, wind power. Newly created variables are used in the time series model for forecasting wind farm power. To demonstrate the improved accuracy, the proposed method is compared with persistence model commonly used as reference in wind power forecasting using data from Jeju Island. The results of case studies are presented to show the effectiveness of the proposed forecasting method.

A Study on the Power Loss Cost of Inner-Grid in the Offshore Wind Farm (해상풍력단지 내부그리드의 전력손실비용에 관한 연구)

  • Shin, Je-Seok;Kim, Sung-Yul;Bae, In-Su
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.3
    • /
    • pp.72-77
    • /
    • 2014
  • The cross-section area of cable in the Offshore Wind Farm (OWF) is smaller than that in the onshore wind farm. Because the power loss in OWF is large relatively, the power loss is a key element for the economic evaluation of OWF design. The availability of wind turbine in OWF and the size of OWF are larger than those of onshore wind farm. If the economic evaluation of OWF ignores the availability of wind turbines, the power loss cost of OWF is overpriced. Since there are so many wind turbines, also, the calculation of power loss should be more accurate. In this paper, a method to calculate power loss is proposed for the design of big and complex inner-grid in OWF. The 99.5MW OWF is used for case study to see what effect the proposed method have on the power loss cost.

A Study About Grid Impose Method On Real-Time Simulator For Wind-Farm Management System (풍력발전단지 관리·분석 시스템의 Real-Time Simulator 도입을 위한 계통모델 연동방안 연구)

  • Jung, Seungmin;Yoo, Yeuntae;Kim, Hyun-Wook;Jang, Gilsoo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.7
    • /
    • pp.28-37
    • /
    • 2015
  • Owing to the variability of large-scaled wind power system, the development of wind farm management technologies and related compensation methods have been receiving attention. To provide an accurate and reliable output power, certain wind farm adopts a specified management system including a wind prediction model and grid expectation solutions for considering grid condition. Those technologies are focused on improving the reliability and stability issues of wind farms, which can affect not only nearby system devices but also a voltage condition of utility grid. Therefore, to adapt the develop management system, an expectation process about voltage condition of Point of Common Coupling should be integrated in operating system for responding system requirements in real-time basis. This paper introduce a grid imposing method for a real-time based wind farm management system. The expected power can be transferred to the power flow section and the required quantity about reactive power can be calculated through the proposed system. For the verification process, the gauss-seidel method is introduced in the Matlab/Simulink for analysing power flow condition. The entire simulation process was designed to interwork with PSCAD for verifying real power system condition.

Installation of Suction Caisson Foundation for Offshore Wind Turbine : Model Test (해상풍력타워 석션기초의 설치시 거동에 대한 모형 시험 연구)

  • Kim, Dong-Joon;Kim, Su-Rin;Choo, Yun-Wook;Kim, Dong-Soo;Lee, Man-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.825-839
    • /
    • 2010
  • The global and domestic market for offshore wind farm is expected to grow fast, and the design and installation of substructure and foundation is getting more important. As for the offshore wind farms located in the shallow(depth < 20m) water, the construction and installation of the substructure and foundation makes up about 1/4 ~1/3 of the offshore wind farm construction cost, and the portion is expected to increase because the turbine capacity is increasing from 2 ~ 3MW to 5MW or larger and the water depth of wind farms is also increasing over 30m. As a foundation for offshore wind turbine, the suction caisson foundation is being considered to be a highly competitive alternative to the conventional monopile or gravity based structure, because it has features suitable for the offshore construction such as quick installation, no heavy equipment for penetration and no hammering noise for driving. In order to study the installation behaviour of the suction caisson, laboratory tests were performed with sand. The pore water pressure and displacement were measured to analyze the suction pressure during penetration, the penetration speed and the amount of heaving.

  • PDF

Installation Scheduling for the Development of Southwest Coast 2.5GW Offshore Wind Farm (서남해안 2.5GW 해상풍력단지 조성을 위한 설치 일정계획)

  • Ko, Hyun-Jeung
    • Journal of Korea Port Economic Association
    • /
    • v.33 no.2
    • /
    • pp.83-96
    • /
    • 2017
  • As a way to address global warming, among the renewable energy sources, there have been heavy investments worldwide for the development of offshore wind farms. However, such development has a drawback: investment costs are higher than those for onshore wind farms due to required operations such as offshore transportation and installation. In particular, delays in installation due to adverse maritime weather conditions are factors that affect the economics of offshore wind farms' operation. Therefore, in this study, we analyze the optimal schedule of the construction of an offshore wind farm from a macro perspective by considering the weather conditions in Korea. For this purpose, we develop a mathematical model and apply it to a 2.5 GW offshore wind farm project on the southwestern coast of the country. We use data from the Korea Meteorological Agency for maritime weather conditions and attempt to reflect the actual input data based on precedent cases overseas. The results show that it takes 6 months to install 35 offshore wind turbines. More specifically, it is pointed out that it is possible to minimize costs by not working in winter.

Technical Trend of Radar Radio Interference Reduction Relating to Construction of the Offshore Wind Farm (해상 풍력발전단지 조성에 따른 레이더 전파간섭 저감 기술동향)

  • Kim, Young-Dal;Jeong, Yun-Mi;Lee, Dae-Dong
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.27 no.4
    • /
    • pp.250-256
    • /
    • 2014
  • The wind power generation is an eco-friendly clean energy that produces almost zero $CO_2$ emission, and has a good economic feasibility. As for the location, the installation of large turbines and construction of large-scale wind farm is easier on the offshore than on the land. In Korea, it is inevitable to generate offshore wind power through the offshore wind farm, and the radio interference of larger wind power generators and offshore wind power farm to broadcasting, communication and radars is becoming a core issue for constructing the offshore wind farm. In this study, the wind power generation status and rotor blade technology trend were presented, along with the technical trend of radar radio interference reduction relating to construction of the offshore wind farm.

Factors Influencing Critical Clearing Time in Network Connected to Wind Generation System (풍력발전시스템이 연계된 계통의 임계 제거시간에 미치는 요인)

  • Kim, Se-Ho;Kim, Ho-Chan;Yang, Ik-June
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.10
    • /
    • pp.41-46
    • /
    • 2006
  • Generation of electricity using wind power has received considerable attention worldwide in recent years. In order to investigate the impacts of the integration of wind farm into utilities' network, various studies have been investigated. One such impact is related to the Critical Clearing Time (CCT) of wind power generation system. This paper reports investigation into the factors that influence the transient behavior of the wind power generation system following network fault conditions. It is shown that CCT can be affected by various factors contributed by the network. Such factors include capacity of wind power, power factor, the length of the interfacing line, etc. This investigation is conducted on a simulated grid-connected wind farm using Digsilent Power Factory.