• 제목/요약/키워드: Index of Performance Evaluation

검색결과 889건 처리시간 0.026초

선박의 적화 상태별 종합내항성능지표에 의한 항해 안전성 평가 (Evaluation of Navigational Safety Using the Integrated Seakeeping Performance Index under Loading Conditions of a Ship)

  • 김순갑;김정만;공길영
    • 해양환경안전학회지
    • /
    • 제4권2호
    • /
    • pp.43-52
    • /
    • 1998
  • Generally, the navigational safety of a ship under various loading conditions is evaluated by a loading manual. However, the loading manual handles only statical factors such as weight and buoyancy of ship without including any wave conditions. Practically ship's safety is much concerned with the occurrences on the rough sea as propeller racing, rolling, deck wetness, vertical acceleration, lateral acceleration, slamming and so on. The purpose of this paper is to present a synthetic and practical evaluation method of navigational safety using the integrated seakeeping performance index(ISPI) under loading conditions of ship in seaways. The method is calculated by means of the ISPI by measuring only vertical acceleration. Judgement of dangerousness is carried out for four lading conditions : homogeneous full loaded, half loaded, heavy ballast loaded, and normal ballast loaded conditions. In developing the practical evaluation system of navigational safety, it is useful to solve the difficulties in measuring factors by sensors. And by applying the evaluation diagrames, navigators are able to avoid dangerousness by keeping away of the danger encountering angle of wave direction which the diagram shows.

  • PDF

공공도서관 수단효율성관련 경영평가기준의 개선방향에 관한 연구 (A Study on the Improvement of the Criteria for the Management Evaluation Related to the Means-Efficiency of Public Library)

  • 정원주;홍현진
    • 한국비블리아학회지
    • /
    • 제28권4호
    • /
    • pp.203-221
    • /
    • 2017
  • 이 연구는 공공도서관의 지속적 발전과 공공성이라는 가치달성을 위해 공공도서관의 수단효율성과 관련하여 경영평가기준의 개선방향을 제시하고자 한다. 이를 위해 민간기업의 경영분석에 대한 이론검토와 그로부터 도출한 분석틀을 이용하여 수단효율성 평가기준을 분석하였다. 그 결과 개선방향은 첫째, 성과의 개념에 충실한 효율성측정의 지표가 다양하고 충분히 개발되어야 한다. 둘째, 일정기간의 투입 대비 성과를 나타내는 동태자료가 부족하여 동태자료로 구성된 평가지표를 보다 많이 개발하여야 한다. 셋째, 장기정태자료는 고정자산 등의 장기적으로 사용 수익되어지는 비용으로서 일정기간의 비용에는 포함 되지 않지만 투입자료로서 유용하다. 이는 완전한 회계를 통해서 반영될 수 있다.

리모델링 공동주택단지의 외부공간 성능평가 비교 연구 (The Comparative Study on Performance Evaluation of Outdoor Space for Remodeling Apartment)

  • 김호윤;이상석;유주은
    • 한국환경복원기술학회지
    • /
    • 제19권4호
    • /
    • pp.1-17
    • /
    • 2016
  • In this study, remodeling projects are perceived as a sustainable urban management policy to boost the value of old apartments and stimulate urban regeneration and development. To evaluate the physical environmental performance of external spaces of remodeled apartments, an evaluation model was developed. After applying it to the target places, the following results were obtained. First, analysis of the external space change index of the target apartments revealed that institutional standards are necessary in line with the building arrangement type, parking lot expansion method, and changes in the building-to-land ratio. Second, the score ratio as to the external space change index performance is as follows: safety (48.30); pleasantness (25.90); convenience (18.90); eco-friendliness (14.90). In other words, "safety" had the biggest score ratio. Third, to boost the external space performance of remodeled apartments, the needs of residents and neighboring environmental plans should be considered from a communality standpoint.

하수관거정비 BTL사업의 효과분석 및 방안 수립 연구 (Development of Evaluation Methodology on the Performance of BTL Sewer Rehabilitation Projects)

  • 송호면;조정일;안충희
    • 상하수도학회지
    • /
    • 제24권6호
    • /
    • pp.743-751
    • /
    • 2010
  • It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.

