• Title/Summary/Keyword: Installation Cost

Search Result 1,175, Processing Time 0.027 seconds

A Study on the Market Segmentation of Accessible Housing for the Elderly Using Conjoint Analysis (컨조인트 분석을 이용한 노약자를 위한 접근가능한 주택의 시장 세분화 연구)

  • Lee, So-Young;Kim, Ji-Woo
    • Journal of the Korean housing association
    • /
    • v.26 no.4
    • /
    • pp.11-21
    • /
    • 2015
  • Due to the mass production of housing in Korea, homogeneous current housing may fail to represent residents' preferences, especially for the elderly. The purpose of this study is to identify the preferred properties of consumers for accessible housing and to examine whether cluster analysis can identify groups of residents with similar accessible housing preferences. Using a conjoint method, prospective users can jointly consider all accessible attributes, with cost attributes suggested by this study. Four categories (accessibility, safety, convenience, cost), 7 attributes (clear width, level difference, installation of grab bars, installation of elevators: only for single house type, non slippery floor materials, safety alarms, service control devices, cost) and 2 levels for each attribute were chosen. A total of 374 questionnaires were collected through a questionnaire survey method. This study employed ratings-based Conjoint analysis and the respondents ranked each card, which consisted of a set of accessible housing attributes. The data were analyzed using SPSS 16.0. The findings of this study have identified 3-4 clusters for each housing sub market. Each cluster has a different combination of socio-demographic characteristics and residential characteristics, and showed the relative importance or preference values for each accessible attribute of the segmentation. For the single housing, one group of people strongly preferred installation of elevator. The results suggested that better customization of housing could be more appealing to the different clusters of residents, providing accessible housing with cost limitations.

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

Design and Implementation of Automatic Installation System for Application Synchronization in PDA (개인 휴대단말에서 응용 프로그램 동기화를 위한 자동설치 시스템의 설계 및 구현)

  • Na, Seung-Won;Oh, Se-man
    • The KIPS Transactions:PartA
    • /
    • v.10A no.6
    • /
    • pp.685-690
    • /
    • 2003
  • The application for PDA as a new wireless Internet device is variously developed to improve the function of PDA, and the application software must be installed to PDAs. In addition. when the power supply of PDA becomes fully discharged, all data stored in the RAM (Random Access Memory) could be vanished, and then the application programs should be reinstalled. This paper presents an automatic installation system of application program, PAIS (PDA Automatic Installation System). It is designed to solve the problem of PDA that PDA's users have to install the application programs on their PDA themselves. When this engine is applied, PDA users can save the time and effort for installation. It's convenient for the PDA users. The PDA and application software company can save the cost to create materials to explain the installation process.

Cost Analysis of Composite Method Using Hollow-PC Column (중공 PC기둥을 적용한 복합공법의 공사비 분석)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.71-72
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. Therefore, this study tries to investigate 'hallow PC column composite method(HPC composite method)' from the viewpoint of construction management and analyze the construction cost of the composite method. On the assumption that each comparative method was applied to the zone, the difference in construction cost between the two methods was analyzed. As a result, HPC composite method increased the initial investment cost because of its factor technology, but reduced transport cost, lifting cost, and installation cost through lightweight columns. This study analyzed only the difference in construction cost of HPC composite method so that it has the limitation in evaluating its economy. Therefore, to evaluate the economy of HPC composite method, it is considered to research more the construction cost of HPC composite method.

  • PDF

Development of USB DVR-Rear Cameras Combined System (USB DVR과 후방 카메라를 결합한 AVM 시스템 개발)

  • Kim, Gyu-Hyun;Jang, Jong-Wook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.11
    • /
    • pp.2753-2758
    • /
    • 2014
  • Around-View, the image processing device which increases the comfort of drivers is sold in the market. This system prevents accidents in advance while driving or parking. The accidents are caused with their inexperienced driving or bad visibility. It is developed for driving convenience. However, it dosen't spread to the driver widely due to the problem of the high installation costs and complex installation process. First, expensive equipment second, difficult development environment and third, inconvenient installation procedure. So the drivers don't have many opportunities to use this system and dare to develop this system. I think if one of the problems can be solved, users might be able to access this system at low cost. In this paper, the AVM(Around-View Monitoring) minimizes two of them. Expensive equipment, inconvenient installation. The costly problems were solved by using low-cost USB device and rear cameras. In view of inconvenient installation process, the new system was designed to make it easy for people to install it. Through this, it can ease the burden of consumers.

