• Title/Summary/Keyword: Initial Cost

Search Result 1,549, Processing Time 0.032 seconds

A Study on Sensitivity Analysis of Life-Cycle Cost of Concrete Bridges (콘크리트 교량의 생애주기비용 민감도 분석)

  • Koo, Bon-Min;Byun, Kuen-Joo;Song, Ha-Won
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.773-776
    • /
    • 2004
  • The so-called Life Cycle Cost (LCC) analysis on reinforced concrete bridge can provide useful information for initial design and maintenance plan of the RC bridge. This paper proposes an LCC prediction equation and a sensitivity analysis method for RC bridges. An LCC equation for the RC bridge which includes initial investment cost, maintenance cost, and demolition cost was derived and verified from the data for design and construction of an RC slab bridge. In order to solve uncertainty problem on actual discount rate and material characteristics in the analysis of LCC of concrete bridges, a sensitivity analysis method on the LCC using the Monte Carlo simulation technique was suggested.

  • PDF

Consideration on the Creation of Construction Cost by Calculating the Quantity at the Planning Design Stage - Focusing on Construction Cost Management Vases and Work Methods - (초기 설계단계에서 개산 견적의 수량산출에 의한 건축공사비 작성에 대한 고찰 - 공사비 관리 사례 및 작업 방법을 중심으로 -)

  • Hyun, Dong-Myung;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.329-330
    • /
    • 2021
  • The calculation of the correct construction value in the construction should be investigated after the quantity is calculated. In order to calculate the quantity requires a lot of cost and time, and the initial accurate quantity calculation is not possible. Therefore, in the planning step in order to successfully complete the project to demonstrate the practicality of the difference between the construction cost by the construction design by presenting a method for calculate the quantity through the estimate with the construction open, floor plan, surface view, section.

  • PDF

Forecasting and Prolonging Method of Optimum Economic Life for Office Buildings using Life Cycle Cost (LCC분석에 의한 오피스건축물의 최적경제수명추정분석 및 장수명화에 관한 연구)

  • Yang Bong-Seog;Jeong Hee-Cheol;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.135-143
    • /
    • 2001
  • The purpose of this study is to estimate and analyze the optimum economic life of office buildings in consideration of their LCC (Life Cycle Cost), and thereby, explore the ways to manage the outlived office buildings economically. In estimating the economic life, initial investment cost and maintenance cost are taken into due consideration. For this study, those office buildings in Yeouido and Mapo region were sampled. The surveyed details were reduced to unit area to calculate a unit value, and then, their optimum economic life was estimated using LCC. Five alternatives for management of outlived office buildings were compared in terms of reconstruction or rehabilitation cost.

  • PDF

Economic Analysis of Heat Pump System through Actual Operation (히트 펌프 냉난방 시스템의 실사용을 통한 경제성 분석)

  • Shin, Gyu-Won;Kim, Gil-Tae;Joo, Ho-Young;Lee, Jae-Keun
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.921-926
    • /
    • 2006
  • The present study has been conducted economic analysis through actual operation of EHP and GHP which are installed at the same building of an university Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze LCC and economical efficiency is compared. The initial cost is considered on the basis of actual costs, and annual energy cost is converted into the cost after measuring electricity and gas consumption a day. LCC applied present value method is used to assess economical efficiency of both them. Variables used to LCC analysis are electricity cost escalation rate, natural gas cost escalation rate, interest rate, and service lives and when each of them are 4%, 2%, 8%, and 20 years, results of analysis short that EHP(148,257,306 won) is 8.05%(12,981,990 won) more profitable than GHP(161,239,295 won).

  • PDF

Suggestion of an Automatic BIM-based Repair & Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 자동화방안 제시)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.87-88
    • /
    • 2016
  • In order to assess the design value of engineering work from the point of view of LCC (Life Cycle Cost) in Korea, it is mandatory for all construction works that the total construction costs are over 10 billion won. The LCC includes initial construction costs, maintenance & operation costs, energy costs, end-of-life costs, and so on. Among these, the portion for maintenance & operation costs for a building is sizeable, as compared to the initial construction costs. Furthermore, the paradigm for construction industry has rapidly shifted from 2D to BIM, which includes design planning and data management. However, the study of BIM-based LCC analysis is not adequate today, even though all domestic construction projects ordered by the Public Procurement Service have to adopt BIM. Therefore, this study suggests a methodology of BIM-based LCC analysis that is particularly focused on repair and replacement (R&R) cost. For this purpose, we defined requirements of calculating R&R cost and extracted X from the relevant IFC data. Thereafter, we input them to the ontology of calculating the initial construction costs to obtain an objective output. Finally, in order to automatically calculate R&R cost, mapping with R&R criteria was performed. We expect that our methodology will contribute to more efficiently calculate R&R cost and, furthermore, that this methodology will be applicable to all range of total LCC. Thus, the proposed process of automatic BIM-based LCC analysis will contribute to making LCC analysis more fast and accurate than it is at present.

