• Title/Summary/Keyword: Initial Cost

Search Result 1,557, Processing Time 0.026 seconds

Developments on Low Cost Protection Circuit of Discharge for D-type Non-rechargeable Lithium Batteries(Li/SOCl2) (D형 리튬 1차 단위전지(Li/SOCl2)용 저가형 과방전 차단회로 개발)

  • Ahn, Mahn-Ki;Jung, Yeong-Tak;Lim, Jae-Sung;Roh, Tae-Joo
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.5
    • /
    • pp.665-674
    • /
    • 2018
  • In this paper, we propose a development results of a D-type non-rechargeable lithium battery($Li/SOCl_2$) on improvement in a low cost protection circuit of discharge for domestic military power source. According to this study, we describe a new design and product with 8-bit microcontroller in the protection circuit which can estimate state of health of the battery regardless of occurring an initial voltage delay. Also this paper discuss and facilitate development as solution to a safety about the non-rechargeable lithium batteries. As a result, we verified a quality of the protection circuit by a development test and evaluation(DT&E) process.

An Economic Analysis and Performance Prediction for a Ground Heat Pump System with Barrette Pile (Barrette 파일을 이용한 지열시스템의 채열 성능 예측 및 경제성 분석에 관한 연구)

  • Chae, Ho-Byung;Nam, Yujin;Park, Yong-Boo
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.11
    • /
    • pp.600-605
    • /
    • 2013
  • Ground source heat pump systems (GSHP) can achieve higher performance of the system, by supplying more efficient heat source to the heat pump, than the conventional air-source heat pump system. But building clients and designers have hesitated to use GSHP systems, due to expensive initial cost, and uncertain economic feasibility. In order to reduce the initial cost, many researches have focused on the energy-pile system, using the structure of the building as a heat exchanger. Even though several experimental studies for the energy-pile system have been conducted, there was not enough data of quantitative evaluation with economic analysis and comprehensive analysis for the energy-pile. In this study, a prediction method has been developed for the energy pile system with barrette pile, using the ground heat transfer model and ground heat exchanger model. Moreover, a feasibility study for the energy pile system with barrette pile was conducted, by performance analysis and LCC assessment. As a result, it was found that the heat exchange rate of a barrette pile was 2.55 kW, and the payback period using LCC analysis was 8.8 years.

The Comparative Study of the Warranty Cost Model for Software Reliability Time Based on Extreme Value Distribution (극값 분포 특성을 가진 소프트웨어 신뢰성 보증 모형에 관한 비교연구)

  • Kim, Hee-Cheul
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.6B
    • /
    • pp.623-629
    • /
    • 2009
  • In this research, the process of developing software products to users in transfer by considering the warranty period to determine the timing of the release period is a comparative study of models. For the results of demonstration, exponential software reliability model increases the warranty period, the higher the initial period, but shows almost a similar release. In contrast, the optimal release time of imperfect debugging software reliability model, lower the initial warranty period, but the pattern is expected to rise slightly larger. The proposed model, extreme value distribution model, pattern of the optimal release time gradually increase, have a form that can be drawn. These research results through, warranty period and release the software developers understand the relationship between the optimal time for software development by using advance information could do is feed.

Best Choice in Loans Problem (대출 문제에서의 최선의 선택)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.21 no.5
    • /
    • pp.189-195
    • /
    • 2021
  • This paper discusses choice of loans problem(CLP) that is to minimize annual payment from which bank's borrows in multi-banks multi-nations with distinct interests. For the CLP, there is impossible to obtain the optimal solution actually without the help of mathematical software package as linear programming(LP). This paper applies the method used in transportation problem(TP) that finds initial feasible solution with selects minimum interest first, least cost method(LCM), to CLP. Result of experiment, the proposed algorithm can be obtains the optimal solution with at most two exchange optimization for LCM's initial feasible solution.

Cost Analysis of Using a Closed-System Transfer Device (CSTD) for Antineoplastic Drug preparation in a Malaysian Government-Funded Hospital

  • Chan, Huan Keat;Lim, Yik Ming
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.11
    • /
    • pp.4951-4957
    • /
    • 2016
  • Background: Apart from reducing occupational exposure to cytotoxic hazards, the PhaSeal(R) closed-system transfer device (CSTD) can extend the beyond-use dates (BUDs) of unfinished vials of antineoplastic drugs for up to 168 hours (seven days). In this study, the total material cost incurred by its use in a Malaysian government-funded hospital was calculated. Methods: A list of vial stability following initial needle punctures of 29 commonly-used antineoplastic drugs was compiled. The amount of the materials used, including drugs, infusion bottles, the PhaSeal(R) CSTD and other consumables, was recorded on a daily basis for three months in 2015. The total cost was calculated based on the actual acquisition costs, and was compared with that of a hypothetical scenario, whereby conventional syringe-needle sets were used for the same amounts of preparations. Results: The use of the PhaSeal(R) CSTD incurred a cost of MYR 383,634.52 (USD 92,072.28) in three months, representing an average of MYR 170.5 (USD 40.92) per preparation or an estimated annual cost of MYR 1,534,538.08 (USD 368,289.14). Compared with conventional syringe-needle approach, it is estimated to lead to an additional spending of MYR 148,627.68 (USD 35,670.64) yearly. Conclusion: Although there was a reduction of drug wastage achieved by extending BUDs of unfinished vials using the PhaSeal(R) CSTD, cost saving was not observed, likely attributable to the wide use of lower-priced generic drugs in Malaysia. Future studies should further evaluate the possibility of cost saving, especially in health settings where branded and high-cost antineoplastic drugs are more commonly used.

