• Title/Summary/Keyword: Initial Cost

Search Result 1,552, Processing Time 0.034 seconds

A Case Study of maintenance cost estimation for military official residence building in BTL project (BTL사업 군관사 건축물의 유지관리비용 산정에 관한 연구)

  • Kwon, Bum-Joon;Kim, Hyun-Kyu;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.851-854
    • /
    • 2008
  • The purpose of this study is to predict the maintenance cost for military official residence building projects which were ordered for five military official residence building. In conducting this study, the adapted research method was to classify initial investment for each construction of the military official residence building and to estimate maintenance cost. This study was analyzed by studying the estimation of maintenance cost in the apartments and present value analysis method. The results of this research are as follows. 1) The initial investments was analyzed that the total construction cost would be 1,683,286 thousand won ; construction(79%), civil(3%), landscaping(2%), MEP(5%), heating and hot water supply system(5%), and water supply and sanitary system(6%) per square meter. 2) Based on the result analyzed above, the maintenance cost of the apartments was analyzed and then estimated the proper maintenance cost by using maintenance cost estimation method and present a value analysis method.

  • PDF

Analysis for the Economic efficiency of District Heating and Gas Engine Co-generation System comparing with Central Heating System (중앙난방방식을 지역난방.소형열병합난방방식으로 전환시의 경제성 비교 분석)

  • Kim, Kyu-Saeng;Lee, Sang-Hyeok;Hong, Kyung-Pyo;Won, Young-Jae
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.459-465
    • /
    • 2007
  • This study was conducted to calculate the LCC of a apartment complex with a type of heating system, district heating and cogeneration system. For the purpose of analyzing LCC according to size of apartment complex, 500, 1,500 and 4,000 houses of model apartment selected. This research performs design of heating system and the life cycle cost analysis including an initial cost, energy cost, maintenance and operation cost, replacement cost and renovation cost during the project period(15years). According to the calculated results, 1) Initial cost of cogeneration system with 500, 1500 and 4000 houses is higher than district heating system each of 20%, 13%, 12%. 2) In case of cogeneration system, the payback period by electric generation is 5.21, 4.92 and 4.47 years and saving cost was calculated 29 billion won, 94 billion won and 262 billion won after payback period. 3) Cogeneration system LCC was 1.12, 1.07 and 1.06 times larger than district system with the size of apartment complex. According to the case of this study district heating system is more efficient than cogeneration system in terms of the reduction of LCC. 4) Gas Engine Co-generation System is more efficient than other systems because it can collect progressive part from electric charge progressive stage system. However, the efficiency is decreasing because of raising of fuel bills(LNG) and lowering of power rate for house use. Especially the engine is foreign-made so the cost of maintenance and repair is high and the technical expert is short. 5) District heating is also affected by fuel bills so we should improve energy efficiency through recovering of waste heat(incineration heat, etc.). Also, we should supply district cooling on the pattern of heat using of let the temperature high in winter and low in summer.

  • PDF

Minimum Expected Life Cycle Cost Model for Optimal Seismic Design and Upgrading of Long Span PC Bridges (장대 PC교량의 최적 내진설계 및 성능개선을 위한 최소 기대 Life Cycle Cost 모델)

  • 조효남;임종권
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.04a
    • /
    • pp.305-312
    • /
    • 1999
  • This study is intended to propose a systematic and practical life cycle cost(LCC) model for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges. The LCC models consist of five cost functions such as initial cost, repair/replacement cost, human losses, road user cost, and indirect losses of regional economy. The proposed model Is successfully expressed in temrs of Park-Ang damage indices and life cycle damage probability obtained from SMART-DRAIN-2DX which is an existing algorithm for nonlinear time history analysis. The proposed LCC model is successfully applied to a viaduct constructed by PSM, in Seoul. Based on the observations, the proposed systematic procedure for the formulation of LCC model may be useful for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges.

  • PDF

Cost Analysis of Composite Method Using Hollow-PC Column (중공 PC기둥을 적용한 복합공법의 공사비 분석)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.71-72
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. Therefore, this study tries to investigate 'hallow PC column composite method(HPC composite method)' from the viewpoint of construction management and analyze the construction cost of the composite method. On the assumption that each comparative method was applied to the zone, the difference in construction cost between the two methods was analyzed. As a result, HPC composite method increased the initial investment cost because of its factor technology, but reduced transport cost, lifting cost, and installation cost through lightweight columns. This study analyzed only the difference in construction cost of HPC composite method so that it has the limitation in evaluating its economy. Therefore, to evaluate the economy of HPC composite method, it is considered to research more the construction cost of HPC composite method.

