• Title/Summary/Keyword: Industrial Plant Project

Search Result 75, Processing Time 0.027 seconds

Efficient Evaluation Method of Operation Cost for Wastewater Treatment Plant by BTL Contract Type (하수처리시설 BTL사업의 합리적인 운영비 산정방안)

  • Kang, Leen Seok;Yoon, Sun MI;Kwon, Joong Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.627-634
    • /
    • 2009
  • The BTL (Build-Transfer-Lease) contract of construction project serves as a part for early establishment of industrial foundation for social overhead capital. However, project cost of BTL contract is focused on initial construction cost. Accordingly, operation cost is lowly evaluated because there is no standard criterion for estimating maintenance cost for the facility. The low operation cost can be a factor that reduces service quality of facility operation. This study suggests a resonable method for estimating cost and manpower in the operation phase by using the existing practical data for wastewater treatment plant by BTL contract. The results of the study can be used for evaluating rough operation cost and manpower of similar plant project by facility size.

A Work Scheduling Based on Analysis of Performance Data (실적자료분석(實績資料分析)에 의(依)한 일정계획(日程計劃))

  • Kim, Dong-Chan;Kim, U-Sik
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.4 no.2
    • /
    • pp.59-66
    • /
    • 1978
  • This paper is a work scheduling for design of piping Department of chemical plant using accumulated curve. Accumulated curve prepared by analysis of performance data, collected executed manhours for chemical plant of "D" Company during the past two years. It compared scheduled manhours with actual used manhours up to six months, put into the form of figures and charts the results can he summarized as below; 1) It can he found an important factor of critical control thus piping department got 30% of total scheduled menhours. 2) A plan of manpower mobilization can be scheduled before work starting. 3) Project progress can he found easily as put into the form of figures and charts for schedule to actual.

  • PDF

The Effects of R&D Project Managers' Leadership on Product Development Performance: Focused on the Mediating Effects of Project Sponsor Roles (R&D 프로젝트 관리자의 리더십이 제품개발 성과에 미치는 영향: 프로젝트 스폰서 역할의 매개효과를 중심으로)

  • Lee, Rok;Jun, In-Sun;Park, Ju-Gyeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.70-80
    • /
    • 2020
  • This study examined the effects of the R&D project managers' leadership on the product development performance. A survey was carried out empirically on a group of 175 experts associated with project management R&D operations in the field of manufacturing, construction engineering, shipbuilding, plant, and IT. The survey results showed that the effects of the R&D project managers' leadership on the product development performance were not significant, and the mediating effects of the project sponsor roles were significant. This means that the leadership of leaders, which requires efficient control and management based on complicated intergroup relationships and roles, is important in a project involving experts from the professional field. This suggests that the efficient leadership of leaders can improve the performance through the cooperation of members in the organization and aggregation of their core competencies in a limited time. Overall, the key results of this study mean that project leaders should play an active mediating role to maximize their leadership and enhance the role of project sponsors. In addition, the mediating role of project sponsors has an effect on the leadership of project managers, affecting the project performance quality.

The Application of Project control Techniques to Process Control: The Effect of Temporal Information on Human Monitoring Tasks

  • Parush, A.;Shtub, A.;Shavit, D.
    • Transactions on Control, Automation and Systems Engineering
    • /
    • v.3 no.1
    • /
    • pp.10-14
    • /
    • 2001
  • We studied the use of time-related information, with and without prediction, to support human operators performing moni-toring and control tasks in the process. Based on monitoring and control techniques used for Project Management we developed a display design for the process industries. A simulated power plant was used to test the hypothesis that availability of predictions along with information on past trends can improve the performances of the human operator handling faults. Several designs of dis-plays were tested in the experiment in which human operators had to detect and handle two types of faults(local and systems wide) in the simulated electricity generation process. Analysis of the results revealed that temporal data, with and without prediction, signifi-cantly reduced response time. Our results encourage the integration of temporal information and prediction in displays used for the control processes to enhance the capabilities of the human operators. Based on the analysis we proposed some guidelines for the de-signer of the human interface of a process control system.

  • PDF

Plan of BIM-based Quantity Take-off for Nuclear Power Plant Decommissioning (BIM을 활용한 원전 해체 물량산출 방안)

  • Jung, In-Su;Won, Ji-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6297-6304
    • /
    • 2015
  • Nuclear power plant decommissioning has attracted attention according to the shutdown decision of Kori 1 which is Korea's first nuclear power plant. Nuclear power plant decommissioning is the one who never experienced ever in our country. So, its process is difficult and time-consuming. In addition, it is difficult to determine the decommissioning quantity. This study proposed the plan that can be used in quantity take-off for nuclear power plant decommissioning using BIM technology being utilized in recent construction industry. As a result, we suggested the method of BIM-based quantity take-off such as the selection decommissioning method and process, setting up of BIM modeling environment, establishment of OBS & WBS, integrated BIM modeling, the definition of quantity property. The proposed plan can be utilized usefully from when permanent stopping nuclear power plant occurs intensively. Furthermore, the overseas nuclear power plant decommissioning project order also are expected through technology securement based on this plan.

