• Title/Summary/Keyword: Inspection items

Search Result 351, Processing Time 0.033 seconds

A Study on the Improvement of Safety Management for Preventing Laboratory Accidents (연구실 사고 예방을 위한 안전관리 개선방안 연구)

  • Lee, Eun-Byul;Yoo, Byung-Tae;Yoon, Jun-Heon
    • Journal of the Korean Institute of Gas
    • /
    • v.24 no.4
    • /
    • pp.1-9
    • /
    • 2020
  • The Act on the Establishment of Laboratory Safety Environment was enacted in 2015 to prevent safety accidents occurring in laboratories. However, it is time for fundamental and comprehensive safety management measures since various systems for laboratory safety are operated at the same time. The purpose of this study is to propose effective improvement methods in terms of the safety management inspection system. The laboratory's safety management statutes were investigated and compared, and problems arising from differences in inspection systems were derived. Further, specific inspection items were compared separately from the facility aspect and the management aspect. The improvement method was proposed. As a result, although it was the same lab, it was managed by different tests at different times. There were differences in inspection items that focused on the structure and performance of chemical facilities, or on the management criteria such as storage of reagents and management of toxic materials. The problems and suggestions considered in this study are expected to help develop the safety management system for preventing laboratory accidents.

A Study on tests process for verification of AC Traction system performance (교류 급전시스템 성능검증을 위한 시험방안에 관한 연구)

  • Jung, Ho-Sung;Lee, Ki-Won;Kim, Joo-Rak;Han, Moon-Seob;Kim, Jin-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2202-2203
    • /
    • 2011
  • AC substation of urban transit supplies a suitable AC power on electricity vehicles. AC substation is verified electrical safety of system through pre-operation inspection on electrical installations to be supplied power from KEPCO. However, because test items and method for AC traction system are unprepared on pre-operation inspection, the general safety and performance verification of AC traction system are very insufficient. Therefore this paper analyze the test examples such as factory equipment tests, factory combined tests and railway tests for the safety and performance verification of AC traction system and present a suitable test items and test standard in domestic.

  • PDF

Process Control Based on the Incomplete Measurement Data Obtained from 100% Inspection (전수검사에서 얻어진 불완전한 측정 데이터를 사용한 공정관리)

  • Kwon, Hyuck-Moo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.2
    • /
    • pp.84-92
    • /
    • 2004
  • A process control procedure is proposed when 100% inspection is performed in a process with excellent capability. Only the incomplete measurement data is assumed to be available, i.e. the specific measurement value of the quality characteristic is not available for each item but it can be determined to be smaller or larger than any prescribed value. In the suggested model, a signal limit is introduced to determine whether the process under study is in control or not. If the quality characteristic of an incoming item exceeds the upper signal or the lower signal limit, the process is determined to be stopped or not by comparing the number of consecutively accepted items with a predetermined threshold number. The procedure is designed based on the type I and II errors. The performance of the model is evaluated by the expected number of items produced under the in-control and out-of-control states until the process is stopped.

An analysis of tests process for verification of DC Traction system performance (직류 급전시스템 성능검증을 위한 시험방안 분석)

  • Jung, Ho-Sung;Han, Moon-Seob;Jang, Dong-Uk;Lee, Ki-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.499-504
    • /
    • 2008
  • DC substation of urban transit supplies a suitable DC power on electricity vehicles by being supplied from KEPCO. DC substation is verified electrical safety of system through pre-operation inspection on electrical installations to be supplied power from KEPCO. However, because test items and method for DC traction system are unprepared on pre-operation inspection, the general safety and performance verification of DC traction system are very insufficient. Therefore this paper analyze the overseas test examples such as factory equipment tests, factory combined tests and railway tests for the safety and performance verification of DC traction system and present a suitable test items and test standard in domestic.

  • PDF

A Study on the Improvement of Condition Evaluation Method through Correlation Analysis between Evaluation Items of Reinforced Concrete Buildings (철근콘크리트 건축물의 평가항목간 상관관계 분석을 통한 상태평가방법 개선에 관한 연구)

  • Woo, Hye-Sung;Yi, Waon-Ho;Hwang, Kyung-Ran;Lee, Kwan-Hyeong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.3
    • /
    • pp.92-99
    • /
    • 2021
  • In the case of precise safety inspection and precise safety diagnosis of a building, a condition evaluation must be conducted to determine the safety grade. Since 2004, an evaluation method using fuzzy theory has been introduced for quantitative condition evaluation,and the relationship and importance of reinforced concrete members using fuzzy theory have been applied. Generally, fuzzy theory is a method used to deal with ambiguous expressions with unclear correlations, but at the time of development, it seems that it was developed by applying fuzzy theory as an alternative in a situation where inspection and diagnosis result data were insufficient. Therefore, it is necessary to verify the relationship and importance of evaluation items derived based on the current fuzzy theory using actual inspection and diagnosis result data.In this study, the correlation between the evaluation items was derived by using the results of 19 precision safety inspections and 9 precision safety inspections and the performance score function formula, and using this, a reasonable durability score calculation formula of the member was presented.

