• Title/Summary/Keyword: Installation Cost

Search Result 1,176, Processing Time 0.025 seconds

Decision Making Process for Wind Barrier Installation Considering Car Accident Risk (차량사고 위험도를 고려한 방풍벽 설치기준)

  • Kim, Dong-Hyun;Lee, Il-Keun;Kwon, Soon-Duck;Jo, Byung-Wan
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.1
    • /
    • pp.17-26
    • /
    • 2010
  • This study presents a decision making process for installation of wind barrier which is used to reduce the wind acting on running vehicle on expressway. At the first stage of this study, the lateral deviations of running vehicles under side winds were computed from the commercial softwares, CarSim and TruckSim, and then the critical wind speeds for car accident were evaluated from predefined risk index. To determine whether it is needed to install wind barrier or not, cost and benefit from wind barrier are calculated during lifetime. In obtaining car accidental risk, probabilistic distribution of wind speed, daily traffic volume, mixture ratio in the volume, and duration time for wind speed range are considered. It is recommended to install wind barrier if benefit from the barrier installation exceed construction cost. In the numerical examples, case studies were shown for risk and benefit calculation and main risky regions on Korean highway were all evaluated to identify the number of installation sites.

Self-powered wireless bus information and disaster information system based on Internet of Things (IoT) (사물인터넷 기반의 자가 전력을 이용한 무선 버스 정보 및 재난 정보 시스템)

  • Kim, Tae-Kook
    • Journal of Internet of Things and Convergence
    • /
    • v.8 no.1
    • /
    • pp.17-22
    • /
    • 2022
  • This paper is a study on the self-powered wireless bus information and disaster information system based on Internet of Things (IoT). The existing bus information system supplies power and communication by cable, which causes a problem of increased installation cost and limited installation site due to cable burial. To solve this problem, a self-powered wireless bus information and disaster information system was proposed. The proposed system provides bus arrival information. Furthermore, in the event of a disaster such as a natural disaster, it can also reduce confusion and damage by notifying the disaster information through the system's speaker. In this study, a self-powered system using a solar module was proposed. As data are transmitted and received through wireless WiFi or LTE, the installation cost can be reduced and the problem of installation location restrictions can be solved.

A Study on Distribution System Assessment and Interruption Cost Calculation for the Industry Load by the Analytic Approach Method (해석적방법론에 의한 산업용 수용가의 공급지장비 산정 및 배전계통에의 적용)

  • Kim, Yong-Ha;Woo, Sung-Min;Baek, Byum-Min;Sin, Hyung-Chul;Park, Chang-Kyu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.4
    • /
    • pp.47-55
    • /
    • 2009
  • This paper estimates interruption cost assessment for industrial load. For executing In this way first, we research customer interruption cost(CIC) for industrial load about 1,026 unit. And to assess industrial load in D/L calculate sector customer damage function(SCDF) using CIC. Second, we compute distribution reliability through annual failure rate, repair time and so on, and then, Third, distribution system that calculate VBDRA for industrial load per alternative assesses interruption cost.

Design and Effectiveness Analysis of prefabricated Storage-type infiltration facility (조립식 저류형 침투시설의 설계 및 공간적용 효과분석)

  • Lee, Tae-Goo
    • KIEAE Journal
    • /
    • v.16 no.6
    • /
    • pp.103-108
    • /
    • 2016
  • Purpose: This study has developed economical and environmentally friendly storage type infiltration facilities that securing storage space inside the infiltration facility. It focused on preventing flooding rainfall as well as securing more groundwater through rainwater infiltration that is valuable for the dry season. In addition, this study compares the installation cost of the storage-type infiltration facility to the cost of the conventional rainwater management facilities to demonstrate the economic efficiency of the storage-based infiltration facility. Method: Unit infiltration of this facility is calculated and when it was applied to a certain capacity, the amount of countermeasures are proposed in case study. Result: Unit infiltration of it is $0.2541m^3/hr$ and un it Temporary storage of it is $1.054m^3/m$. As a result, the infiltration effect of this facility is $1.306m^3/hr$. The cost was approximately 30% reduction in time to apply the storage type infiltration facility as compared with the case to apply the existing penetration of the facilities. Since the penetration of the existing facilities is smaller than that and it has much securing volume to process the same the amount of countermeasures. Therefore, it is determined that the cost significantly increases in material cost part. On the other hand, storage type infiltration facility is installed a small quantity because Unit Temporary storage and infiltration are bigger than that. So, it occurred to reduce material and installation costs.

A Practical Approach for Optimal Design of Pipe Diameters in Pipe Network (배관망에서의 파이프 직경 최적설계에 대한 실용적 해법)

  • Choi Chang-Yong;Ko Sang-Cheol
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.18 no.8
    • /
    • pp.635-640
    • /
    • 2006
  • An optimizer has been applied for the optimal design of pipe diameters in the pipe flow network problems. Pipe network flow analysis, which is developed separately, is performed within the interface for the optimization algorithm. A pipe network is chosen for the test, and optimizer GenOpt is applied with Holder-Mead-O'Niell's simplex algorithm after solving the network flow problem by the Newton-Raphson method. As a result, optimally do-signed pipe diameters are successfully obtained which minimize the total design cost. Design cost of pipe flow network can be considered as the sum of pipe installation cost and pump operation cost. In this study, a practical and efficient solution method for the pipe network optimization is presented. Test system is solved for the demonstration of the present optimization technique.