The Study on DSA of Intergrated Operating System (통합운영체계의 DSA 적용 연구)

  • Cho, Nam-Bin
    • Proceedings of the KIEE Conference
    • /
    • 2002.07d
    • /
    • pp.2322-2324
    • /
    • 2002
  • Korea Water Resources Corporation (KOWACO) operates nine hydroelectric power stations on the Han River, Nakdong River, Geum River & Seomjin River Areas. KOWACO will take the lead in improving the efficiency of water resources supply in this parer, KOWACO Generation Intergrated Operating System(GIOS) project will improve the generating plant, hydraulic structures, switchgear, and station controls, alarms and services for unmanned remote controlled operation by modern intergraed SCADA system. Mordern SCADA is used to cover all computer systems designed to perform the following main functions: - to collect data from industrial plant devices. - to process and perform calculations on the collected. - to present collected and derived data on displays on. - to accept commands entered by human operators and act on them such as sending control commands to plant devices.

  • PDF

Intelligent Information Technologies for Integrated Management Systems of Enterprises with A Complex Scheme of Gas-Extraction and Processing

  • Matvienko, Evgeny V.;Adilov, F.T.;Ivanyan, A.I.
    • Journal of Multimedia Information System
    • /
    • v.2 no.3
    • /
    • pp.249-254
    • /
    • 2015
  • This article considers the development of an integrated control and safety management system (ICSS) and its interfaces with an automated enterprise management system (AEMS) in light of the establishment of industrial enterprises with intelligent model of centralized management on the example of Kandym GPP.

Waste Reduction Always Pays

  • Lee, B.M.
    • Applied Chemistry for Engineering
    • /
    • v.3 no.2
    • /
    • pp.194-200
    • /
    • 1992
  • Dow has made waste reduction a priority at its facilites around the world. In 1986, the company formalized its waste reduction under a program called WRAP-Waste Reduction Alwasy Pays. The objectives of WRAP are to seek out cost effective projects that reduce waste to the environment, measure and track performance, and recognize employee excellence. The successful examples of Dow's WRAP Program are introduced as follows : 1. By-Product Feedstock Optimization. 2. Plastics Reclamation. 3. Glucol II Plant Absorber Water Upgradele. 4. Loss Reduction Project.

  • PDF

A Systems Engineering Approach for Developing An Automated Raw Material Sampling Plant (원료 샘플링 플랜트 자동화 시스템 개발을 위한 시스템엔지니어링 접근방안 연구)

  • Kwouk, Ho-Kyun;Hong, Dae-Geun;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.55-65
    • /
    • 2015
  • In steel making plant, sampling system for raw material such as iron ore, limestone is necessary for quality control purpose. For the sake of efficiency and productivity, automation of the sampling system is highly desirable. From technical standpoint, the development of the automated system requires multi-disciplinary domain knowledge such as mechanical engineering, industrial engineering, information technology and computer engineering. Up to present time, the development has been mainly carried out by a single domain expert with project manager. The automated system developed in this way caused problems in the final system. This paper suggests a systems engineering approach to the development of automation for raw material sampling plant via a tailored process called Plant Systems Engineering (PSE) Process based on ISO/IEC 15288. Through the PSE process, we could derive right requirements and architecture of the Systems Of Interest (SOI), and we were convinced that the PSE Process can be applied to many other Plant Systems.

Advanced Korean Industrial Safety and Health Policy with Risk Assessment

  • Kwon, Hyuck-Myun;Cho, Jae-Hyun;Moon, Il;Choi, Jae-Wook;Park, Doo-Yong;Lee, Young-Soon
    • Safety and Health at Work
    • /
    • v.1 no.1
    • /
    • pp.29-36
    • /
    • 2010
  • This article describes a systematic roadmap master plan for advanced industrial safety and health policy in Korea, with an emphasis on. Since Korean industries had first emergence of industrial safety and health policy in 1953, enormous efforts have been made on upgrading the relevant laws in order to reflect real situation of industrial work environment in accordance with rapid changes of Korean and global business over three decades. Nevertheless, current policy has major defects; too much techniques-based articles, diverged contents in less organization, combined enforcement and punishments and finally enforcing regulations full of commands and control. These deficiencies have make it difficult to accommodate changes of social, industrial and employment environment in customized fashion. The approach to the solution must be generic at the level of paradigm-shift rather than local modifications and enhancement. The basic idea is to establish a new system integrated with a risk assessment scheme, which encourages employers to apply to their work environment under comprehensive responsibility. The risk assessment scheme is designed to enable to inspect employers' compliances afterwards. A project comprises four yearly phases based on applying zones; initially designating and operating a specified risk zone, gradually expanding the special zones during a period of 3 years (2010-2012) and the final zone expanded to entire nation. In each phase, the intermediate version of the system is updated through a process of precise and unbiased validation in terms of its operability, feasibility and sustainability with building relevant infrastructures as needed.