The Effect of Project Complexity, Team Members' Structure, and Process Index on Efficiency of System Integration Projects

  • Hong, Han-Kuk;Park, Chul-Jae;Leem, Byung-Hak
    • Journal of information and communication convergence engineering
    • /
    • 제6권3호
    • /
    • pp.323-326
    • /
    • 2008
  • Data Envelopment Analysis (DEA) is a theoretically sound framework for performance analysis that offers many advantages over traditional methods such as performance ratios and regression analysis. Largely the result of multidisciplinary research during the last three decades in economics, engineering and management, DEA is best described as an effective new way of visualizing and analyzing performance data. Besides, overseas information technology companies have aggressively tried to enter the domestic market. In the age of globalization and high competition, it is imperative that the system integration (SI) companies need to introduce the performance evaluation models of SI projects, including Capability Maturity Model and Software Process Improvement and Capability Determination, to gain a competitive advantage. Therefore, it makes our research regarding evaluation of SI projects very opportune. The purpose of the study is not only to evaluate efficiency of each project by DEA but also to gain insight into various factors such as project complexity, team members' man-months structure, and process index(project management index) that link to the projects performance.

건물에너지 모니터링 및 시뮬레이션을 활용한 신축건물의 에너지성능평가 (Energy Performance Evaluation of a New Commercial Building using Calibrated As-built Simulation with Monitoring Data)

  • 송수원
    • 설비공학논문집
    • /
    • 제20권3호
    • /
    • pp.155-166
    • /
    • 2008
  • The performance evaluation of a new building is becoming more important because efficient design alone is often not sufficient to deliver an efficient building. However, there is a lack of standard evaluation methods to measure the energy performance of a new construction that has Energy Conservation Design Measures(ECDMs). This study presents an enhanced method based on calibrated whole-building simulation for evaluating the energy performance of new commercial buildings and demonstrates its use using a case-study building, including: an Energy Use Index(EUI) comparison with sub-metered data and an evaluation of the performance of specific ECDMs. The use of this method has determined that the case-study building was shown to use approximately 47% less energy than the base-case building that has the same shape and function as the case-study building(i.e., calibrated as-built simulation mode]), but doesn't include the simulated ECDMs.

스마트시티 구현을 위한 스마트워터그리드 성과평가지표 개발에 관한 연구 (A Study on the Development of Smart Water Grid Key Performance Index for the Implementation of Smart City)

  • 정승권;전계원
    • 한국방재안전학회논문집
    • /
    • 제13권1호
    • /
    • pp.25-39
    • /
    • 2020
  • 현재 스마트시티는 전 세계적인 추진에도 불구하고 스마트워터그리드 조성을 위한 기준이 부재하여 이들의 성공 여부를 판단하기에는 한계가 있다. 스마트워터그리드의 요건과 목표를 설정하고 기존 스마트워터그리드의 한계와 문제점을 정확히 진단하고 개선할 필요성은 분명하며, 이를 위해 스마트워터그리드 목표에 적합한 인덱스의 활용은 매우 중요하다. 따라서 본 연구에서는 스마트워터그리드의 목표측정과 달성정도 평가가 가능하고, 향후 스마트워터그리드 구축을 위한 이행계획에 근거로 활용할 수 있는 스마트워터그리드 성과평가지표(SWG KPI)를 개발하였다. 개발된 스마트워터그리드 성과평가지표(SWG KPI)를 통해 지속적인 스마트워터그리드의 역량평가를 수행할 수 있는 기반을 마련하고, 평가결과로 인한 영향력 확보를 통해스마트워터그리드 성과평가지표(SWG KPI)의 신뢰도 향상과 스마트워터그리드 역량평가를 위한 평가 테이블를 제공하여 계획 중인 스마트워터그리드에 대한 성과평가카드(Challenge Evaluation Card) 작성 및 사전평가 가능할 것으로 기대된다.

