• Title/Summary/Keyword: Implementation Phase

Search Result 1,247, Processing Time 0.025 seconds

Development, implementation and verification of a user configurable platform for real-time hybrid simulation

  • Ashasi-Sorkhabi, Ali;Mercan, Oya
    • Smart Structures and Systems
    • /
    • v.14 no.6
    • /
    • pp.1151-1172
    • /
    • 2014
  • This paper presents a user programmable computational/control platform developed to conduct real-time hybrid simulation (RTHS). The architecture of this platform is based on the integration of a real-time controller and a field programmable gate array (FPGA).This not only enables the user to apply user-defined control laws to control the experimental substructures, but also provides ample computational resources to run the integration algorithm and analytical substructure state determination in real-time. In this platform the need for SCRAMNet as the communication device between real-time and servo-control workstations has been eliminated which was a critical component in several former RTHS platforms. The accuracy of the servo-hydraulic actuator displacement control, where the control tasks get executed on the FPGA was verified using single-degree-of-freedom (SDOF) and 2 degrees-of-freedom (2DOF) experimental substructures. Finally, the functionality of the proposed system as a robust and reliable RTHS platform for performance evaluation of structural systems was validated by conducting real-time hybrid simulation of a three story nonlinear structure with SDOF and 2DOF experimental substructures. Also, tracking indicators were employed to assess the accuracy of the results.

A Comparative Research on the Reconstruction and Remodeling of Low-rise, Dilapidated Apartment Buildings (노후저층 공동주택의 재건축과 리모델링 사업의 비교 연구)

  • 이효진;김동훈;김진호;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.75-80
    • /
    • 2002
  • The purpose of this study is to conduct researches on the aspects of reconstruction and remodeling of low-rise, dilapidated apartment buildings in the provinces, using comparative methodologies, consequently coming up with the findings in the following. 1) Unlike the rebuilding projects in which the movement process tends to be made in a bulk (in a simultaneous manner), it turns out that when it comes to remodeling, it would be advisable to attempt moving the inhabitants as a group either by the size of their residence or by the building. 2) Given the peculiarities of the construction management mechanism, remodeling projects might seem disadvantageous on the part of the management on account of inadequate accumulation of information and experience. Hence, based on the impeccable assessment of the current status of the subject buildings from the phase of planning, its imperative to closely look into and take into consideration a variety of direct and/or indirect factors in advance of the implementation. 3) A series of comparative researches from the perspective of economical efficiency that remodeling projects appear profitable considering the overall costs including financial expenses, varied taxes, and so on that will be eventually brought forth during the reconstruction period, and all the more so when allowing for the consequential effects which they ought to have upon the natural and human resources, environmental and ecological condition, business potentials, etc. Amelioration to be desired on the basis of the findings above.

  • PDF

The Development of Prototype Synchronized Phasor Measurement Device for Real-time Power System Monitoring (전력계통 실시간 감시를 위한 동기위상측정장치의 시작품 개발)

  • 김학만;전진홍;김종율;남기영
    • Journal of Energy Engineering
    • /
    • v.11 no.3
    • /
    • pp.230-236
    • /
    • 2002
  • In real-time power system control, it is essential to measure the power system variables which are voltage, current, real and reactive power, power factor, system frequency and etc. These variables can be estimated or calculated by the synchronized phasor informations of voltage and current. Therefore, the synchronized phasor measurement of voltage and current is very important to real-time power system control. So, we develop SPMD (Synchronized Phasor Measurement Device) for synchronized phasor measurement of voltage and current. In this paper, we present the design and implementation of SPMD for real-time phasor measurement and the test results of developed SPMD on 380 V 3 phase distribution line in laboratory with resistor load and RTDS (Real Time Digital Simulator).

A Implementation of an Efficient Starting Line-up System using the Forward Channing Technology (전향참조 기법을 이용한 효율적인 선발 라인업 시스템 구현)

  • Park, Hong-Jin;Kwon, Soon-Hwan
    • Journal of Internet Computing and Services
    • /
    • v.9 no.3
    • /
    • pp.79-90
    • /
    • 2008
  • This paper introduces how we have designed and implemented an efficient starting line-up system of professional baseball players, using the forward chaining technology which is an expert system technology. The knowledge base adopted holds 286 players and 148 evaluation Items. Each player's competitiveness is measured as a numerical value in points through 2 different phases. The 1st phase point represents the static information of the target player and the 2nd his dynamic information. This paper gets a representative value of the player, which is used as the basis on which an efficient line-up system in views of both game environments and counterparts is constructed.

  • PDF

Robust Parameter Design via Taguchi's Approach and Neural Network

  • Tsai, Jeh-Hsin;Lu, Iuan-Yuan
    • International Journal of Quality Innovation
    • /
    • v.6 no.1
    • /
    • pp.109-118
    • /
    • 2005
  • The parameter design is the most emphasized measure by researchers for a new products development. It is critical for makers to achieve simultaneously in both the time-to-market production and the quality enhancement. However, there are difficulties in practical application, such as (1) complexity and nonlinear relationships co-existed among the system's inputs, outputs and control parameters, (2) interactions occurred among parameters, (3) where the adjustment factors of Taguchi's two-phase optimization procedure cannot be sure to exist in practice, and (4) for some reasons, the data became lost or were never available. For these incomplete data, the Taguchi methods cannot treat them well. Neural networks have a learning capability of fault tolerance and model free characteristics. These characteristics support the neural networks as a competitive tool in processing multivariable input-output implementation. The successful fields include diagnostics, robotics, scheduling, decision-making, prediction, etc. This research is a case study of spherical annealing model. In the beginning, an original model is used to pre-fix a model of parameter design. Then neural networks are introduced to achieve another model. Study results showed both of them could perform the highest spherical level of quality.

