Technology and market for Concentrated PV module (집광형 태양광 모듈 기술 및 시장현황)

  • Ryu, Sehwan
    • Proceedings of the KIPE Conference
    • /
    • 2012.07a
    • /
    • pp.605-606
    • /
    • 2012
  • The cost of a PV(Photovoltaic) installation are driving the market and the need for subsidized schemes, such as feed-in tariffs. Concentrated photovoltaic(CPV) is leading the development of future low cost renewable energy sources. CPV is offering high efficiency systems. This paper proposes technology and market for CPV.

  • PDF

A Comparative Analysis of Life Cycle Cost on the Window Glass and the Insulation Film Coated Glass for Window (창호 유리의 단열필름 시공에 따른 생애주기비용 비교 분석)

  • Jeong, Mingu;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.583-590
    • /
    • 2014
  • The purpose of this study is to analyze and compare the life cycle cost of window glass with insulation film and regular glass, to verify an economical window construction method. As an approach method, the thermal performance data of each type of glass was measured using Window 6.3 and ECO2-OD Simulation Program, applied it to the case building to calculate the air conditioning and heating maintenance costs and LCC, and compared the economic feasibility. As a result, installing an additional insulation film prevents the solar heat penetration in the summer, so it reduces the cooling cost, on the other hand, it increased heating cost in winter. From the life cycle cost perspective, the effect of cooling cost reduction does not counterbalance the increase in heating cost and the additional cost from film installation and repair; therefore, the installation of insulation film may not be a proper method.

Study on Installation Capacities of Wastewater Reclamation and Reusing System Applying to Contact Aeration Process using Cost-benefit Analysis (경제성분석을 이용한 접촉폭기방식 중수도의 설치규모분석에 관한 연구)

  • Nam, Young-Woo;Park, Tae-Uk
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.22 no.11
    • /
    • pp.1945-1954
    • /
    • 2000
  • This study provides economical installation capacities for wastewater reclamation and reusing system in 7 areas of South Korea applying to contact aeration process using NPV(net present value) model based on cost-benefit. First. considering only private benefits. economical installation capacities for wastewater reclamation and reusing system applying to contact aeration process in household use were more than $500m^3/day$ in Pusan. $1,000m^3/day$ in Taegu. $2,000m^3/day$ in Kwangju. However. installation capacities in Seoul. Inchen, Taejon, and Ulsan were not optimal for $3,000m^3/day$. Therefore, supply ways of wastewater reclamation and reusing system in household use in the latter areas were more optimal local recirculation system than individual recirculation system. Economical installation capacities for wastewater reclamation and reusing system in business use were more than $100m^3/day$ in Seoul. Pusan. and Kwangju and which were $300m^3/day$ in Taegu, Inchen, Taejon, and Ulsan. Economical installation capacities for wastewater reclamation and reusing system in commercial use were more than $100m^3/day$ in Seoul, Pusan, Taegu, Kwangju, Taejon, and Ulsan, and which were $300m^3/day$ in Inchen. Second, considering only social benefits. economical installation capacity for wastewater reclamation and reusing system applying to contact aeration process was more than $100m^3/day$.

  • PDF

A Study on the Power Loss Cost of Inner-Grid in the Offshore Wind Farm (해상풍력단지 내부그리드의 전력손실비용에 관한 연구)

  • Shin, Je-Seok;Kim, Sung-Yul;Bae, In-Su
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.3
    • /
    • pp.72-77
    • /
    • 2014
  • The cross-section area of cable in the Offshore Wind Farm (OWF) is smaller than that in the onshore wind farm. Because the power loss in OWF is large relatively, the power loss is a key element for the economic evaluation of OWF design. The availability of wind turbine in OWF and the size of OWF are larger than those of onshore wind farm. If the economic evaluation of OWF ignores the availability of wind turbines, the power loss cost of OWF is overpriced. Since there are so many wind turbines, also, the calculation of power loss should be more accurate. In this paper, a method to calculate power loss is proposed for the design of big and complex inner-grid in OWF. The 99.5MW OWF is used for case study to see what effect the proposed method have on the power loss cost.

A Study on Reliability Evaluation for Constructing Inner Grid of Offshore Wind Farm (해상풍력단지의 내부 계통망 구성을 위한 신뢰도 평가에 관한 연구)

  • Bae, In-Su;Shin, Je-Seok;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.11
    • /
    • pp.89-95
    • /
    • 2013
  • In resent years, Offshore Wind Farm (OWF) is being actively developed. Typically, OWF has a better wind resource than onshore one, but also have a very high investment cost and maintenance cost. Furthermore, due to a difficulty of geographical access, OWF can be affected by the failure for a longer time. As the result, OWF has a higher loss cost. Therefore, a reliability evaluation should be performed more carefully at OWF planning stage. In this paper, a methodology for the reliability evaluation on inner grid is suggested. Inner grid connects wind turbines via submarine cables and transfers power to offshore substation. According to location of the faulted cable under layouts of inner grid, the transfer ability of inner grid is influenced. In order to indicate the transfer ability of inner grid, several indices are introduced such as PNDR, EEND and EENDC. To demonstrate the methodology described in this paper, diversity case studies were performed.