A Study on the Optimal Site of TCSC for Reducing Congestion Cost (혼잡비용 감소를 위한 TCSC의 최적위치에 관한 연구)

  • Lee, Gwang-Ho;Mun, Jun-Mo
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.5
    • /
    • pp.220-225
    • /
    • 2000
  • As a competition is introduced in the electricity supply industry, a congestion problem arises in the transmission network. The congestion causes the transmission cost to increase. One way to decrease the congestion cost is to control the transmission flow through the installation of TCSC(Thyrister Controlled Series Capacitor). This paper deals with the optimal site of the TCSC for reducing the congestion cost using a shadow price which is one of the economic signals for the systems. Test results show that the site of the TCSC is optimal to minimize the congestion cost by the proposed algorithm.

  • PDF

Design of Manufacturing Cell and Cellular Layout based on Genetic Algorithm (유전 알고리듬에 기초한 제조셀과 셀 배치의 설계)

  • Cho, Kyu-Kab;Lee, Byung-Uk
    • IE interfaces
    • /
    • v.14 no.1
    • /
    • pp.20-29
    • /
    • 2001
  • This paper presents a concurrent design approach that deals with manufacturing cell formation and cellular layout in Cellular Manufacturing System. Manufacturing cell formation is to group machines into machine cells dedicated to manufacture of part families, and cellular layout problem determines layout of the manufacturing cells within shop and layout of the machines within a cell. In this paper, a concurrent approach for design of machine cell and cellular layout is developed considering manufacturing parameters such as alternative process plans, alternative machines, production volume and processing time of part, and cost per unit time of operation. A mathematical model which minimizes total cost consisting of machine installation cost, machine operating cost, and intercell and intracell movements cost of part is proposed. A hybrid method based on genetic algorithm is proposed to solve the manufacturing cell formation and cellular layout design problem concurrently. The performance of the hybrid method is examined on several problems.

  • PDF

A Study on Establishing Operation Mathematical Model for Optimum Capacity Estimation of the ESS Applications for each in the Nationwide Perspective (국가적 관점에서 용도별 ESS 적정용량 산정을 위한 운전수리모델 수립에 대한 연구)

  • Kim, Jung-Hoon;Youn, Seok-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.6
    • /
    • pp.969-978
    • /
    • 2016
  • Around the world are increasing the demand for ESS. Currently, the domestic is expected to benefit by operating ESS. In the domestic, it is expected to benefit from operations of the installed ESS because of the introduction of ESS less capacity. However ESS capacity to the maximum profit occurs is unknown. ESS is different from the charge-discharge characteristics and the reserve to replace, depending on the application. Therefore, it should be established in accordance with the ESS optimal capacity according to the purpose used because it can maximize the quality and efficiency of the electric energy. To the ESS optimal capacity estimation by the purpose used, It should compare the investment cost caused by ESS facility installation and operation cost caused by operating ESS. In this paper, the operation mathematical model for estimating marginal operation costs established. In operation mathematical model, operating cost is considered fuel cost and no-load cost start-up cost. Because no-load cost and start-up cost are not related to cost and power plant output, there are expressed an integer variable costs as a step function.

Joint installation of ceiling facilities in the subway system (지하철 천장시설물 공동설치 방안)

  • Lee, Pil-Sin
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1953-1959
    • /
    • 2011
  • Subway stations have a characteristic that the facilities in the ceiling should be checked, replaced and expanded frequently. The new installation of supports (steel anchors) for new facilities and workers moving-around in the ceiling result in the damage in the ceiling finish material and concrete structure which also result in construction cost increase. In addition, the noise, vibration and dust generated during the work harm the station environment. There are civil complaints on these which give difficulty to ceiling works. Accordingly, this study suggests a ceiling frame construction method that considers the convenience, economy and efficiency of ceiling work by improving the support installation method for facilities in ceiling.

  • PDF

The Study on the Impulse Characteristic of Secondary Arresters in Power Distribution System (가공 배전선로 중성선과 가공지선 겸용시의 임펄스 특성 연구)

  • Kang, Moon-Ho;Kim, Dong-Myeong;Song, Il-Keun;Chun, Sung-Nam
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.11a
    • /
    • pp.297-299
    • /
    • 2004
  • In multi-ground distribution system, overhead ground wire and neutral wire are parallel connected to offer the electrical power energy and protect damage of lightning strokes. Therefore a case where the two wires become single wire, the power company can get the benefit such as installation cost saving and line fault protection by simplify of distribution line. In this paper we describe the result of impulse test in both system ; one is the present power system the other is unified power system parallel connected overhead ground wire and neutral wire. As a result of this impulse test, the present power system get lower impulse voltage than the unified power system.

  • PDF