• Title/Summary/Keyword: Industrial site

Search Result 1,778, Processing Time 0.027 seconds

Study about the Applicable Plan of GIS on Range of Magnetic Field Emitted from 60 Hz Powerline (60Hz 고압 송전선로의 자기장 발생범위에 대한 GIS 적용 방안에 대한 연구)

  • Hong, Seung Cheol;Choi, Seong Ho;Kim, Yoon Shin;Park, Jae Young
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.4
    • /
    • pp.271-277
    • /
    • 2006
  • In this study, we investigated the applicable plan of GIS on the environmental impact assessment of 60 Hz Powerline. So we assessed distance data based on calculations by use of 2D and 3D Geographical information systems(GIS) and distance data based on measurements on 1: 5000 maps accord with on site distance measurements to use input data for calculating magnetic field. One hundred eight of the on site measured addresses were selected from residences. The data were achieved by measuring the distance between residence and power line on maps with scales of 1: 5000. The digital map was obtained from National Geographic Information Institute with scales of 1: 5000, and we made 2D and 3D map. Correlation analyses were performed for statistical analyses. For the 3D GIS versus on site comparison of different exposure categories, 70 of 108 measurements were assigned to the correct category. Similarly for 2D GIS versus on site comparison, 71 of 108 were correctly categorized. When comparing map measurement with on site measurement, 62 of 108 were correctly categorized. When the correlation analysis was performed, best correlation was found between 3D GIS and on site measurements with r = 0.84947 (p<0.0001). The correlation between map and on site measurement yielded an r of 0.76517 (p<0.0001). Since the GIS measurements and map measurement were made from the center point in the building and the on site measurements had to be made from the closest wall on the building, this might introduce and additional error in urban areas. The difference between 2D and 3D calculations were resulted from the height of buildings.

Forecasting the Demand Areas of a Factory Site: Based on a Statistical Model and Sampling Survey (공장용지 수요 추정 모형 개발 및 수요예측)

  • Jeong, Hyeong-Chul;Han, Geun-Shik;Kim, Seong-Yong
    • The Korean Journal of Applied Statistics
    • /
    • v.24 no.3
    • /
    • pp.465-475
    • /
    • 2011
  • In this paper, we have considered the problems of the estimation of the gross areas of a factory site relating to the areas of industrial complex lands based on a statistical forecasting model and the results of a sampling survey. In respect to the data of a gross areas of a factory site, we have only the sizes from 1981-2003. In 2009, the Korea Industrial Complex Corp. conducted a sampling survey to estimate its bulk size, and investigate the demands of its sizes for the next five years. In this study, we have adopted the sampling survey results, and have created a statistical growth model for the gross areas of a factory site to improve the prediction for the areas of a factory site. The three-different parts of data: the results of areas of a factory site by Korea National Statistical Office, imputation results by the statistical forecasting model, and sampling survey results have used as the basis for analysis. The combination of the three-different parts of data has created a new forecasting value of the areas of a factory site through the spline smoothing method.

Characteristics of Hazardous Air Pollutants in the Steel Industrial City, Pohang ( I ) - Polycyclic Aromatic Hydrocarbons (철강산업도시 포항지역 유해대기오염물질의 오염특성 ( I ) - 다환방향족탄화수소)

  • Baek, Kyung-Min;Seo, Young-Kyo;Cho, Byoung-Yoon;Baek, Sung-Ok
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.34 no.2
    • /
    • pp.233-243
    • /
    • 2018
  • This study was carried out to characterize the ambient levels of PAH concentrations in Pohang city, where steel industry has been intensively developed. A large amount of PAH emissions from steel production and related industries in Pohang are concerned about the environmental health hazards of nearby residents. TSP samples were seasonally collected during 10 days at four sites in Pohang from April to December 2010. Each sample was collected for 24 hours using high-volume air sampler. All samples were extracted by $soxtec^{TM}$ before concentration of 1.0 mL. The concentrates were analyzed by GC/MS. The prevailing wind direction was southwest and west-southwest in Pohang during the measurement period. Variations of TSP concentrations appeared to be similar between four sites. The highest TSP concentration was found in fall, while the lowest in summer. The highest PAH concentration was found at an industrial site, while the lowest at a residential/commercial site. In the case of BaP, the average concentration at the industrial site was $0.63{\pm}0.66ng/m^3$, which was approximately 2 times of the residential/commercial site. The paired t-test (p<0.05) showed significant differences between industrial and residential area. Particulate PAH concentrations were higher in the winter and lower in the summer. The concentrations of BaP in winter were 2~10 times higher than those in the other three seasons. This study clearly demonstrated the impact of steel industry on the elevated levels of PAH in Pohang city.