A Study on the Economic Analysis for Ballast Water Treatment System (선박 평형수 처리 장치의 선내 배치를 위한 경제성 평가 연구)

  • Kim, Soo-Young;Shin, Sung-Chul;Chung, Bo-Young;Jo, Jung-Hwa;Kang, Byung-Yoon
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.47 no.2
    • /
    • pp.258-264
    • /
    • 2010
  • Various kinds of ballast water treatment systems (BWTS) have been developed corresponding to reinforced IMO rules for marine environment. Some of them got the certificate of IMO and others are waiting for it. Selection of optimum BWTS is very important. Optimum BWTS means not only functional requirements but also economic efficiency. This paper presents economic analysis model for optimum BWTS according to ship type and size. In this study 10 kinds of BWTS whose initial installation cost and maintenance cost are known are analyzed based on present worth method. It is assumed that all BWTS satisfy minimum functional requirements and we need to consider different economical efficiency. Through the economic analysis we could select optimum BWTS.

Analysis on Voltage and Cost of Substation with PWM Rectifier in DC Traction Power Supply System (PWM 정류기를 적용한 직류급전시스템의 전압강하 및 비용 평가)

  • Kim, Joorak;Park, Kijun;Park, Chang-Reung;Choo, Eun-Sang;Lee, Jun-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.4
    • /
    • pp.640-645
    • /
    • 2015
  • Near surface transit system has should be constructed as installation cost of light rail transit with elevated track. So, distance between two substations is longer than conventional system. The long feeding distance results in severe voltage drop. This paper proposes a PWM rectifier instead of diode rectifier. The PWM rectifier has some advantages. This is able to control output voltage constantly to reduce voltage drop and to use regeneration power without additional inverter. This paper analyse on improved voltage profile and cost of substation with PWM rectifier. The analysis of voltage profile use PSIM, and the installation cost of substation with PWM rectifier is compared to substation with diode rectifier.

A Study on low-Cost Sensorless Drive of Brushless DC Motor for Compressor Using Random PWM (브리시리스 직류 전동기에 랜덤 PWM을 적용한 저가형 센서리스 드라이브에 관한 연구)

  • Lee, Seung-Gun;Kim, Dae-Kyong;Yang, Seung-Hak;Lim, Young-Cheol
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.10
    • /
    • pp.97-103
    • /
    • 2008
  • Recently, it is increased to apply sensorless drive for BLDC (Brushless DC) motor to household electrical appliances, especially in the refrigerators and air conditioners, to reduce the cost and the acoustic noise by the operation and to make their functions more comfortable for human beings. In this paper, low-cost sensorless drive for BLDE motor is implemented by random PWM (Pulse Width Modulation). The experimental results show that the electromagnetic noise was reduced and the sound quality was improved by BLDC motor sensorless random PWM Control.

A Study on the Adequate Capacity of Substation Transformer for Offshore Wind Farm (해상풍력발전단지의 해상변전소 변압기 적정 용량에 관한 연구)

  • Moon, Won-Sik;Jo, Ara;Huh, Jae-Sun;Bae, In-Su;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.8
    • /
    • pp.83-89
    • /
    • 2015
  • This study suggests the methodology to decide the number and adequate capacity of substation transformer in a large-scale offshore wind farm (OWF). The recent trend in transformer capacity of offshore substation is analyzed in many European offshore wind farm sites prior to entering the studies. In order to carry out the economic evaluation for the transformer capacity we present the cost models which consist of investment, operation, and expected energy not supplied (EENS) cost as well as the probabilistic wind power model of wind energy that combines the wind speed with wind turbine output characteristics for a exact calculation of energy loss cost. Economic assessment includes sensitivity analysis of parameters which could impact the 400-MW OWF: average wind speed, availability, discount rate, energy cost, and life-cycle.

Estimation of LCOE for Korean PV Projects : For the Ones that Financial Investors Participated in (한국 태양광발전사업의 에너지균등화비용(LCOE) 추정: 재무적투자자 참여사업을 대상으로)

  • Kim, Young-Kyung;Chang, Byung-Man
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.23-29
    • /
    • 2012
  • LCOE of 11 Korean PV projects, total capacity of 44 MW, were calculated for each project being larger than 1 MW respectively. 9 out of 11 projects were constructed in 2008 under FIT scheme revealed that average LCOE is 600 Korean Won per kilowatt-hour and it becomes reduced to 348 Korean Won per kilowatt-hour for 2 projects that are constructed under RPS scheme in 2012. During the period between 2008 and 2012, installation cost per megawatt became 55% of 2008 value with operation and maintenance cost lowered to 80% while LCOE became only 58% due to reduced project size and lower irradiation for later projects. However, it is found that the ratio of LCOE / unit installation cost looks relatively constant, so that it can be used as an auxiliary parameter to gauge learning effect of BOS portion of a PV project.