• 제목/요약/키워드: Informatization performance evaluation

검색결과 45건 처리시간 0.025초

국방정보화기본계획 성과 분석 및 평가 (Performance Analysis and Evaluation on the Defense Information Technology Master Plan)

  • 김수진;이승진;박태현;윤웅직;심승배
    • 한국IT서비스학회지
    • /
    • 제20권1호
    • /
    • pp.11-27
    • /
    • 2021
  • The defense IT master plan is the plan for promoting defense informatization and is established by the Ministry of National Defense every five years. In addition, an implementation plan has been established in accordance with the master plan every year to promote the informatization project. However, since there is no systematic methodology to check and analyze the master plan comprehensively, it is difficult to judge whether the goals suggested in the master plan are achieved, and continuous monitoring of the project is limited. This study proposes a concept and framework for defense IT investment management and proposes a methodology for examining and analyzing the progress of the defense IT plan by referring to the U.S. Department of Defense's IT Plan and the performance management structure of the national IT master plan. As a methodology for managing defense IT investment, we propose an IT investment management code system from the perspective of an IT portfolio and verify its applicability through case studies. The results of this study are expected to improve the defense IT performance management system and improve the efficiency and effectiveness of the defense IT project.

정부문서유통시스템의 효율성 측면에 대한 성과평가모델 분석 (The Analysis on Evaluation Model for Efficiency of GDOC)

  • 유은숙;도경화;정기원
    • 한국컴퓨터정보학회논문지
    • /
    • 제9권1호
    • /
    • pp.111-121
    • /
    • 2004
  • 본 논문에서는 정보화 투자에 대한 사전평가, 과정평가, 사후성과 평가를 통해 전자정부의 정보화 예산 투자에 대한 타당성과 효과성 측정 및 측정결과를 기반으로 투자대비 효과의 적합성을 제고 할 수 있는 계량적 평가모델을 제시하였다. 전자정부 과제로 추진된 정부전자문서유통센터 구축사업을 대상으로 정보화 투자에 대한 명확한 성과목표를 설정하고 사전평가 및 사후평가를 객관적으로 측정할 수 있는 핵심성과지표(KPI)를 개발하여 계량적 평가모델을 이용한 결과 활용도와 혁신 측면에서 각 지표 당 향상된 성과평가 결과를 도출하였다.

  • PDF

모기업 주도적 협력업체 정보화 사업 성과에 관한 연구: 삼성전자 사례 (A Study on the Performance of a Mother Company-Driven Informatization Project for its Suppliers: A Samsung Electronics Case)

  • 박광호;김상수;김호택
    • 경영정보학연구
    • /
    • 제8권3호
    • /
    • pp.225-243
    • /
    • 2006
  • 최근 대기업이 독자적으로 지원하는 모기업 주도적 협업 IT화 사업이 본격적으로 추진되고 있다. 모기업이 자체적으로 협력업체에 정보화 수준 평가를 위한 정보화 등급 체계를 설계하고 이를 기반으로 최우선적으로 협력업체가 조기에 ERP(Enterprise Resource Planning) 시스템 운영을 최고 수준으로 향상시켜 상생 협력 네트워크의 경쟁력을 강화 하자는 목표로 협업 IT화 사업을 추진하고 있는 것이다. 본 논문에서는 삼성전자가 독자적으로 추진해온 협업 IT화 사업이 초기 1년을 경과하고 있는 상황에서 사업 성과에 영향을 주는 주요 성공요인을 실증적으로 분석하고 이를 통해 장기적인 정책 수립과 지원 방향을 제시하고 있다. 연구 결과는 상생경영 기반 구축을 위한 정책 수립과 지속가능한 성과 유지를 위한 과제를 제시하는데 기여할 것으로 기대된다. 또한, 삼성전자 사례를 통해 국내 대기업이 추진하고 있는 협업 IT화 사업의 성공적 수행에도 활용될 것으로 예상된다.