A Maintenance Model Applying Loss Function Based on the Cpm+ in the Process Mean Shift Problem in Which the Production Volume Decreases (생산량이 감소하는 공정평균이동 문제에서 Cpm+ 기준의 손실함수를 적용한 보전모형)

  • Lee, Do-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.1
    • /
    • pp.45-50
    • /
    • 2021
  • Machines and facilities are physically or chemically degenerated by continuous usage. The representative type of the degeneration is the wearing of tools, which results in the process mean shift. According to the increasing wear level, non-conforming products cost and quality loss cost are increasing simultaneously. Therefore, a preventive maintenance is necessary at some point. The problem of determining the maintenance period (or wear limit) which minimizes the total cost is called the 'process mean shift problem'. The total cost includes three items: maintenance cost (or adjustment cost), non-conforming cost due to the non-conforming products, and quality loss cost due to the difference between the process target value and the product characteristic value among the conforming products. In this study, we set the production volume as a decreasing function rather than a constant. Also we treat the process variance as a function to the increasing wear rather than a constant. To the quality loss function, we adopted the Cpm+, which is the left and right asymmetric process capability index based on the process target value. These can more reflect the production site. In this study, we presented a more extensive maintenance model compared to previous studies, by integrating the items mentioned above. The objective equation of this model is the total cost per unit wear. The determining variables are the wear limit and the initial process setting position that minimize the objective equation.

Efficient Evaluation Method of Operation Cost for Wastewater Treatment Plant by BTL Contract Type (하수처리시설 BTL사업의 합리적인 운영비 산정방안)

  • Kang, Leen Seok;Yoon, Sun MI;Kwon, Joong Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.627-634
    • /
    • 2009
  • The BTL (Build-Transfer-Lease) contract of construction project serves as a part for early establishment of industrial foundation for social overhead capital. However, project cost of BTL contract is focused on initial construction cost. Accordingly, operation cost is lowly evaluated because there is no standard criterion for estimating maintenance cost for the facility. The low operation cost can be a factor that reduces service quality of facility operation. This study suggests a resonable method for estimating cost and manpower in the operation phase by using the existing practical data for wastewater treatment plant by BTL contract. The results of the study can be used for evaluating rough operation cost and manpower of similar plant project by facility size.

Optimal Algorithm for Transshipment Problem (중개수송 문제 최적 알고리즘)

  • Lee, Sang-Un;Choi, Myeong-Bok
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.13 no.1
    • /
    • pp.153-162
    • /
    • 2013
  • This paper proposes the most simple method for optimal solution of the transshipment problem. Usually the transshipment problem is solved by direct linear programming or TSM (Transportation Simplex Method). The method using TSM has two steps. First it is to get a initial solution using NCM, LCM, or VAM, second to refine the initial solution using MOD or SSM. However the steps is complex and difficult. The proposed method applies the method that transforms transshipment problem to transportation problem. In the proposed method it simply selects the minimum cost of rows about transportation problem, and then it applies the method that assigns a transported volume as an ascending sort of the costs of rows about the selected costs. Our method makes to be very fast got the initial value. Also we uses the method that controls assignment volume, if a heavy item of cost is assigned to a transported volume and it has a condition to be able to transform to more lower cost. The proposed algorithm simply got the optimal solution with applying to 11 transshipment problem.

T-P Removal Efficiency According to Coagulant Dosage and Operating Cost Analysis (응집제 투입에 따른 인 제거 효율 및 운영비용 분석)

  • Yun, Soyoung;Ryu, Jaena;Oh, Jeill
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.34 no.8
    • /
    • pp.549-556
    • /
    • 2012
  • T-P removal efficiency was analyzed according to the metal to initial T-P ratio (mole basis) with respect to the samples from different WWTPs having various initial T-P and SS conditions. Also, operating costs were calculated based on the injected coagulant amount and the amount of sludge production. Most experiments were conducted by the standard jar-test protocol. Molar ratio of coagulant dose was varied considerably according to the initial SS concentration range in secondary clarifier effluent samples which had above 0.5 mg/L of initial T-P. Based on 90% T-P removal efficiency, results were: At the initial SS range of below 10 mg/L, Alum (8%) = 11 mol Al/mol P needed and PAC (17%) = 9.6 mol Al/mol P needed; At the initial SS range of above 10 mg/L, Alum (8%) = 3.9 mol Al/mol P needed and PAC (17%) = 3.2 mol Al/mol P needed.

Sensing Method of the Initial Rotor Position in Switched Reluctance Motors Using Search Coils (서치 코일을 이용한 스위치드 릴럭턴스 모터의 초기 회전자 위치 검출법)

  • Song J.S.;Yang H.Y.;Ryoo Y.J.;Lim Y.C.
    • Proceedings of the KIPE Conference
    • /
    • 2003.07b
    • /
    • pp.681-685
    • /
    • 2003
  • In this paper, an sensing method of initial rotor position in Switched Reluctance Motor(SRM) at standstill is proposed. In case search coils are used as a position sensor, A search coil used in a method of detecting positions of TSRM has many advantages, which is highly efficient in low cost and maintenance free, and characterized by its function and role as a position sensor. However, the initial rotor position detection is very difficult because the search coil's EMF is not exist at a standstill. In this paper, a new sensing method of initial rotor position using squared Euclidean distance at a standstill too is suggested. The simulation and experiment for the proposed method are achieved. The validity of the proposed method is verified by experimental results.

  • PDF