Development of Ground Control Point Collection and Management System based on High resolution Satellite Images

  • Kim, Kwang-Yong;Yoon, Chang-Rak;Kim, Kyung-Ok
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.343-345
    • /
    • 2003
  • This paper describes the system development for the Ground Control Point collection and management through the major coastline region in KOREA, which will collect and manage the ground control point based on high resolution satellite image database. The module of this system is following 1) GCP/Coarstline research plan module 2) GCP/Coarstline ground collection module 3) GCP/Coarstline post processing module Our team developed the core components of ‘High Resolution Satellite Image Processing Technique’ project, and this system, among applications of our project, is constructed to apply to practical use. In this application, you will also see how to apply core components of our project.

  • PDF

The Development of a Schedule Management Support System Using Productivity Information of Construction Activities (단위작업 생산성 정보를 활용한 공정관리 지원시스템 개발)

  • Oh, Se-Wook;Park, Sang-Gyu;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.181-192
    • /
    • 2005
  • Labor work information can be converted into the useful construction information in an effort to analyze project status, measure performance, and design a new similar project plan. The labor work information can also be used to make productivity data, which can be used to analyze the relationship between 'as planned' and 'as built' in scheduling management of a project, and to calculate 'percent completion' as well as analyzing delay cause. It is require to effectively collect the labor work information base on the activities. In general, current project management heavily depends on the experience and judgment of project managers, according to the work progress. However, relying on the oかy experience and judgment of the project managers might deteriorate the transparency or reliability of the collected labor work information. The purpose of this research is thus to develop a computer-based system for monitoring the work information generated by labors input in activities using PDA and Barcode technologies, and to propose a application method of the productivity data for effective project management.

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

A Study on the PIMS and 3D Simulation Application of the Construction Field (건설공사 현장에서의 PMIS와 3D Simulation 적용에 관한 연구)

  • Tak, Seung-Won;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.967-970
    • /
    • 2007
  • If is become complicated and jumbo a construction project. therefore, is increased complication the management by enormous information. In addition, According IT technology develops, it is the course taking in IT technology for Construction project and information of construction technology in an object positively, It introduces a IT technique in construction project get out of personal experiences and knowledge that the expert and information joint ownership and collection and accumulation gets possible to advantage managed to advantage of Construction project. Also The information joint ownership and project progress situation grasp of construction project participation wild for being smooth, it is become accomplished, This research introduces the necessity and meaning of the PMIS or similar solution which is information-oriented structure and a information system of Construction industry of present. It applies the PMIS and 3D Simulation System from site and analyzes to expectative effect of information system construction

  • PDF

A Study on the New RFP for the PMO-based Development of Next-Generation MIS (PMO 기반의 차세대 MIS개발을 위한 신RFP 작성 연구)

  • Han, Moonhee;Kim, Yousin;Kim, Dae Ho
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.11
    • /
    • pp.585-594
    • /
    • 2016
  • Information system development projects are increasingly enlarging in size and are becoming more complex in the development environment. The traditional approaches for the development of information system, however, haven't shown the expected performances in the management for them and many researchers have been trying to find a new approach for overcoming this challenges. And one of the new approaches is the PMO and it is introduced to solve the problems of project management and the related organizational, technical, and administrative problems. This study attempted to find the efficient information system establishment plan. In particular, this study wants to research the practicality of PMO and the detailed utilization plans. As a result, this study proposes the structure of project implementation, the requirements, the direction of the basic system design, the scope of system development, and the budgeting for the systems. It is expected to contribute the successful implementation of the project.

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF

Structural Equation Model for Information Technologization Success Index(ITSI) of Small and Medium Enterprise (구조방정식 모델을 이용한 중소기업의 IT화 성공지수(ITSI) 개발 연구)