국방물자정보시스템 성능개선 사업평가에 대한 사례 (A Case on the Evaluation of the Information System Project to Enhance the Performance of DIMS(Defense Material Information System))

  • 조성림;임규건;이대철
    • 한국IT서비스학회지
    • /
    • 제11권1호
    • /
    • pp.109-123
    • /
    • 2012
  • There are many evaluation models to measure the informatization level of an organization and information system project in the ministry of National Defense of Korea. A information system has to keep up with the environment change as well as the advanced recent information technology (IT). Therefore, the evaluation of an information system project to enhance the performance of the information system should be different from the existing evaluation methods. This study suggests an evaluation case of information system projects to enhance the performance of an information system. In order to achieve the objective of this study, the following steps are taken. First, it reviews the background and the scope of the project to enhance the performance of the Defense Material Information System (DMIS). And it sets up the evaluation logic and develops performance indexes. Then it applies these newly developed performance indexes to the information system project and measures the performance. From this study, we found that both the diffusion and the experience accumulation by its continuous use are significant factors in such evaluations.

운영 DB데이터 분석을 통한 G4C 전자정부 정보화 사업 투자 시차효과 분석 (An Analysis of the Time-Lag Effects on the Investment of G4C E-Government System by analysing DB Data)

  • 조남재;임규건;이대철
    • Journal of Information Technology Applications and Management
    • /
    • 제16권4호
    • /
    • pp.205-222
    • /
    • 2009
  • Considering time-lag in the performance evaluation of information system (IS) investment is important because its effect reveals after certain period of time passed. Particularly it is more in the systems of e-government informatization projects which the amount of investment and the scale of business are huge. Many methods to solve this issue have been proposed such as system dynamics methods, simulations, structural equations etc. However, it is still difficult and unsolved problem because collecting practical data for time-lag analysis is very hard. In this paper, we analyze IS time-lag effect through factor analysis using the accumulated practical operational DB data. For the performance evaluation of the G4C system, the representative e-government web portal, we selected eleven factors reflecting time passing in G4C DB data. With these factors this paper conduct time-lag analysis in four view points. First, we conducted 'Stabilizing of G4C system' and got a result that IS is needed about three years for the stabilization. Second, we conducted 'Utilization of G4C system' and got a result that the utilization reaches appropriate level after in three years later after the introduction of G4C system. Third, we conducted 'Cost reduction effect' and got a result that cost reduction is stable in the third year after the introduction of G4C system. Lastly, we conducted 'System maturity effect' and got a result that the system reaches to the quality level that users expect after third to fourth years. According to the results of this research, we found that performance of IS improv continuously not immediately, and it needs three or four years of time-lag.

  • PDF

전자정부 G2B 시스템의 성과평가 분석을 위한 새로운 평가 모델 및 방법론 개발 (Development of a new Model and Methodology for the Analysis of the Performance Evaluation of G2B Systems in e-government: EEM)

  • 임규건;이재규;이대철
    • 경영정보학연구
    • /
    • 제10권2호
    • /
    • pp.269-289
    • /
    • 2008
  • 전자정부 정보화 사업과 같은 규모와 그 범위가 거대하며, 한번에 모든 기존의 오프라인 프로세스가 온라인화 되지 않고 수년간에 걸쳐 그 효과가 나타나는 시스템의 파급효과에 대한 예측은 무척 난해한 문제이다. 이러한 e-transformation이 이루어지는 경우에는 지속적으로 모델의 수정 및 보완작업이 함께 이루어져야 한다. 이에 본 연구에서는 전자정부 정보화사업 중 하나인 G2B 시스템의 효과평가를 위해 EEM (E-transformation Evaluation Model)으로 명명한 새로운 모델과 평가방법론을 제시하고자한다. EEM 모델은 G2B 시스템으로 인해 e-transformation화된 업무프로세스 영역(온라인 영역)의 효과를 화폐가치로 산출하는 정량평가 모델이다. 또한 아직 G2B 시스템이 적응되지 않은 업무프로세스 영역(오프라인 영역)을 정보화시켰을 때 예상되는 효과를 함께 추정할 수 있도록 해준다. EEM 모델에서는 기준모델, 검증모델, 예측모델을 설정하고, 평가년도, 측정영역, 데이터종류에 따라 설문데이터와 DB 데이터를 함께 활용하여 모델을 검증하며 효과를 예측한다. 본 연구에서는 온라인과 오프라인 효과를 효과적으로 평가하기 위해 5단계와 10개의 세부절차로 구성된 EEM평가방법론을 제시하였다. 또한 제시된 방법론을 활용하여 대한민국 전자조달 G2B 시스템에 대해서 평가분석을 실시하였다. 본 연구에서 제시된 EEM 모델과 평가방볍론은 평가대상에 따라 다각적인 적응이 가능하므로 향후 전자정부 정보화사업의 효과평가와 정책수립에 도움이 될 것으로 기대된다. 뿐만 아니라 민간기업의 대형시스템 도입 효과평가에도 도움이 될 것으로 사료된다.