A Study on Industrial Site Annexed Parking Unit Calculation Method by Considering Facility Use and Scale Characteristics (용도 및 규모특성을 고려한 산업단지 공장시설의 부설주차장 설치기준 개선방안 연구)

  • Ahn, Woo-Young;Lee, Seon-Ha
    • International Journal of Highway Engineering
    • /
    • v.12 no.2
    • /
    • pp.129-136
    • /
    • 2010
  • The present annexed parking lot standards for buildings in Parking Act are categorized in 9 groups in terms of recreation, culture and assembly, housing, factory, and so on, in which same grouped facilities have uniform parking standards. The local governments have authority to itemize groups and adjust parking standards within ${\pm}50%$ ranges. These days diversity in building types and functions need more fractionated parking standards; however, most local governments focusing merely on applying strengthened parking standards in general without systematic rules of consistency. The current problem of parking standards being used is lack of regarding facility characteristics; expecially, a large sized high-tech manufacturing facility located in industrial site is still applied by same parking standards as normal manufacturing facility, even though most part of manufacturing process is automated and hence less manpower is employed. This paper presents a systematic method of analyzing parking generation unit for factory facilities in industrial site in terms of facility use and scale characteristics.

A Study On the Safety Management of construction equipment Using Smart Phone Technology (Focused on poclain and mobile elevated work platform) ("스마트폰" 기반을 활용한 건설장비 안전관리에 관한 연구 (굴삭기, 고소작업대 중심으로))

  • Cho, Joung-Ho;Lim, Jae-Chang;Ko, Young-Wook;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.2
    • /
    • pp.1-9
    • /
    • 2012
  • As contemporary building construction type is getting higher and deeper, construction equipment usage is getting more, and related fatal accidents are on an increasing trend. Because of this, a method was drawn which could grasp the present state of construction equipment management and manage safety of the equipment more easily for accident prevention by choosing 2 kinds of Construction equipment which cause safety accident frequently among the equipment mainly used in construction site. This study suggested a method about construction equipment safety management using "smart phone" base which could be used in safety management for construction equipment by whomever in construction site. After attachment of QR code included safety checklist, It became possible that site managers could check more efficiently by scanning with their smart phone when they inspect equipment. Moreover, by the construction interested who didn't know what and how they have to inspect could point out unsafe condition in the early stage of equipment entering or take unsafe one out of the site by using new smart phone safety checking system is installed, it became possible that critical accident caused by construction equipment was prevented in advance.

A Study on Parking Generation Forecasting Model for Factory Facilities in Industrial Site (산업단지 공장시설의 주차수요예측모형 구축에 관한 연구)

  • Ahn, Woo-Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.37-44
    • /
    • 2010
  • The present annexed parking lot standards for buildings in Parking Act are categorized in 9 groups with 13 parking standards in terms of recreation, culture and assembly, housing, factory, warehouse, and so on, in which same grouped facilities have same parking standards. These days diversity in building types and functions need more fractionated parking standards; however, most local governments focusing merely on applying strengthened parking standards in general without systematic rules of consistency. The current problem of parking standards being used is lack of regarding facility characteristics; expecially, a large sized high-tech manufacturing facility located in industrial site is still applied by same parking standards as normal manufacturing facility, even though most part of manufacturing process is automated and hence less manpower is employed. This paper presents a parking generation forecasting model for factory facilities in industrial site in terms of facility use and scale characteristics.

Current Practices of the Customer-Oriented Web Site Development Methodologies and their Evaluation (고객지향적 웹 사이트 개발 방법론의 현황과 평가)

  • 이선로;김기영
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.1
    • /
    • pp.15-37
    • /
    • 2004
  • This study attempts to investigate the industrial practices of the web site development methodologies and their impacts on the web site development project performance. Most of Korean web site development firms currently use customized component-based development(CBD) methodologies that have been internally developed. The methodologies generally being accepted by web site developers, however, did not emerge yet. In addition, this study shows that indiscreet applications of various methodologies and techniques might cause negative impacts on the project performance since the web site development projects are also exposed to most of the risk factors identified in the traditional systems development.