  • PDF

Development of Construction Cost Estimation Model with the Actual Cost Data for Rural Development Project (실적자료에 의한 농어촌정비사업 사업비 결정에 있어서의 단가모델 구축)

  • 배연정;이정재;윤성수
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.359-364
    • /
    • 1999
  • Providing the reasonable construction cost at the initial stage of the rural development project, is a kety factor of the each step of project , such as propriety analysis , cost planning , design, and planning the progress of work. The explainable construction cost can be estimated at the early stage using the actual cost data by statistical analysis. In this study, the influence factors are extracted by factor analysis with the actual cost data of rural development project, object cost model is developed by multiple regression analysis, and verify the developed cost model by Monte-Carlo simulation .

  • PDF

Cost Effectiveness of Bse-Isolation for Bridges in Low and Moderate Seismic Region (중저진 지역에서의 지진격리교량의 경제적 효율성에 관한 연구)

  • 고현무
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1999.04a
    • /
    • pp.178-185
    • /
    • 1999
  • Minimum life-cycle cost helps to evaluate cost effectiveness of base-isolated bridges under specific condition. Life-cycle cost mainly consists of the initial construction cost and the expected damage cost. Damage cost estimation needs proper model of input ground motion failure probability evaluation method and limit states definition. We model the input ground motion as spectral density function compatible with the response spectra defined at each seismicity and site condition. Spectrum analysis and crossing theory is suitable for reseating calculation of failure probabilities in the process of cost minimization. Limit states of base-isolated bridges re defined for superstructure isolator and pier respectively The method is applied to both base-isolated bridges and conventional bridges under the same conditions to investigate cost effectiveness of base isolation in low and moderate seismic region. the results show that base-isolation of bridges are more effective in low and moderate seismic region and that the site effects on the economical efficiency may not be negligible in such a region.

  • PDF

Economic Analysis of the Livestock Manure Treatment System Using Life-Cycle Cost Technique (LCC 기법을 통한 가축분뇨처리시설의 경제성 분석)

  • Kim, J.H.;Cho, S.H.;Kwag, J.H.;Choi, D.Y.;Jeong, K.H.;Chung, U.S.;Chung, M.S.;Park, S.K.
    • Journal of Animal Environmental Science
    • /
    • v.17 no.sup
    • /
    • pp.61-68
    • /
    • 2011
  • To assess the total cost with all stages of facilities, the feasibility of Life Cycle Cost (LCC) analysis was examined in this study to estimate the livestock manure treatment system and optimal decision making process. For the economic evaluation, the plant/equipment investment and annual operation cost of four Public Livestock Recycling Facilities, whose treatment capacity is 100 ton piggery manure per day, was compared. The initial cost was in the range of 2,699 million won to 3,202 million won, where T and E methods were highest and lowest, respectively. The annual operation cost was in the level of 378 million to 498 million won, which decreased in the following order : T method > J method > E method > B method. For the LCC analysis, 4.7% of interest rate, 3.13% of inflation rate, and 1.52% of net discount rate was considered by the data received from Bank of Korea and Statics Korea in the period of 2000 to 2009. Also, for the calculation of present value factor, the durable years of civil engineering & construction, machinery and electric instrument was 30 years, 10 years and 15 years, respectively. Based on these consideration, operation cost was in the range of 17,570 won/ton to 20,661 won/ton, and E method (17,570 won/ton) was economical and B method (20,661 won/ton) was non-economical. Though initial cost of T method was higher than that of B method, LCC analysis of T method was lower than that of T method due to the lower operation cost. Therefore, LCC analysis, which considers both initial cost and operation cost, is more reasonable evaluation method than either initial cost or annual operation cost. For the change of LCC analysis according to the uncertainty, the sensitivity analysis was carried out using fluctuation magnitude of discount rate in the period of 2000 to 2009. As a result, LCC analysis evaluated by discount rate was stable for the uncertain factors since the cost leadership did not change even though the sensitivity analysis varied. In summary, the economic evaluation using LCC analysis could be an efficient reference to choose the suitable livestock manure treatment plants. Furthermore, standardization of statement calculation for the actual cost analysis should be conducted and more detailed study is necessary to validate this summary. Therefore, the application of comprehensive technology evaluation, which considers LCC analysis, should contribute in obtaining objectivity and enhancing reliability for the 'Evaluation of Livestock Manure Treatment System and its Technology'.

