• Title/Summary/Keyword: Industrial Construction

Search Result 3,645, Processing Time 0.028 seconds

4th Industrial Revolution for Prevention of Safety Accident at Construction Site Based on IT Convergence Technology Virtual reality simulation development (건설현장 안전사고 예방을 위한 4차산업혁명 IT융합기술기반 가상현실 시뮬레이션 개발)

  • Kim, Dae-Geon;Park, Tae-Hyeon;Park, Ju-Yeong;Park, Su-jin;Lee, Dong-Oun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.173-174
    • /
    • 2018
  • Recently, a growing number of accidents have taken place at construction sites, causing serious casualties. To prevent accidents or minimize damage, it is necessary to develop the safety precautions education is essential. However, the effects of safety education do not have as much effect as the importance of safety education. so As a new direction, we are looking forward to effective education by simulating realistic environments using VR. The safety training method used to experience and learn dynamic situations in a limited room wearing HMD is combined with VR. It will be the start of the construction industry going forward.

  • PDF

A Study on the Body Welding Operation Scheduling Considering the Assembly Line's Input Sequence in Construction Equipment Manufacturing (건설기계 조립 라인 투입 순서를 고려한 제관 공정 생산 스케줄링에 관한 연구)

  • Kim, Ki-Dong;Choi, Ho-Sik
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.69-76
    • /
    • 2007
  • The body of an excavator, one sort of the construction equipment, consists of mainframe part, track frame part, boom part and arm part. The all parts are manufactured in the body welding operation. The scheduling in the body welding operation of a construction equipment manufacturing is to take all the various constraints into consideration. The offset time, due date, daily capacity of operations, daily jig's capacity, precedence relation, outsourcing, alternative resource and all of the shop floor environment should be considered. An APS(Advanced Planning & Scheduling) system is a proper and efficient system in such circumstance. In this paper, we present an APS system, the optimal scheduling system for the construction equipment manufacturing specifically for the body welding operation, using ILOG Solver/Scheduler. ILOG Solver/Scheduler is a general purposed commercial software which supports to find a feasible or optimal solution using object oriented technique and constraints satisfaction programming, given constraints and objectives.

  • PDF

산업안전교육이 건설현장에 미치는 영향에 관한 실증적 연구

  • Jo, Jae-Hwan
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.51
    • /
    • pp.75-83
    • /
    • 2010
  • In terms of deregulation requests from business, incidents at construction sites are rapidly increasing after reducing the regular safety training hours. Especially, to prevent incidents through safety trainings for construction site workers, who have lots of hazardous tasks than general manufacturing, is not only to protect property of both the companies and the country but also to increase their profits. That is why there are loud voices regarding that the safety training is a core mandatory to prevent industrial incidents. But, most companies, as soon as the deregulation for safety training is implemented, mitigated conducting safety trainings to prevent incidents. With this, theincidents are currently to be increased and caught in a vicious circle of many incidents at the smaller companies because of their absentmindedness regarding safety training due to their poorness as subcontractors of major companies, comparing to major companies. This study explains that incident factors are roughly divided into technical factor, managerial factor, and educational factor. And, we confirmed that the educational factor led by deficiency safety awareness and knowledge was the major factor.

  • PDF

TAGUCHI OPTIMIZATION OF DISPLACEMENTS DURING THE DESIGN PHASE OF A CONSTRUCTION PROJECT

  • E.S. N. Telis;G. J. Besseris
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.721-728
    • /
    • 2007
  • The prediction of quality characteristics during the design phase of a construction project was fragmented, because no particular method exists. One of the most important key responses is the total displacements (horizontal and vertical). A brainstorming session produces the quality parameters i.e. the control factors which here are identified as: the steel joint, the pile's length, the excavation depth and angle, the distance between the piles, the anchor stretch and length to name just some of the most engaging in the design. The purpose of this study is to optimise these parameters to minimize the total displacements following a methodology based on Taguchi method. For this reason, a 2-level, L8 orthogonal array has been employed to organize the experimentation. Data is obtained from a real-life excavation project designed on the Plaxis v.8 CAE package. Taguchi analysis is performed in the statistical package Minitab.

  • PDF

Present and Future of Risk Management of Construction Practice in Asia

  • Watanabe, Tsunemi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.4-5
    • /
    • 2015
  • Owning to rapid infrastructure development, Asia is experiencing dramatic economic growth. There are not a few cases in which, however, economic growth is achieved by increasing the external diseconomy. Pursuit of sustainable development is one of the most important issues for mankind. Under the post-industrial capitalism society, however, there seems a big risk of increase in the external diseconomy worldwide. The objectives of this manuscript are to discuss importance of risk management of construction practice in present and future. Regarding the latter, a particular attempt is made to discuss how project risk communication should be done to reduce the external diseconomy. Presently, one of the important issues in implementation of infrastructure projects is practice of risk management to properly manage time, cost, quality, and safety: mainly maximization of internal economy. Multi-party risk and uncertainty management process (MRUMP) is one of tolls to assist it. The idea on MRUMP can be used to reduce the external diseconomy through identifying, sharing, and tuning people's rhythms.

  • PDF

Experimental Study on Steel Truss Structure for Safety Lintel in Masonry Construction -Focusing on Door Frame Top Lintel at Typical Floor Apartment- (조적공사 인방보용 강재트러스 구조물에 관한 실험적 연구 - 아파트 기준층 문틀 상단 인방재를 중심으로 -)

  • Kim, Young-Chun;Yoo, Hyun-Dong;Choi, Woo-Jong;Jeong, Sang-Moo;Kang, Myung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.3
    • /
    • pp.29-35
    • /
    • 2013
  • The research is to verify by experiments whether the steel truss structure is able to withstand the load of cement bricks of upper part of a door for the safe use of lightweight steel truss structure instead of concrete lintel which is to be installed at upper part of door frame in building cement bricks for apartment construction. The steel truss is designed in order not to disturb bricks-building and the shape of structure was verified by bending test. According to experiments result, camber was applied to steel structure that enabled construction work to be improved and was proved effective for the prevention of accidents by cement bricks-building load test.

Development of Remote Valve Control System with Power Line Communication (전력선 통신 및 제어기능을 구비한 원격 밸브 제어시스템 개발)

  • Moon, Hyeong-Soon;Kim, Jong-Cheol;Lee, Byeong-Yeol;Kim, Yong-Baek;Kim, Jee-On
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2009.09a
    • /
    • pp.71-79
    • /
    • 2009
  • The world-wide ship construction market is forecast that the considerable portion of shipbuilding and oceanic plant industry will be transferred consequently in China after 5 or 10 years. This point of view where the Korean ship construction industry seizes the initiative from the world-wide ship construction/oceanic field, we must cultivate technical power of base technology, and focus our interests on the development of core parts. In this study, our proprietary remotely operated valve actuator system with power line technology was developed to enhance the installation and commissioning process by our own technology. This paper describes the new design and functions of the remotely operated valve system for shipbuilding and offshore market especially for FPSO.

  • PDF