An Empirical Study about the Impacts of Object-Oriented Diagrams On the Inter-Organizational Process Integration (객체지향 다이어그램을 이용한 기업간 프로세스의 통합에 관한 실증적 연구)

  • Nam, Jee-Won;Kim, Jin-Woo
    • Korean Management Science Review
    • /
    • v.15 no.2
    • /
    • pp.109-124
    • /
    • 1998
  • Recently, as the importance placed on the design phase of system development has increased, the use of diagrams to design the overall system before implementing the actual program code has seen a proportionate increase. This study focuses on the diverse diagrams depicting organizational processes when integrating multiple processes of individual organizations to form an Inter-Organizational System(IOS). In this study, we attempt to identify the critical representation features of process diagrams that enable the effective integration of Inter-Organizational processes. In particular, the effect of the mapping relationship between the representation features of different diagrams to be integrated was tested empirically in a laboratory setting. The experimental task consisted of integrating the processes of two organization based upon the given process diagrams. Actual business processes were selected from real world cases and process diagrams were formulated based upon existing object-oriented notation. An analysis of the errors committed by the subjects during the integration process indicated that the mapping relationship between the diagram features representing the respective organizational processes had a significant impact upon the final integration outcome. Based upon these results, the present study provides a guideline for process diagrams that are crucial to effective Inter-Organizational process implementation and maintenance.

  • PDF

Study on the stabilisateur of information transmission in RF-CBTC train control system using the FHSS system (FHSS방식을 채용한 RF-CBTC 열차제어시스템 정보 전송의 안정화에 관한 연구)

  • Oh, Sea-Hwa;Jin, Zhe-Huan;Lee, Key-Seo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.9 no.4
    • /
    • pp.455-468
    • /
    • 2014
  • This paper presents seamless hand off implementation suggesting algorithm and Measuring /testing at the tunnel environment in order to derive the ideal value of wireless data transmission in RF-CBTC train control system modeled by Shinbundang Operation System. In addition, it proposes the ideal value(-57dB) for reducing the re-transmission or frequency interference rate and demonstrates frequency optimization which enables highly reliable data communication in Train control system using wireless communications. Based on these result, Shinbundang phase 2 plan to apply to this system.

Implementation of Ka-band Low Noise Block Converter For Satellite TVRO (Ka-band 위성방송수신용 저잡음 블록 변환기 구현)

  • Lim, Jin-Won;Kim, Tae-Jin;Park, Ju-Nam;Rhee, Young-Chul
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.3 no.2
    • /
    • pp.93-100
    • /
    • 2008
  • In this paper, Low Noise Block down converter(LNB) is designed for a Ka-band satellite television receiver only(TVRO) using commercially available MMIC. Designed Low Noise Block down-converter is composed of three stage amplifiers involving input noise matched at first amplification stage, image reject band pass filter, frequency mixer and intermediate frequency amplification. Through LNB Module power budget to obtain gain and attenuation, Optimum LNB devices satisfying Ka-band LNB technical specification are selected. Experimental results of designed Ka-band LNB yields conversion gain of over $58{\pm}1dB$, noise figure of less than 1.5dB and phase noise of -94.6dBc @10KHz.

  • PDF

Implementation of a Vector Control System of CRPWM Inverter Fed Induction Motor (CRPWM 인버터로 구동되는 유도전동기의 벡터제어 시스템 구현)

  • 김종진;김홍근
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.10 no.3
    • /
    • pp.55-63
    • /
    • 1996
  • In this paper, a vector control system is implemented to drive CRPWM inverter fed induction motor. The rotor flux is estimated using the rotor coordinates flux model and the stator coordinates ramp comparison controller is used as a current controller. The microcontroller 80C196 is used for the computation of the estimation of the rotor flux, the speed controller, the flux controller, the vector rotation, and the phase transformation The current controller is implemented using the analog circuit in order to reduce the burden of the microcontroller. For the proposed system, the digital simulation is performed to examine the feasibility and the superior characteristics of the current controller and the system transient response is verified through the experiment.

  • PDF

Development, Implementation and Experimentation on a dSPACE DS1104 of a Direct Voltage Control Scheme

  • Hmidet, Ali;Dhifaoui, Rachid;Hasnaoui, Othman
    • Journal of Power Electronics
    • /
    • v.10 no.5
    • /
    • pp.468-476
    • /
    • 2010
  • This paper proposes and develops a new direct voltage control (DVC) approach. This method is designed to be applied in various applications for AC drives fed with a three-phase voltage source inverter (VSI) working with a constant switching time interval as in the standard direct torque control (DTC) scheme. Based on a very strong min(max) criterion dedicated to selecting the inverter voltage vector, the developed DVC scheme allows the generation of accurate voltage forms of waves. The DVC algorithm is implemented on a dSPACE DS1104 controller board and then compared with the space vector pulse width modulation technique (SVPWM) in an open loop AC drive circuit. To demonstrate the efficiency of the developed algorithm in real time and in closed loop AC drive applications, a scalar control scheme for induction motors is successfully implemented and experimentally studied. Practical results prove the excellent performance of the proposed control approach.