• Title/Summary/Keyword: Improvement order

Search Result 8,790, Processing Time 0.033 seconds

A Study on the Design Improvement of Digital Government for User-Centered Public Services in Korea (사용자 중심의 공공서비스를 위한 디지털 정부 서비스디자인 개선방안 연구)

  • Lee, Eun Suk;Cha, Kyung Jin
    • Journal of Information Technology Services
    • /
    • v.20 no.5
    • /
    • pp.137-146
    • /
    • 2021
  • Recently, public participation in government policy design has been further expanded and public services perceived by users are expanding. At this time, the role of the digital government and the direction of the service to be pursued are user-centered, and above all, it is necessary to focus on the keywords of pre-emptive, preventive, and customized. In order to propose service quality improvement in the public sector, service user-centered classification and monitoring are integrated and the usability of government documents is improved. It is necessary to identify the needs of whether to provide a path for public participation. In the post-corona era, people are accessing quarantine information from the digital government every day. The government should proactively respond to the acceleration of digital transformation and the non-face-to-face demands of the people who experience non-face-to-face daily life. In order to evolve into a smart organization along with the innovation promotion plan and to provide customized services, it is necessary to use existing guides for institutional and technical improvement, along with new technology and data-based analysis, to strive for change management. The government should seek counter-measures that have advanced one step ahead by incorporating new high-tech IT with user-centered necessary services. This study aims to derive improvement plans to provide user-centered digital government service design when designing public services and collecting public opinions. Based on the e-government development model research and the existing research on user-centered service design in the public sector, institutional and technical measures are provided for the improvement of digital government service design.

A Study on the Possiblity of Schedule Speed Improvement for Kyeongbu HSR (경부고속철도의 표정속도 향상 가능성에 대한 고찰)

  • Yun, Jang-Ho;Eum, Ki-Young;Park, Jung-Hyun;Ryu, Seong-Chan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1793-1801
    • /
    • 2011
  • The domestic railway has high speed trains as good as those of countries outside Korea, but the schedule speed in the domestic railway, which is calculated by dividing distance to destination by time, is lower than that of overseas trains. The object of this study is the necessity for the improvement of schedule speed in the Kyeongbu High speed railway. This study was conducted with analyzing foreign cases related to the improvement of schedule speed in order to satisfy the increasing traffic demand. The schedule speed against the high speed of railway advanced countries is over 65%, while it is about 50% in the domestic railway. In conclusion, This study confirmed that there are possibilities and plans about the improvement of schedule speed for using TPS analysis in the Kyeongbu High speed railway.

  • PDF

Clinical Study of HPS-A on Various Digestive Symptoms (각종 소화기 증상에 대한 HPS-A의 임상실험)

  • Cho Chong-Kwan
    • Journal of Oriental Neuropsychiatry
    • /
    • v.3 no.1
    • /
    • pp.107-116
    • /
    • 1992
  • In order to study the effect and safety of HPS-A on various digestive symptom, it was taken 3 times a day for 2 weeks on 31 patients. The results were as follows ; 1. The sex distribution was male 42% and female 58% 2. The age distribution was thirties 35% twenties 20%, forties 19% 3. The average improvement rate after 1 week was 85.2% and improvement rate of each symptom was epigastric soreness 89.9%, dyspepsia 85.1%, hunger pain 84.6% 4. The average improvement rate after 2 weeks was 94.5% and improvement rate of each symptom was epigastric soreness 96.6%,hunger pain 96.5%, dyspepsia 96.3% 5. No cases were showen side effects. Aecording to the above results, it is proved that PHS-A can be applied to care gastritis and early peptic ulcer.

  • PDF

Improvement of Negative Bias Temperature Instability by Decoupled Plasma Nitridation Process (Decoupled Plasma Nitridation 공정 적용을 통한 Negative Bias Temperature Instability 특성 개선)

  • Park, Ho-Woo;Roh, Yong-Han
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.18 no.10
    • /
    • pp.883-890
    • /
    • 2005
  • In this paper, the established model of NBTI (Negative Bias Temperature Instability) mechanism was reviewed. Based on this mechanism, then, the influence of nitrogen was discussed among other processes. A constant concentration of nitrogen exists inside $SiO_2$ in order to prevent boron from diffusing and to increase dielectric constant. It was shown that NBTI improvement was achieved by controlling nitrogen profile. It was supposed that the existence of low activation energy of Si-N bonds at $Si-SiO_2$ interface attributes the improvement by making hydrogen prevent interface traps. It was also shown that improvement of NBTI can be achieved by more effective control of nitrogen profile. It was supposed that the maximum control of nitrogen profile can be achieved by DPN (Decoupled Plasma Nitridation) process.

