• Title/Summary/Keyword: Installation condition

Search Result 937, Processing Time 0.03 seconds

FBG sensor system for condition monitoring of wind turbine blades (풍력터빈 블레이드 상태 감시용 광섬유격자 센서시스템)

  • Kim, Dae-Gil;Kim, Hyunjin;Song, Minho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.8
    • /
    • pp.75-82
    • /
    • 2013
  • We propose a fiber grating sensor system for condition monitoring of large scale wind turbine blades. For the feasibility test of the proposed sensor system, a down-scaled wind turbine has been constructed and experimented. Fiber grating sensors were attached on a blade surface for distributed strain and temperature measurements. An optical rotary joint was used to transmit optical signals between the FBG sensor array and the signal processing unit. Instead of broadband light source, we used a wavelength-swept fiber laser to obtain high output power density. A spectrometer demodulation is used to alleviate the nonlinear wavelength tuning problem of the laser source. With the proposed sensor system we could measure dynamic strain and temperature profiles at multi-positions of rotating wind turbine blades.

Analysis of Domestic Apply Actual Condition about the Facilities of Amusement Electric Train (유희용전차의 시설에 관한 국내적용실태 분석)

  • Kim, Han-Sang;Kim, Chong-Min;Kim, Gi-Hyun
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.05a
    • /
    • pp.326-329
    • /
    • 2004
  • The electric train is a kind of amusement ride and it is installed in a lot of amusement parks. The object of this study was to analyze and to find out of problem about electrical facilities of amusement electric train. For the purpose of this study, we give careful consideration to the technical standard to be Notification of the Ministry of Commerce, Industry and Energy and foreign electrical codes and we carried out an actual condition investigation on twelve amusement electric trains from among domestic amusement parks. As a result, we could how that there is discrepancy between the electrical regulations and the actual condition.

  • PDF

The Actual Condition Analysis of Play Space by Types of Installation for the Planning of Barrier Free Play Space (무장애 놀이공간 계획을 위한 설치유형별 놀이공간 실태분석 - 무장애 놀이공간의 계획기준 설정 및 모형개발 연구 I -)

  • Kang, Byoung-Keun;Seong, Ki-Chang;Park, Kwang-Jae;Yun, Young-Sam;Kim, Sang-Woon;Kim, Eun-Kyung;Lee, Ki-Jeong
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.15 no.4
    • /
    • pp.23-31
    • /
    • 2009
  • The needs of integrated play and space for both healthy children and children with Disabilities is increasing due to positive effect of integrated play. However, existing plan of play space have not considered children with Disabilities as the user and Integrated Perspective what children and children with Disabilities can do together is insufficient. For these reasons, establishing guideline of the Barrier Free Play Space and Model Development is required to meet the New Paradigm's demands. The purpose of this research is to deduce present condition and problem of play space through the Actual Condition Analysis of domestic Play Space. This study have given careful consideration to the actual condition of play space for 3 types by Types of Installation method. As a result, there are many problems from research point of view and facilities for the disablilities too. Consequently, element of plan and facilities for the disabled which are problems should be shown the direction focused improvement, moreover major task is build a barrier free play space as a place of social integration.

  • PDF

Critical Limits of Commercial Diving on the Construction of Tidal Current Power in Jangjuk Channel (장죽수로 조류발전건설시 작업특성에 따른 산업잠수 작업한계)

  • Kim, Won-Seok
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.25 no.3
    • /
    • pp.733-742
    • /
    • 2013
  • The Korea has significant tidal current energy resources, but it is so hard to work underwater for tidal turbine installation. Therefore commercial diving work is very important for tidal current generator. Also, Jangjuk channel is vary famous as proper area to generate tidal current energy. Nevertheless, no one is studied about characteristics of commercial diving works with installation of tidal current generator. The purpose of this study is to introduce commercial diving with work types and investigate critical limits of diving working under the conditions, which are working only to minutes at slack tide during the neap tide. As the results, work types are five as like mooring installation, OMAS(Offshore Maintenance Access System), support structure installation, cable and turbine installation. Here, the original construction period is expected about 4 months, but the construction take 18 months to complete. The cause of extends construction period is insufficiency of researching tidal current conditions at the site and ignorance of slack tide which need to secure diving working time. Total diving working times are 110th during 18 months, the highest percentage of diving times is turbine installation about 43.6 %, and cable, mooring installation and support structure construction are 27.3 %, 15.5 %, 13.6 %, respectively. On the basis of this study, estimation of times of commercial diving is possible with work types of tidal current power, and has a significance as basic data to determining construction period.