A Clamping Force Estimation Method in Electric Parking Brake Systems (전자 제어식 주차브레이크 시스템의 제동력 추정 기법)

  • Jang, Min-Seok;Lee, Young-Ok;Lee, Won-Goo;Lee, Choong-Woo;Son, Young-Sup;Chung, Chung-Choo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.12
    • /
    • pp.2291-2299
    • /
    • 2008
  • Hall effect force sensors have been used to measure clamping force in conventional Electric Parking Brake(EPB) systems. Estimation of clamping force without the sensors has drawn attentions due to mounting space limitations and cost issues. Removing the sensor requires the estimation of the initial contact point where the clamping force is effectively applied to the brake pads. In this paper, we propose how to estimate the initial contact point finding the relation between the angular velocity of an actuator and the initial contact point. For force estimation a look-up table is used as a function of the displacement of parking cable from the initial contact point. The proposed method is validated by experiments. From the experimental results we observe that the proposed method satisfies the specifications. The designed method is also able to estimate clamping force although parking cables are loosened and brake pads are worn out. Applying the proposed method enables manufacturing of low cost EPB systems.

Determination of the Resetting Time to the Process Mean Shift by the Loss Function (손실함수를 적용한 공정평균 이동에 대한 조정시기 결정)

  • Lee, Do-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.1
    • /
    • pp.165-172
    • /
    • 2017
  • Machines are physically or chemically degenerated by continuous usage. One of the results of this degeneration is the process mean shift. Under the process mean shift, production cost, failure cost and quality loss function cost are increasing continuously. Therefore a periodic preventive resetting the process is necessary. We suppose that the wear level is observable. In this case, process mean shift problem has similar characteristics to the maintenance policy model. In the previous studies, process mean shift problem has been studied in several fields such as 'Tool wear limit', 'Canning Process' and 'Quality Loss Function' separately or partially integrated form. This paper proposes an integrated cost model which involves production cost by the material, failure cost by the nonconforming items, quality loss function cost by the deviation between the quality characteristics from the target value and resetting the process cost. We expand this process mean shift problem a little more by dealing the process variance as a function, not a constant value. We suggested a multiplier function model to the process variance according to the analysis result with practical data. We adopted two-side specification to our model. The initial process mean is generally set somewhat above the lower specification. The objective function is total integrated costs per unit wear and independent variables are wear limit and initial setting process mean. The optimum is derived from numerical analysis because the integral form of the objective function is not possible. A numerical example is presented.

Design of Multi-Regional Water Supply System Based on the Optimization Technique (최적화 기법을 이용한 광역상수도 관로시스템 설계)

  • Kim, Ju Hwan;Kim, Zong Woo;Park, Jae Hong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.13 no.1
    • /
    • pp.95-112
    • /
    • 1999
  • In this research, it is proposed that optimization method is introduced and applied to the design of pipeline system in multi-regional water supply project, which has been constructed to settle the regional unbalance problems of available water resources. For the purpose, interface programs are developed to integrate linear programming model and KYPIPE model which is used for optimization and hydraulic analysis, respectively. The developed program is applied to the pipeline system design of multi-regional water supply project. The optimal diameters from the application of linear programming technique are compared with those from conventional method that is time-consuming and tedious trail and error process. Since the conventional design largely depends upon the experience of designers and the results of general hydraulic analysis, it can not be reasonable and consistent. The application of linear programming technique can make it possible to design pipeline system optimally by using same design factors of general hydraulic models. The model can select commercial discrete pipe diameter as optimal size by using pipe length as decision variables. The developed model is applied to Pohang multi-regional water supply system design with two different objective functions, which are initial construction cost and annual cost including electric cost. As results, it is calculated that the initial construction cost of 1,449,740 thousand won is saved and annual cost of 128,951 thousand won is saved for a year within study year. Also, the optimal site of pump station is selected on 5th pipe, which is located between the diverging junction to Kangdong(2) province and the diverging junction to Cheonbuk province. It is explained that pump cost is less than pipe cost in this application case study due to little pump station scale. In the case of water supply with large pump capacity, it is reasonal that the increase of pipe size is more efficient instead the increase of pump station capacity to save annual cost.

  • PDF