  • Kim, Jung-Geon;Moon, Tae-Hee;Sohn, So-Young
    • IE interfaces
    • /
    • v.17 no.3
    • /
    • pp.338-348
    • /
    • 2004
  • OECD countries including Korea positively adopt performance-based budget systems which convert an input-centered system to an output-centered system to solve two baffling problems: public expense retrenchment and efficiency recovery of government management. Output management of IT project propelled in public sector becomes a prominent figure influenced by these keynote of policy. However, it is placed in difficult circumstances to develop a performance index and the methodology to cover characteristics of IT project, measuring the goal achievement of business and the customer contentment according to the phases of business progress. Existing studies of IT project accomplishment measurement have been fulfilled on the subject of business targeting on IT technology application, administrative information network business and national base of information network construction. Most of the studies have been executed using BSC or AHP to reflect synthetically business specifics of IT project from a methodological point of view. In this study, we propose a structural equation model (SEM) to develop a performance index which measures the outcome of IT project according to the phases of business progress, avoiding a simple presentation of project outcome or conceptual frame. The proposed SEM is applied to the survey results of "IT support project for Small and medium business". Based on the fitted model, we apply ACSI concept to develop an Information Technologization Success Index (ITSI). This index allows us comparison of several IT vendors as well as feedback information for further improvement.

A Study on the PSP-Platform for the Atomicity of Distributed Ledger

  • Lee, Eun-Hee;Yoon, Yong-Ik
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.5
    • /
    • pp.73-80
    • /
    • 2019
  • In Korea, a budget of tens of trillion won is put into the national R & D project every year. Thanks to these efforts, Korea's ICT industry is gaining global attention. However, there are still a lot of problems that are lacking in terms of the cycle of managing national ICT R&D projects. In particular, the issue of sharing is very insufficient throughout the cycle of the national ICT R&D. In this paper, In this paper, We propose a platfom that can be shared throughout the cycle of managing blockchain-based national ICT R&D projects. This platform we call the Perfect Sharing Project Platform (PSPP). We describe that PSPP can achieve excellent research results through information sharing of project process[1-2]. To support the perfect sharing, this platform uses a new notion of consensus algorithm, called POA (Proof of Atomicity). This platform is suitable for sharing information.

A Standardized BIM Framework for Supporting Life-cycle Business Process for Port & Harbour Facilities (항만시설의 생애주기 업무 지원을 위한 BIM 표준 프레임워크 구축)

  • Moon, Hyoun-Seok;Won, Ji-Sun;Shin, Jae-Young
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.49-59
    • /
    • 2018
  • Recently, the application of BIM for port & harbour facilities has been increasing, as it is widely applied to the infrastructure field both at domestic and abroad. However, the port and harbour projects still have very poor facilities information management system and the application level of BIM is very low compared to other facilities. Even if BIM is applied for those project, it is very difficult to determine in advance what information is needed without an accurate understanding of the business process. The purpose of this study is to develop a BIM framework for port & harbour facilities and to examine its applicability. To do this, we structured the classification of the port & harbour facilities and constructed object-based classification system based on ISO12006-3 standard. We also derived the BIM framework requirements from the viewpoint of process, standard, interface, and information, and confirmed the linkage of the BIM object classification system in the framework item. The applicability of the BIM framework for inspection process cases of port & harbour was examined. Accordingly, this study can solve requirement setting method, which is the non - procedural and non - systematic project information, in the BIM application process of the port & harbour project with the BIM framework. In addition, the framework is expected to be integrated into the system to play a key role in the selection of project objectives, and the ability to clearly identify the information requirements required by the BIM manager to perform the project.

A Study on the Suitability of Unified Project Management Framework Applying for IT Services in Public Organizations (공공기관 IT 서비스 종합관리 프레임워크 도입의 적정성 연구)

  • Park, Min-Kuk;Park, Dae-Ha
    • Journal of Service Research and Studies
    • /
    • v.7 no.3
    • /
    • pp.21-36
    • /
    • 2017
  • Recently in information business, managing and auditing are getting more difficult because of enlargement, intellectualization and convergence. In addition, ordering organizations have been having a difficult time choosing a service because not only there is a huge overlap between information audit system and PMO but also the work boundaries of those two are not clear enough. As the demand that a business managing and auditing frame work need to be more developed in terms of independence, quality, economic feasibility and responsibility has been increased, the Korea Association Of Information Systems Audit has been attempting to improve business management and audit system by proposing Unified Project Management Framework whose process is approximately constructed. This study introduces Unified Project Management Framework which is all-encompassing from the ordering at the very beginning of business to the operating in the post-processing step and then verifies its work scope through a comparative analysis with existing management systems. Also, this thesis examines the necessity of unification of audit system and PMO by analysing existing similar systems. At the end, this study, analyses the suitability of Unified Project Management Framework by evaluating it with IT goal frame of COBIT5 which is constructed based on BSC performance management index. The result of the analysis is expected to help people in charge understanding the features of Unified Project Management Framework before they apply it to practical business.