The Improved Device of Seoul Subway Fare System (서울 지하철의 운임제도 개선방안)

  • Lee, Tai-Sik;Jun, Young-Joon;Kwon, Ou-Chul;Chung, Jong-Ky;Lee, Dong-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.200-205
    • /
    • 2006
  • Subway widely used as a major mean of public transportation both at home and abroad contributes to ease chronic traffic congestion in cities. However, subway operating expense is expected to increase continuously because subway requires vast amount of money at the construction stage, huge sum of maintenance cost is spent during operation, and passenger needs for more convenient facilities is increasing. on the contrary to enormous operating expenses, fare that is occupying most of operating income doesn't come up to its prime cost causing chronic operating deficit. It is urgent to prepare fare system improvement measures to increase operating income in order to resolve financial difficulty of a subway operating organization. Therefore, the current study analyzed present condition and problems of subway fare system, and suggested improvement measures such as improvement of fare adjustment procedure, improvement of free-ride system, diversification of ticket, etc.

The Impact of Information Lead Time Improvement on the Distributed Supply Chain System (분산형 공급체인에서 단계별 정보지연 개선이 주는 효과)

  • 김철수;최근영
    • The Journal of Information Systems
    • /
    • v.10 no.2
    • /
    • pp.129-150
    • /
    • 2001
  • In this study, we model a decentralized supply chain system which is managed by four types of centers, sequentially located: Retailer, Wholesaler, Distributor, and Factory Each center contributes to enhancing the performance of the supply chain system individually with its own local inventory information. Through experiments which are performed with a programmed simulation (like the MIT beer game), we investigate how the information lead time improvement in each center affects the whole system. And we show that the impact of the lead time improvement in the downstream, like retailers, affects more to the system than the one in the upstream, like factories, in a cost-effective way. Moreover, by using information lead time for each center, we analyze how much the extent of the improvement affects the whole system, especially for the total cost and the order level.

  • PDF

Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects (농어촌정비사업 공종별 실적공사비 적산시스템개발)

  • 김현영;이정재;김영기;오상원;전효묵
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.3
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF

a study on ground improvement of sandy soil by CGS Method (압밀주입에 의한 지반개량 특성고찰)

  • Gwak, Soo-Jeong;Baek, Hong-Ryul
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.185-192
    • /
    • 2006
  • In this study the case of ground improvement by CGS as injection method were analyzed in order to find out effect of behavior of sandy soil and the application of this method as ground improvement. The study were analyzed N value after CGS work of sandy soil by many sites test. Considering that increase of N value, CGS can be considered as an effective method to increase the bear capacity as well as constrain the settlement of soft ground From the results of this study, N value after CGS work of sandy soil were closed to N value of ground and relative density(Dr), improvement ratio(As) of grouting and the study will be done continuously for finding out relation of them

  • PDF

A Study on the Innovative Scheme of the Public IT Project Ordering and Receiving Systems (공공 IT 프로젝트 수발주 제도의 개선방안 연구)

  • Oh, Jong-Woo;No, Gyu-Seong;Kim, Sin-Pyo
    • Journal of Digital Convergence
    • /
    • v.4 no.2
    • /
    • pp.97-108
    • /
    • 2006
  • The purpose of this study is to generate a proper regulation improvement direction of the public If project contract law through the current four contract methods and three methods of the awarding party of a contract method. The research method for this paper is derived from the written materials of the present public IT project contract law. Two problems have been processed in order to produce the results: the current contract methods and the awarding party of a contract method. The current contract methods consist of a competition contract, a private contract, and a supply methodology contract, The methods of the awarding party of a contract display a qualified evaluation regulation, the 2nd step competition bid, a standard cost separation tender, and a contract by a negotiation. The results exhibit that the general competition contract consists of four improvement items. The contract by a negotiation contains five improvement items. The group private contract has one improvement item. And the private contract includes one improvement item. These results implicate that the current public IT project contract law demands better improvement work for the ubiquitous Korea.

  • PDF

A Study on the Legislation Scheme of the Public IT Project Ordering and Receiving Systems (공공IT 프로젝트 수발주 제도의 법제화 방안 연구)

  • O, Jong-U;No, Gyu-Seong;Son, Dong-Gwon;Kim, Sin-Pyo;Lee, Geun-Bae;Park, Yeong-Min
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.319-353
    • /
    • 2006
  • The purpose of this study is to generate a proper regulation improvement direction of the public IT project contract law through the current four contract methods and three methods of the awarding party of a contract method. The research method for this paper is derived from the written materials of the present public IT project contract law. Two problems have been processed in order to produce the results: the current contract methods and the awarding party of a contract method. The current contract methods consist of a competition contract, a private contract, and a supply methodology contract. The methods of the awarding party of a contract display a qualified evaluation regulation, the 2nd step competition bid, a standard cost separation tender, and a contract by a negotiation. The results exhibit that the general competition contract consists of four improvement items. The contract by a negotiation contains five improvement items. The group private contract has one improvement item. And the private contract includes one improvement item. These results implicate that the current public IT project contract law demands better improvement work for the ubiquitous Korea.

  • PDF