Installation Status of Information Facilities and Condition of Walking Road Influencing to Psychological Safety of Walking Tourists - Focusing on the Course No. 16 of Jeju Olle Trail, Sarabong·Byeoldobong Walkway in Jeju and the Course No. 8 of Bougil, Gyeongpo Lake Walkway in Gangneung - (도보여행자의 심리적 안전에 영향을 미치는 도보길 환경과 정보시설물의 설치 현황 - 제주올레 16코스와 사라봉·별도봉 산책로, 강릉바우길 8구간과 경포호 산책로를 대상으로 -)

  • Byun, Kyeonghwa;Kim, Young-duk
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.18 no.3
    • /
    • pp.25-34
    • /
    • 2016
  • The purpose of this study is to investigate installation status of information facilities and condition of walking road influencing to psychological safety of walking tourists. For this purpose, four roads for walking tour are selected; the course no. 16 of Jeju Olle Trail, Sarabong Byeoldobong walkway in Jeju and the course no. 8 of Bougil, Gyeongpo Lake walkway in Gangneung. Facilities installed on roads for walking tour are classified into four facilities; safety facility, information facility, amenity facility, local cultural facility. In order to consider installation status of information facilities and condition of walking road influencing to psychological safety of walking tourist, a field experiment was conduced focusing on the course no. 16 of Jeju Olle Trail. Thirteen cases were happened as confusing situation while walking tour. Of the 13 cases, the situation of being lost and wandering on the trail accounted for six cases. In contrast to the expectation that the situation of being lost and wandering would occur only at a crossroads, it is not that such situation took place at specific places like a crossroads or where direction signs were inaccurate. Walking tourists of this field experiment also confronted situations of having lost confidence about continuing the ongoing direction, of having anxiety over walking a walking trail, of feeling discomfort caused by walking and of being offended by uncomfortable or messy areas of walking trial. These confusing situations are happened inappropriate installation of direction sign, so direction sign is needed to install more carefully and detailed.

Stability of hair-tail angling fishing boat according to the induction fishing lamp installation (인덕션 집어등을 설치한 갈치채낚기 어선의 복원성능)

  • Seongjae JEONG;Seongwook PARK;Myongkok JEONG;Geumcheol JEONG
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.59 no.1
    • /
    • pp.1-8
    • /
    • 2023
  • In this study, the stability of fishing boat inducing the change of fishing lamp in accordance with the installation of induction lamp in comparison with metal halide lamp was investigated. Inclining test for 8.55 ton class of hair-tail angling fishing boat was performed in order to find a GM and light weight. A stability calculation of the target fishing boat on the basis of KST-SHIP program was evaluated. The stability of the fishing boat with a metal halide lamp such as induction lamp according to the result obtained by the inclining test is slightly different, and the stability is not so much affected. Due to the induction lamp installation, the wind area increased by about 3.178 m2. Before installing the induction fishing lamp, G0M was found to be 0.209 at full load departure and 0.296 at departure from fishing ground. After installing the induction lamp, the full load departure condition is 0.178 and the fishing ground departure condition is 0.260. The G0M value before and after installation of the induction fishing lamp shows a difference of about 3% at the full load departure condition. The value of the critical angle of inclination definition showed a difference of about 16%. Despite these differences, it is lower than the regulations; it was confirmed that there will be no significant difference unless it is in an overloaded state.