  • PDF

The Economic Comparison of EHP and GHP for Medium Capacity Air-conditioning (중용량 공조에서 EHP와 GHP의 경제성 비교)

  • Kim, Young-Il
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.3
    • /
    • pp.167-174
    • /
    • 2008
  • Cost related to building equipment accounts for about 85% of the life cycle cost of buildings. Therefore proper selection of air-conditioning system is important for reducing the overall cost of buildings. In this study, medium capacity EHP and GHP for air-conditioning a building with a floor area of 1,200 $m^2$ are compared economically. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. For the initial cost, cost of equipment, construction, installation, electric facility, financial subsidy and tax cut is considered. Cost of basic electricity, energy(electricity and gas), space charge, labor, insurance and repair is considered for the operation cost. Under the assumptions made in this study, overall cost of EHP is less than that of GHP, but this is not absolute and different outcome may result if different assumptions are made. This study is useful for those who are interested in choosing an air-conditioning system that costs less for mid-size buildings with simple calculations.

Analysis on Housing Energy for Applying Geothermal System in Mongolia (몽골에서의 지열 시스템 적용을 위한 주택 에너지분석)

  • Kim, Jin-Ho;Kim, Joong-Hun;Shin, Seung-Ho
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.10 no.2
    • /
    • pp.19-23
    • /
    • 2014
  • In the capital of Mongolia where the air quality is getting worse due to the coal consumption used for electricity generation and district heating, the application of geothermal systems in the housing sector is recently designed for high class resort. In this study, the case of applying a geothermal system in a house in Mongolia is examined. The effects of passive house design on the needed heat pump capacity, as well as the annual energy consumption are analyzed. Moreover, as the initial costs, except labor fee, are assumed similar to Korea, cost analysis for several cases is examined, too. From the results, if a house is designed according to passive house standard instead of ASHRAE standard, the heat pump capacity can be expected to be reduced from 16 to 5~6 RT. Furthermore, although the initial cost of architectural cost might increased by 29 M\, the total initial cost is reduced by 14 M\, while the annual energy consumption is reduced by 14%. This is mainly driven by the fact that the geothermal system which serves as the main system to cover the building needs, with a high initial cost for fulfilling the peak requirements.

Optimal Life Cycle Cost Design of a Bridge (교량의 생애주기비용 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.115-122
    • /
    • 2010
  • The importance of the life cycle cost (LCC) analysis for bridges has been recognized over the last decade. However, it is difficult to predict LCC precisely since the costs occurring throughout the service life of the bridge depend on various parameters such as design, construction, maintenance, and environmental conditions. This paper presents a methodology for the optimal life cycle cost design of a bridge. Total LCC for the service life is calculated as the sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The optimization method is applied to design of a bridge structure with minimal cost, in which the objective function is set to LCC and constraints are formulated on the basis of Korean Bridge Design Code. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on damage probabilities to consider the uncertainty of load and resistance. Repair and rehabilitation cost is determined using load carrying capacity curves and user cost includes traffic operation costs and time delay costs. The optimal life cycle cost design of a bridge is performed and the effects of parameters are investigated.

Evaluation Method for Value Analysis in the Remodelling of Apartment Building - Focused on Economical Efficiency and User Demand - (건축물의 리모델링 가치분석을 위한 평가방법 - 경제성 평가와 사용자 요구분석을 중심으로 -)

  • 정동환;소광호;김천학;김의식;양극영
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.103-109
    • /
    • 2002
  • This research is aiming to specify the requirement of the investment such as initial cost, running cost earning rate to make effective investment considering the purpose of remodeling and economical value of store building enough to meet the initial purpose of remodeling. The review of earning rate for economical evaluation was performed by the on-site auditing on the structure and function of the building and applying the assessment simulation program, which is to find the possible business model to identify the requirement of building owner through case study. After the research, the following results are obtained. First, it is important that many aspects should be carefully analysis and the best method should be selected as characteristics of remodeling can be defer each other in their implementations. Second, though the remodeling of exist buildings to promote the functions has been applied. no suitable assessment tool has bee developed for deciding the level of remodeling in the view of economical efficiency so far. Third, the economical benefit was evaluated by analysing annual earning rate which is applied by investment items and recovery period for the investment. More specific data bate should be established to apply the suggested economic accession in business enough to forecast the future circumstances. More researches should be promoted on this area continuously as well as the integrated economic evaluation of remodeling on existing building.

  • PDF

Feasibility study on waste heat utilization system in subway (지하철배열 이용 시스템의 경제성 평가)

  • Lee, Chul-Goo;Kim, Jong-Dae;Im, Tae-Soon;Pang, Seun-Gki;Ham, Heung-Don
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.7 no.1
    • /
    • pp.59-64
    • /
    • 2011
  • Feasibility study on energy saving system by utilizing exhausted heat from subway, which is one of the unused energy, was carried out. General heat source system using absorption chiller-heater was used for comparing to the energy saving system, and payback period method using initial cost and running cost of two systems, was used to perform economic estimation. Payback period was about ten years, and this period might be shortened if nation's economic support enact.