The optimum specifications and design of distributive transformers (배전용 변압기의 합리적인 사양과 그 설계법)

  • 이승원
    • 전기의세계
    • /
    • v.14 no.4
    • /
    • pp.8-17
    • /
    • 1965
  • Firstly, this study has analyzed the following factors affecting the optimum specifications and design of distributive transformers: 1. Facilities installation cost per unit power output. 2. Facilities operating & maintenance cost per unit power output. 3. Production cost per unit power output. 4. Load factor. 5. Loss factor. Secondly, it has clarified the relations between the following factors and the specifications and design of distributive transformers; 1. No-load loss., 2. Load loss., 3. Voltage regulation., 4. Exciting current. Finally, it has determined the method of the most economic design for the transformers using the above factors and relations, and, for optimum the illustrative purpose, suggested their optimum specifications, way of evaluation, and merits by means of typical example.

  • PDF

Inspection of General Use Electric Installation Using Leakage Current Measuring (누설전류측정을 이용한 일반용전기설비의 점검)

  • Lim, Young-Bae;Jung, Jong-Wook;Jung, Jin-Soo;Bae, Seok-Myung;Cho, Seong-Won
    • Proceedings of the KIEE Conference
    • /
    • 2006.05a
    • /
    • pp.63-65
    • /
    • 2006
  • A electrical fault is defined as any abnormal condition caused by a reduction in the insulation strength. To define the potential risk of the electric installation, measurement of leakage current has been getting considered, but because the measured leakage current value also contained leakage current by capacitance, the measured value could not be adapted to absolute reference to the installation. Therefore, in this paper, the correlation between the condition of electric installation and leakage current were analyzed. The result focuses on to detect them in a cost efficient way.

  • PDF

Numerical analysis results of the cathodic protection for the underground steel pipe by anode installation method

  • Jeong, Jin-A;Choo, Yeon-Gil;Jin, Chung-Kuk;Park, Kyeong-Wan
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.10
    • /
    • pp.1212-1216
    • /
    • 2014
  • This study aims to find out the best anode location for buried pipelines. Numerical simulation program known as CATPRO (Elsyca, Belgium) were used for confirming the best location of anodes and the effects of impressed current cathodic protection system. Applied conditions for numerical simulation were similar to on-site environmental conditions for optimal application of cathodic protection system. Used criterion of cathodic protection was NACE SP 0169, which describes that minimum requirement for cathodic protection is -850mV vs. CSE. Various layouts for anodes' installation were applied, which were distance between anodes, anode installation location, and applied current. The areas where cathodic protection potential was lower than -850mV vs. CSE was limited up to 50m from anode installation locations. It was founded numerical analysis obtain cost-effective and efficient cathodic protection methods before design and application the impressed cathodic protection system to on-site environment.

Bogie/Carbody Interface Bolster Development for the Installation of Active Suspensions and the Modification Operation Improvement of TTX Vehicle (TTX 차량의 능동 현가장치 설치 및 수정 작업 개선을 위한 대차/차체 인터페이스 볼스터 개발)

  • Kim, Hyung-Joohn;Park, Sung-Tae;Kang, Kwang-Ho;Lee, Won-Sang
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.28-34
    • /
    • 2011
  • The carbody underframe of TTX vehicle should be modified a lot for the installation of new devices such as an active suspension system between the bogie and the carbody of TTX vehicle, because the carbody underframe is one body structure consisting of a center sill welded with a carbody bolster. Modification operation of the carbody takes a lot of time and cost, because the huge sized carbody structure should be moved to a machining apparatus and machined to guarantee the manufacture accuracy of new device installation brackets. For this reason, modification operation improvement is needed to install new devices more efficiently between the bogie and the carbody. This paper introduce the development of 'bogie/carbody interface bolster' that not only supports the carbody weight but also enables new devices to be installed more efficiently between the bogie and the carbody. This development has advantage to reduce working time and cost to install new devices such as an active suspension system between the bogie and the carbody by minimizing the modification of the carbody of TTX vehicle.

  • PDF

A Study on the Proper Number of Banks of Parallel Operation of Transformer in Large-scale Power Plants Using the High Temperature Fuel Cell Considering the Internal Failure (내부고장을 고려한 고온형 연료전지 대규모 발전단지의 병렬운전 변압기 적정 뱅크수에 관한 연구)

  • Chong, Young-Whan;Chai, Hui-Seok;Sung, In-Je;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.3
    • /
    • pp.26-31
    • /
    • 2014
  • High temperature fuel cell system, such as molten carbonate fuel cells(MCFC) and solid oxide fuel cells(SOFC), are capable of operating at MW rated power output. The power output change of high temperature fuel cell imposes the thermal and mechanical stresses on the fuel cell stack. To minimize the thermal-mechanical stresses on the stack and increase the systems reliability, we should divide the power plant configuration to several banks. However, the improvement of reliability in fuel cell power plant system causes an increase of the investment cost, for example, replacement costs, labor costs, and so on. For this reason - the balance between investment and reliability improvement - many studies about the appropriate level of investment have been conducted. In this paper, we evaluate the cost for operation and installation, the benefit for electric energy and thermal energy sales, and the system reliability for several cases : these cases relate with the bank configuration.