A Study About Grid Impose Method On Real-Time Simulator For Wind-Farm Management System (풍력발전단지 관리·분석 시스템의 Real-Time Simulator 도입을 위한 계통모델 연동방안 연구)

  • Jung, Seungmin;Yoo, Yeuntae;Kim, Hyun-Wook;Jang, Gilsoo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.7
    • /
    • pp.28-37
    • /
    • 2015
  • Owing to the variability of large-scaled wind power system, the development of wind farm management technologies and related compensation methods have been receiving attention. To provide an accurate and reliable output power, certain wind farm adopts a specified management system including a wind prediction model and grid expectation solutions for considering grid condition. Those technologies are focused on improving the reliability and stability issues of wind farms, which can affect not only nearby system devices but also a voltage condition of utility grid. Therefore, to adapt the develop management system, an expectation process about voltage condition of Point of Common Coupling should be integrated in operating system for responding system requirements in real-time basis. This paper introduce a grid imposing method for a real-time based wind farm management system. The expected power can be transferred to the power flow section and the required quantity about reactive power can be calculated through the proposed system. For the verification process, the gauss-seidel method is introduced in the Matlab/Simulink for analysing power flow condition. The entire simulation process was designed to interwork with PSCAD for verifying real power system condition.

A Study on the Integrated Simulation and Condition Monitoring Scheme for a PMSG-Based Variable Speed Grid-Connected Wind Turbine System under Fault Conditions (PMSG 적용 가변속 계통연계형 풍력발전 시스템의 통합 시뮬레이션 및 스위치 개방고장 진단기법 연구)

  • Kim, Kyeong-Hwa;Song, Hwa-Chang;Choi, Byoung-Wook
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.3
    • /
    • pp.65-78
    • /
    • 2013
  • To analyze influences under open fault conditions in switching devices, an integrated simulation and condition monitoring scheme for a permanent magnet synchronous generator (PMSG) based variable speed grid-connected wind turbine system are presented. Among various faults in power electronics components, the open fault in switching devices may arise when the switches are destructed by an accidental over current, or a fuse for short protection is blown out. Under such a faulty condition, the grid-side inverter as well as the generator-side converter does not operate normally, producing an increase of current harmonics, and a reduction in output and efficiency. As an effective way for a condition monitoring of generation system by online basis without requiring any diagnostic apparatus, the estimation schemes for generated voltage, flux linkage, and stator resistance are proposed and the validity of the proposed scheme is proved through comparative simulations.

The Study of Installing Platform Screen Doors (PSD) by using SWOT Analysis (SWOT 분석을 통한 스크린도어 설치에 대한 연구 - 수도권 전철을 중심으로 -)

  • Park, Min-Seo;Koh, Sung-Won;Koo, Ja-Kyung;Lee, Tai-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1587-1593
    • /
    • 2008
  • After the incendiary fire accident at Daegu subway, discussion of PSD installation started to prevent accident from fall. safety accident and big accident. Following these paradigm, the purpose of the study is to analyze the present condition of current installation of PSD in our country and suggest an improvement scheme for the future PSD operation extension. Using the SWOT analysis and we analyze the inner and outer capability of PSD installation. We try to find a counter plan strategy for PSD installation improvement scheme through the analysis.

  • PDF

Analysis of Axial Capacity and Constructability of Helical Pile with Inner Cone Penetration (내부 콘 항타를 적용한 헬리컬 파일의 지지력 및 시공성 분석)

  • Lee, Jun-Ho;Lee, Kicheol;Kim, Dongwook
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.4
    • /
    • pp.1-11
    • /
    • 2017
  • In this study, 1/6 small-scale model tests of helical piles were conducted to evaluate their installation time and ultimate capacities. Model sand layers were constructed using sand pluviating method to produce uniform soil relative density. For installation of different helical piles varying locations (vertical center-to-center spacings of 50 mm and 150 mm) of helix plates, two different rotation speeds of 15 rpm and 30 rpm were implemented. Cone penetration equipment was installed within the hallow section of the helical pile to increase ultimate capacity of helical pile and to evaluate soil properties of plugged soils and soils below pile tip after installation of the piles. Based on the test results, the most fasted installation was possible under the condition of "rotation speed of 30 rpm and center-to-center spacing of 50 mm", and the highest ultimate capacity was mobilized under the condition of "rotation speed of 30 rpm and center-to-center spacing of 150 mm with cone penetration implementation."