  • PDF

토양 및 지하수 Investigation 과 Remediation에 대한 현장적용

  • Wallner, Heinz
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2000.11a
    • /
    • pp.44-63
    • /
    • 2000
  • Situated close to Heathrow Airport, and adjacent to the M4 and M25 Motorways, the site at Axis Park is considered a prime location for business in the UK. In consequnce two of the UK's major property development companies, MEPC and Redrew Homes sought the expertise of Intergeo to remediate the contaminated former industrial site prior to its development. Industrial use of the twenty-six hectare site, started in 1936, when Hawker Aircraft commence aircraft manufacture. In 1963 the Firestone Tyre and Rubber Company purchased part of the site. Ford commenced vehicle production at the site in the mid-1970's and production was continued by Iveco Ford from 1986 to the plant's decommissioning in 1997. Geologically the site is underlain by sand and gravel, deposited in prehistory by the River Thames, with London Clay at around 6m depth. The level of groundwater fluctuates seasonally at around 2.5m depth, moving slowly southwest towards local streams and watercourses. A phased investigation of the site was undertaken, which culminated in the extensive site investigation undertaken by Intergeo in 1998. In total 50 boreholes, 90 probeholes and 60 trial pits were used to investigate the site and around 4000 solid and 1300 liquid samples were tested in the laboratory for chemical substances. The investigations identified total petroleum hydrocarbons in the soil up to 25, 000mg/kg. Diesel oil, with some lubricating oil were the main components. Volatile organic compounds were identified in the groundwater in excess of 10mg/l. Specific substances included trichloromethane, trichloromethane and tetrachloroethene. Both the oil and volatile compounds were widely spread across the site, The specific substances identified could be traced back to industrial processes used at one or other dates in the sites history Slightly elevated levels of toxic metals and polycyclic aromatic hydrocarbons were also identified locally. Prior to remediation of the site and throughout its progress, extensive liaison with the regulatory authorities and the client's professional representatives was required. In addition to meetings, numerous technical documents detailing methods and health and safety issues were required in order to comply with UK environmental and safety legislation. After initially considering a range of options to undertake remediation, the following three main techniques were selected: ex-situ bioremediation of hydrocarbon contaminated soils, skimming of free floating hydrocarbon product from the water surface at wells and excavations and air stripping of volatile organic compounds from groundwater recovered from wells. The achievements were as follows: 1) 350, 000m3 of soil was excavated and 112, 000m3 of sand and gravel was processed to remove gravel and cobble sized particles; 2) 53, 000m3 of hydrocarbon contaminated soil was bioremediated in windrows ; 3) 7000m3 of groundwater was processed by skimming to remove free floating Product; 4) 196, 000m3 of groundwater was Processed by air stripping to remove volatile organic compounds. Only 1000m3 of soil left the site for disposal in licensed waste facilities Given the costs of disposal in the UK, the selected methods represented a considerable cost saving to the Clients. All other soil was engineered back into the ground to a precise geotechnical specification. The following objective levels were achieved across the site 1) By a Risk Based Corrective Action (RBCA) methodology it was demonstrated that soil with less that 1000mg/kg total petroleum hydrocarbons did not pose a hazard to health or water resources and therefore, could remain insitu; 2) Soils destined for the residential areas of the site were remediated to 250mg/kg total petroleum hydrocarbons; in the industrial areas 500mg/kg was proven acceptable. 3) Hydrocarbons in groundwater were remediated to below the Dutch Intervegtion Level of 0.6mg/1; 4) Volatile organic compounds/BTEX group substances were reduced to below the Dutch Intervention Levels; 5) Polycyclic aromatic hydrocarbons and metals were below Inter-departmental Committee for the Redevelopment of Contaminated Land guideline levels for intended enduse. In order to verify the qualify of the work 1500 chemical test results were submitted for the purpose of validation. Quality assurance checks were undertaken by independent consultants and at an independent laboratory selected by Intergeo. Long term monitoring of water quality was undertaken for a period of one year after remediation work had been completed. Both the regulatory authorities and Clients representatives endorsed the quality of remediation now completed at the site. Subsequent to completion of the remediation work Redrew Homes constructed a prestige housing development. The properties at "Belvedere Place" retailed at premium prices. On the MEPC site the Post Office, amongst others, has located a major sorting office for the London area. Exceptionally high standards of remediation, control and documentation were a requirement for the work undertaken here.aken here.

  • PDF

Quality Control and Characteristic of Eddy Covariance Data in the Region of Nakdong River (낙동강 유역에서 관측된 에디 공분산 자료의 품질 관리 및 플럭스 특성)

  • Lee, Young-Hee;Lee, Byoungju;Kahng, Keumah;Kim, Soo-Jin;Hong, Seon-Ok
    • Atmosphere
    • /
    • v.23 no.3
    • /
    • pp.307-320
    • /
    • 2013
  • We performed comprehensive quality control for eddy-covariance measurements from 3 farmland sites and 1 industrial site adjacent to Nakdong river. The quality control program is based on Foken and Wichura (1996) and Vicker and Mahrt (1997) and we added criteria for trend and standard deviation for scalar variables and modified criteria for non-stationarity condition of Foken and Wichura (1996) to consider random error of fluxes. The classification of data quality is designed for the raw data and the processed flux data, separately. Use of added criteria efficiently reduces the number of outlier for water vapor and $CO_2$ fluxes and use of modified criteria for non-stationarity reduces the number of outlier for scalar fluxes and increases the number of data with accepted quality for further work. Energy balance ratio is higher in farmlands than industrial site, which is due to neglect of heat storage term in industrial site. Among farmland sites, C4 site shows higher energy balance ratio than other sites. This is due to more homogeneous surface of C4 site than other farmland sites. However, energy balance ratio is very low or even negative at night. Mismatch between the flux footprint and the other energy component footprint over the heterogeneous surface is main cause for energy imbalance at night. Other possible causes are also discussed.