부합성 분석을 이용한 정보화지원사업 성과평가지표의 합리적 도출 방안 (A Rational Development Way of Performance Evaluation Measures for the Informatization Program using the Coincidence Analysis)

  • 김상훈;최점기;이훈희;박일규
    • 한국IT서비스학회:학술대회논문집
    • /
    • 한국IT서비스학회 2006년도 춘계학술대회
    • /
    • pp.583-592
    • /
    • 2006
  • 본 연구에서는 정보화지원사업에 대한 성과평가를 위해 도출된 각 평가항목의 측정지표들을 실제로 평가업무에 적용함에 있어서 그 사용의 용의성 및 신뢰성, 그리고 내용적인 적합성이 어느 정도 확보되어 있는지를 검증하는 일련의 부합성 분석절차를 개발${\cdot}$확립하였다.

  • PDF

투자영향분석을 기반으로 한 지식경영 평가방법론 프레임워크 (A Knowledge Management Assessment Framework Based on Impact of Investment)

  • 김관영;권오병
    • 지식경영연구
    • /
    • 제9권1호
    • /
    • pp.117-128
    • /
    • 2008
  • It is very crucial to establishing an evaluation framework for anayzing the investment effects of IT asset such as knowledge managment systems. However, evaluation by quantitative measures, in spite of its usefulness and reliability, may have weakness in examining wide range of effects of the IT investment. Hence, the purpose of this paper is to propose a novel framework to evaluate the performance in terms of wider range of informatization effects. To do so, knowledge management concepts has been adopted in the evaluation method, and Impact Of Investment(IOI) has been suggested. IOI is used to derive Value Of Investment(VOI) and then ROI.

  • PDF

Evaluation Method of College English Education Effect Based on Improved Decision Tree Algorithm

  • Dou, Fang
    • Journal of Information Processing Systems
    • /
    • 제18권4호
    • /
    • pp.500-509
    • /
    • 2022
  • With the rapid development of educational informatization, teaching methods become diversified characteristics, but a large number of information data restrict the evaluation on teaching subject and object in terms of the effect of English education. Therefore, this study adopts the concept of incremental learning and eigenvalue interval algorithm to improve the weighted decision tree, and builds an English education effect evaluation model based on association rules. According to the results, the average accuracy of information classification of the improved decision tree algorithm is 96.18%, the classification error rate can be as low as 0.02%, and the anti-fitting performance is good. The classification error rate between the improved decision tree algorithm and the original decision tree does not exceed 1%. The proposed educational evaluation method can effectively provide early warning of academic situation analysis, and improve the teachers' professional skills in an accelerated manner and perfect the education system.

정보화사업 성과 영향 요인 분석: 중앙행정기관 정보화사업 평가결과를 중심으로 (A Study on the Factors Affecting IT Project Performance: Focusing on the Results of K-PART of Central Government)

  • 최정아
    • 정보화정책
    • /
    • 제30권1호
    • /
    • pp.23-40
    • /
    • 2023
  • 1997년 정보화평가 시작 이후 평가 주관부처 및 평가방식 등의 많은 변화를 겪으며 현재 중앙행정기관 정보화사업에 대한 성과평가는 기획재정부의 재정사업자율평가가 시행되고 있다. 최근 정보화사업은 디지털뉴딜을 거쳐 디지털플랫폼정부 구현을 위해 예산이 큰 폭으로 증가하고 있으며 이에 따라 성과에 대한 관심도 높아지고 있다. 본 연구는 선행연구를 통해 성과 관련 특성을 선정하여 이에 따라 실제로 정보화사업 성과 차이가 있는지 실증 분석하였다. 분석 결과 신규사업, 처나 청에서 수행하는 사업은 최종평가점수에 통계적으로 유의미한 양의 영향을 미쳤다. 반면, 정보화지원사업과 기금사업은 최종평가점수에 통계적으로 유의미한 음의 영향을 미쳤다. 본 연구는 향후 새 정부의 디지털정부플랫폼 정부 구현, 공공데이터 개방 사업 등 정보화사업을 추진하고 이에 대한 성과를 평가할 때 사업의 고유한 특성에 따라 성과 차이가 발생할 수 있다는 점을 시사한다.