Analysis on the Current Evaluation items for the Performance-focused Management of the Concrete Retaining Wall (콘크리트 옹벽의 성능위주평가를 위한 평가항목 분석 연구)

  • Lee, Dong Yul;Seong, Joo Hyun;Jeong, Hae Sang;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.6
    • /
    • pp.56-62
    • /
    • 2015
  • Recently, one of countermeasures against aging SOC infrastructures, performance-focused management including the serviceability, functionality, durability, and economics has been changed from the structural safety-focused evaluation has changed into The current inspection and diagnosis for the major SOC facilities in Korea has been carried out by the specific principle of details, and most of them checked by the visual inspection are focused on the repair and rehabilitation of the damaged structures, thus they are the preventive maintenance. However, the performance-focused management should be replaced for the effective and economic maintenance as wells as for the minimization of the damage. In this regard, this study the appropriacy of the current evaluation items about the concrete retaining wall, one of SOC infrastructures as the previous step forward the performance-focused management. In order to deduct the effective evaluation items in order, the entropy, analytic hierachy process (AHP), and promethee analysis were peformed and the results were compared and discussed.

An interactive measuring and inspection system for NC machine tools (NC 공작기계용 대화형 측정 및 검사시스템)

  • 김경돈;정성종
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.1399-1402
    • /
    • 1997
  • Design methodology of Interactuve Measuring Part Program Generating Tools(IMPPGT) realized on the FANUC 15MA using touch trigger probes and interactive macro functions of the CNC was described in this paper. Measuring G codes have been designed according to probe ste up, basic and applied inspection items by using measuring arguments. Menu driven measuring and inspection functions of the IMPPGT were studied and implemented on the CNC through the macro executor and ROM writer. Using the developed measuring G code system on the machine tool, untended measurement and inspection operation was able to be realized in precision FMS lines.

  • PDF

Lot Sizing and Quality Inspection Schedules with Machine Breakdown (기계 고장을 고려한 생산 및 품질검증 정책)

  • 이창환
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.21 no.3
    • /
    • pp.143-157
    • /
    • 1996
  • This paper addresses the effects of an imperfect production process on the optimal production quantity and quality inspection policies. The system is assumed to deteriorate during the production process. The result are either the production of a number of defective items or the breakdown of the production meachine. A simple rule has been suggested to determine whether multiple quality in spection is workth or not. Furthermore, when multiple inspection policy is adopted, the optimal in spection schedule is shown to be equally spaced throughout the production cycle. Exact solution and approximation of the optimal production quantity and approximation of the optimal number of inspection are provided. Finally , to better understand the model of this paper, comparisons between this model and classical EMQ model are provided.

  • PDF

Effects of Limited Capacity on Screening Procedures Using a Surrogate Variable (대용특성을 활용한 스크리닝 검사에서 제한된 생산용량의 효과분석)

  • Choi, Ik-Jun;Hong, Sung-Hoon
    • Journal of Korean Society for Quality Management
    • /
    • v.36 no.4
    • /
    • pp.77-86
    • /
    • 2008
  • Due to the rapid growth in automated testing and manufacturing systems, screening inspection becomes very attractive. In this paper, we investigate the effects of limited capacity on screening inspection using a surrogate variable. The model is developed under the assumption that the reprocessed and nonreprocessed items are produced by the same manufacturing process and therefore their quality characteristics are independently and identically distributed. Profit models are constructed which involve four price/cost components; selling price, cost incurred by imperfect quality, reprocessing and quality inspection costs. Methods of finding the optimal screening limits are presented, and a numerical example is given. Sensitivity analyses are also performed to study the effect of a process standard deviation on this model.

Design of Screening Inspection in a Multi-Stage Manufacturing Systems (다공정 제조시스템에서의 전수검사에 관한 연구)

  • 박영현;이창호
    • Journal of Korean Society for Quality Management
    • /
    • v.25 no.1
    • /
    • pp.1-16
    • /
    • 1997
  • In this paper, we illustrate how to design screening inspections for minimizing a total quality costs in a multi-stage manufacturing systems. The total quality cost model consists of inspection costs, internal failure costs, external failure costs, and Taguchi's loss function. Although, the use of automatic test equipment such as machnie vision and CMM has greatly increased inspection speed and accuracy, screeing(100% inspection) could be considered only as a short-term method to remove nonconforming items from a population, not for a long-term quality improvement. However, screeing should be used for certain situations such as before costly operations and after unsatisfied operations. This paper ends with an example that demonstrates the usefulness of the model.