지역별 아파트 투자성과에 관한 분석 (Analysis on the Apartment Investment Performance)

  • 강원철;김원희
    • 한국콘텐츠학회논문지
    • /
    • 제13권2호
    • /
    • pp.431-439
    • /
    • 2013
  • 본 연구의 목적은 위험을 반영하여 지역별 아파트 투자성과를 분석하고 지역별 특성의 존재유무를 검증하는 것이다. 분석을 위해 지역별 아파트 투자성과를 장단기로 나누어 분석하였다. 자료수집기간은 2002년부터 2012년의 10년간이며 대상지역은 서울의 강남 북과 6개 광역시이다. 성과평가를 위해 만기 5년의 국민주택1종 채권수익률을 무위험수익률로 사용하고 임대수익계산을 위해서는 만기1~2년 정기예금금리를 사용하였다. 분석결과, 장기투자성과 시에는 서울과 인천은 지역특성이 존재하지 않아 트레이너지표를 사용하여 평가하였으며 지방광역시는 지역특성이 존재하여 젠센지표로 평가하였다. 또 단기성과평가시에는 모든 지역에서 지역특성이 존재하는 것으로 나타나 젠센지표를 사용하여 평가하였다. 모든 지역에서 지역특성이 작용하는 단기 성과평가 결과는 단순수익률로 평가한 결과와 전혀 다른 것으로 나타났다. 따라서 단순 수익률로 성과평가를 할 경우에는 성과에 대한 인식을 왜곡할 수 있음이 드러났다.

문자열 부분검색을 위한 색인기법의 설계 및 성능평가 (Design and Performance Evaluation of an Indexing Method for Partial String Searches)

  • 강승헌;유재수
    • 한국정보처리학회논문지
    • /
    • 제6권6호
    • /
    • pp.1458-1467
    • /
    • 1999
  • 신장해슁이나 B+-트리와 같은 기존의 색인구조들은 문자열의 부분검색을 지원하지 못하거나 부분검색에 제약점을 가지고 있다. 최근 웹 환경에서 동작하는 정보검색 엔진들이 사용하는 역파일의 빠른 검색성능을 가지면서 문자열 부분검색을 효율적으로 지원하는 색인기법을 제안한다. 제안된 색인기법은 기본적으로 역파일 구조이며, 2음절 단위의 패턴으로 색인을 구성함으로써 문자열 부분검색을 지원한다. 제안된 색인기법의 특성을 분석하기 위해 제안된 방법의 성능을 다양한 환경에서 실험을 통하여 비교하고 분석한다. 또한 성능평가를 위해 기존의 역파일 기법, 요약 파일 기법들과 제안하는 색인기법의 분석적 모델을 검색시간과 저장공간 측면에서 세시하고, 그 모델을 기반으로 그들의 성능을 비교한다. 분석적 비교모델을 통한 성능비교 결과, 제안된 부분검색을 위한 색인기법은 저장공간의 오버헤드는 크지만 기존 요약 파일 기법에 비해 검색성능을 상당히 향상시킨다.

  • PDF

BSC 전략맵 지표를 이용한 정보기술 투자평가 : 방법론과 사례연구 (IT Investment Evaluation Using the Indices Generated from the Balanced Scorecard Strategy Map : A Method and Case)

  • 최덕원;이동욱;이동철
    • 대한산업공학회지
    • /
    • 제31권2호
    • /
    • pp.143-151
    • /
    • 2005
  • Information technology(IT) investment evaluation requires measurements from many perspectives. Except for the case of financial performance, these measurements mostly belong to the qualitative or intangible domain. The problem with IT investment evaluation lies in the fact that it is very difficult to define the qualitative properties against which to measure the performances. This paper addresses the issue of developing the set of performance indices, and defining the structural relationships between them, such that the IT investment evaluation can be done in a systematic, objective and comprehensive manner. We introduce the balanced scorecard strategy map as the backbone reference frame for the generation of performance indices and for the description of the relationships between them. Sample indices for evaluating projects from strategic perspectives are provided with a case example. A step by step follow through of the index generation process has been presented along with the case.